Loading...
HomeMy WebLinkAboutMCWD permit MINNEHAHA CREEK WATERSHED DISTRICT QUALITY OF WATER "" QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, The Minnhaha Creek maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant Watershed Disl.rict is named below for use and development of land in the Minnehaha Creek committed to a Leadership Watershed District. rale in protecting, improving and managing Issued to: Angelo & Rachel Licursi Permit No: 10-066 the surface water and Location: 4655 Tonkaview Lane Orono affiliated groundwater Purpose: Erosion Control reses.irces within the Date of Issuance: 3/31/2010 Date of Expiration: 3/31/2011 District including their By Order of the Board of Managers relationships to the ecosjstems of which Becky, .19oudek they are an integral part. District Technician We achieve our mission This permit is not transferable without District approval, and is valid to the date of through regulation, expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the capital.projects, permit must be received by the District at least 30 days before expiration. education,cooperative The applicant is responsible for compliance with all District Rules and for the endeavor,and other action of their representatives, contractors, and employees. programs based on Conditions: Project to be completed as described in plans submitted to the MCWD office on March 26, 2010 according to the provisions of sound science, this permit. Innovative thinking,an • Properly install and maintain all required MCWD Rule B, erosion control measures until the disturbed areas are re- infonned and engaged stabilized constituency,and the • When the site is re-stabilized and the MCWD staff has performed a final inspection, all silt fences must be removed cost effective use of pubtic funds. (Statement concerning fees for inspections, violations, etc... on following page) 18202 Minnetonka Boulevard, Deephaven, MN 55391 • Office: (952)471-0590• Fax: (952)471-0682•www.minnehahacreek.org MINNEHAHA CREEK WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Inspection/Analysis/Monitoring Fees The iMinn paha Creek A site inspection and monitoring by District staff will be performed where the Waterbed District s activity involves: committed to a leadership • a commercial/industrial/multi-family residential development rote in protecting, . a single family residential development greater than 5 acres or of any size if improving and managing within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland the surface waters and • dredging within the beds, banks or shores of any protected water or wetland • a violation of it;afied groundwater • any project which in the judgment of the District staff should be inspected resources within the due to project location, scope, or construction techniques District,including their relationships to the In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected ecosystems of which by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least$35. they are an integral part. Ne achieve our mission through regulation, Standard Fee Schedule capital project, District professional staff $ 55.79" education,cooperative District interns $ 34.244 District clerical staff $ 50.40" endeavors,and other Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $ contracted rate programs based on District Counsel $ contracted rate sound science, Application fee $ 10.00 Copy costs $ .25 + actual staff time Innovative thinking,ars Color copy costs $ 1.00 + actual staff time informed and engaged Audio tapes $ 20.00 each Watershed Plan (Paper) $ cost of production constituency,and the Watershed Plan CD $ 10.00 each CIP $ 10.00 each cost effective use of public funds. * Hourly 18202 Minnetonka Boulevard, Deephaven, MN 553910 Office: (952)471-0590•Fax: (952)471-M2•www.minnehahacreek.org