Loading...
HomeMy WebLinkAboutRe: sewer connection/availability i 4.20 aw i� cepad � iT Ti lj� AL i N CA pl � CITY of ORONO .� Yost Office Box 669 Crystal Bay,Minnesota W23 N' Offices _ o On the North Shore of Lake Minnetonka . I August 12, 1981 i Michael J. Flannery 420 Tonkawa Road Long Lake, MN. 55356 Re: Sewer availability to your property Dear Mr. Flannery: } it has .come to our attention that you may be contemplating connecting to the municipal sewer system: A sewer stub does exist near your property, via which you could physically connect to the system. However, your lot is considered as part of the Rural Service Area, and was never assessed for the cost of the 197371 sewer project which serves Tonkawa :toad. Before we can issue a permit for you to connect to the sewer, you must request in writing that the City Council allow the connection. If approved, the Council would determine the assessment amount to be paid. In addition to the assessment, the City would require a $425.00 Sewer Availability Charge and a $20.50 permit fee. I would recommend that if you plan to proceed with .the con- nection that you make your request in writing, to my attention, as soon as possible. The alternative would be permanent repair of your septic system. If you have any questions, feel free to call me at 473-7357. Sincerely, A 0 son Coity Planner BUILDING do ZONING—473•:357 • ADMINISTRATION A FINANCE—473.73S8 • PUBLIC WORKS—473-7359 ASSESSING RE N 'Ing .i O `a� O CITY of ORONO vs, !� Municipal Offices Street Address: Mailing Address: `9.kzsuog' 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 July 21, 1999 Donna Snyder Carlson Companies P.O. Box 59159 Minneapolis, MN 55459-8215 Re: Sewer Connection Charges, 420 Tonkawa Road (PINS 05-117-23 32 0001) Dear Ms. Snyder: City records indicate the above referenced property was not assessed for municipal sewer at the time sewer was installed in Tonkawa Road in the mid 1970's(please see attached letter from City Planner Alan Olson dated 8/12/81). This property was at the very end of the sewer line at that time and apparently was either considered as not abutting it, or was given the choice to 'opt out'. Note that since that letter,the property has been incorporated into the Urban Service Area;this occurred when sewer was extended to the West Lake Street neighborhood in 1992. Properties which are now connecting to sewer but which never were assessed originally for the costs of the sewer, are required to pay a Sewer Connection Charge at the time of connection. Per the attached excerpt from the 1999 City Fee Schedule, the amount due for connection to the 1973-1 sewer lines is $12,590. Additionally due prior to connection is the Metropolitan Council Wastewater Services$1,050 Sewer Availability Charge(SAC)which is a pass-through fee(collected by the City and forwarded to Met Council). This charge is due for each new residential connection to the Metro sewer system. Please forward payment in the total amount of$13,640 payable to the City of Orono.If you have any questions,please feel free to contact me at 612-249-4600. Sincerely, Michael P. Gaffron Senior Planning Coordinator encl. Telephone(612)249-4600 • Fax(612)249-4616