HomeMy WebLinkAbout2016-01578 - demo CITY OF ORONO * z 0 1 6 - 0 1 x 7 8
2750 KELLEY PARKWAY DATE ISSUED: 01/20/2017
ORONO,MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS 230 TONKA AVE
PIN 05-117-23-14-0029
LEGAL DESC BAYSIDE ADDN TO LAKE MINNETONK
LOT 000 BLOCK 002
PERMIT TYPE DEMOLITION
PROPERTY TYPE RESIDENTIAL
CONSTRUCTION TYPE DEMO-PRINCIPAL STRUCTURE
ACTIVITY 645-SINGLE FAMILY HOUSES(ATT&DET
NOTE: (SAC PAID#5108 05/04/1993)&SEWER DISCONNECT ISSUED ON 01/20/17#2017-00057
1. FOUNDATIONS/ALL DEMO DEBRIS TO BE REMOVED FROM GROUND&DISPOSED OF OFF SITE,PER PCA REGULATIONS.
2. WELLS MUST BE ABANDONED.
3. INSPECTIONS DONE BEFORE BACKFILLING.
NOTE: A 24-48 HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. CALL(952)249-4600.
SEWER MUST BE DISCONTINUED AT THE CITY SERVICE BY QUALIFIED CONTRACTOR BEFORE DEMO PERMIT IS ISSUED. CHECK
TO MAKE SURE THIS PERMIT HAS BEEN PULLED BEFORE ISSUING THIS PERMIT.
APPLICANT DEMOLITION-PRINCIPAL STRUCTURE 75.00
STATE SURCHARGE DEMO 1.00
EVERLAST ENTERPRISES INC. TOTAL 76.00
4109 NORTH SHORE DR Payment(s)
MOUND,MN 55364- CREDIT CARD 0474
(952)472-7287 76.00
Minnesota State License#: BUIL-BC591566
OWNER
Everlast Enterprises Inc
4109 NORTH SHORE DR
MOUND,MN 55364-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
F7
Appli ant Permitee Signature ate Issued By Signature Date
�ON City of Orono FOR MY USE ONLY �^
P.O.Box 66 Date ReceivedPermit#�7 J 7�
2750 Kelley Parkway
Crystal Bay,MN 55323 Amount: $� SAC Credit:
(952)249-4600 J
yHomeowner(s)Signed: ❑Yes
Resolutions(if any)Signed:❑Yes ❑None Required
�AkES H O 6 Zoning Disclosure Signed: ❑Yes ❑None Required
CITY OF ORONO - DEMOLITION PERMIT
(All permits must be approved by the Building Official and/or Zoning Department)
Job Site/Owner Information:
Type: n Residential ❑ Commercial
Site Address: 230 TONKA AVE, ORONO, MN 55356
Owner: Everlast Enterprises Inc Mailing Address: 4109 No Shore Drive
City: ORONO Zip: 55364
Phone: 612-868-0748 Email:
Contractor/Applicant Information:
Contractor/App.: James Cleary Contact Person: James Cleary
Address: 4109 No Shore Drive State License 1,5 LL
City: Orono Zip: 55364 Expiration Date: i I,;L bt
T
Phone: 612-868-0748 Email: Jim@EveriastEnterprises.com
SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT
General Instructions:
1. You may be required to obtain other permits, i.e.: well abandonment, sewer, etc.
2. Work must not begin unless the permit card is available on the job site.
3. A 24-48 hour notice is required for all inspections. Call (952)249-4600.
4. Sewer must be discontinued at the City service by qualified contractor before demo permit is issued.
Demolition by means of: ❑ Manual Disassembly RJ Heavy Equipment ❑ Other
Permit(s) Issued: Sewer Disconnection ❑Well Abandonment#
In return for issuance of said Demolition Permit, the undersigned owner hereby agrees to:
1. Submit a survey, aerial photo or sketch showing all structures on the property. Note which structures are
to be demolished.
2. Submit a survey, aerial photo or sketch showing proposed erosion control measures in accordance with
Chapter 79, Construction Site Runoff Control.
3. Submit a copy of permit approval from the Minnehaha Creek Watershed District (MCWD). The City will
not issue a demolition permit without a copy of the permit(s) from the MCWD or documentation stating
permit(s) are not required. (� p
Form Last Updated. July 2015 t o -Q tel' L RECEIVED ED
150784
DEC 2 8 2016
CITY OF ORONO
4. Submit a$2,500 escrow and an escrow agreement signed by the property owner(copy attached).
5. Keep all structure(s)enclosed and/or secured until such time as demolition is complete.
6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior
approval is obtained in writing for temporary use thereof.
7. Completely remove foundation(s)from the ground.
8. Completely dispose of all demolition debris off site in accordance with all applicable PCA requirements.
9. Abandon water wells in accordance with State Health Department regulations.
10. Call for an inspection when all debris has been removed, before backfilling.
11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be
left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground
elevation (except when such excavation is to be used as part of a new building and such new building is
actually under construction).
12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed
and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are
crushed and filled.
13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents,
employees and assigns from and against all claims, damages, losses or expenses, including attorney
fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition
described herein as performed by the property owner, his employees, agents, subcontractors or assigns.
PERMIT TYPE AND FEE CALCULATION
❑x $75.00 — Principal Structure R $ 75.00
❑ $50.00 —Accessory Structure x (how many)
1. Subtotal of above permit requested $
2. State Surcharge 1.00
3. TOTAL PERMIT FEE (add lines 1-2 above) $ 76.00
The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do
all the work in a strict accordance with the ordinances of the City and the regulations of the State of
Minnesota, and certifies that all statements made on this application are complete, true and correct.
Applicant's Signature: _ Date: ( Lx- 6
Owner's Signature: Date:
25
Approved B
pp Y: �I Date:
Bui ding Official)
*Zoning Disclosure Required? ❑ YES ® NO
*This must be filled out by Zoning Department—For either answer, a Zoning Official must sign all applications.
*Approved By: Date:
(Zoning Official)
$(d9 P&mi f # 2010- 01577
Form Last Updated: July 2015 (�f3 O U h VKJ #ILI,
150784
Building Permit Survey
I PreP ored for:
96a Everlast Enterprises
a
65
ol,
6
Brook St
N89 3858"W 125.25
40 O
ry l ^ I q5q. 1
I V
Proposed Driveway
i n
61
961
y 9 (961)
h I
(961.3) 961.51 J a v
m I9.J c 22. O •� t
4ti. -Js I W
aa
---- 30.2 ---- I i '- f0.1 =-
i G h -^^
QI x l i e� fi
o 1
•� O � 59� ig59"}
pas. 2. ----- - -- 53.4 ---------- � W
3 Pro o d Walk I Proposed.N
^+ �.� F8C0 / to7--
lis $o
N TOF=962:3 n 60 0 tiM211Grove/Driveway a rfg=961.5 0 9 i 4` $
` a Deck _ - ---------
�o (to be removed) o U° LFE=954.5 10.0 ~--- 4 O
5
! 7 ?e 2
o 959 1 95B. ) 1 g. .,. ConGieSa
c , (958 £ 95&B) IE/W)(958.5) — l.e E
`- ♦- 958) i —
a
1
Existing Hous W 3
FF£=960.5 y
Y
� 7(g5 j GFE=959.4 ^ e g
� (to,be remo
MH 956.9 1 -` be a/ qti w �- 4 g \
P 5
q •ti L9x
{. gap\o. JJJ g6a.1 '
` f s 9so SCALE
0 10 io
40 q5b 1 r i
N89;34'55'W 0125.21 (Comp.) 125.25 (plot) — 1 inch - 20 feet
ss.
:C0
5�o.� Address:
xistin House I 230 Tonka Ave
�j/// Orono, MN 55356
111, 1`
95ti
Existing Hardcover Calculations(so, ft.) proposed Hardcover Calculations (so, RJ Boundary Oescrinfion (supplied byclient)
Nouse 2,131 House 1,887 Lots 14, 15 and 16, Block 2, BAYSIDE ADDITION TO
Grovel Driveway 664 Driveway 1,539 LAKE MINNETONKA, according to the recorded plat
Pavers 115 Porch 289 thereof, Hennepin County, Minnesota. Subject to any
Concrete 77 Deck 129 and all easements of record.
Stoop & Step 68 3,815
3,055 Proposed Elevations:
Lot Area 18,793 Top of Block = 962.3
Lot Area 18,793 Garage Floor= 961.5
Total Hardcover 16.3x
Total Hardcover 20.3X Bosement Floor= 954.5
Bearings based on assumed datum.
Job Number: 8301
SCHOBORG I hereby certify that this certificate of survey was
direct
prepared by me or under my direct supervision and BookyPage: LL
that / am a duly Registered Land Surveyor under the
laws of the State Minnesota. Survey Date: 9/27/16
LAND SERVICES
Drawing Name: everlost.dwg
INC. _ Drown by. DMS
Paul B. $choborg Revisions:
763-972-3221 8997 Co. Rd. 13 SE y
www.SchaborgLand.com Delano, MN 55328 Dote: r .c -' 4_!�' Registration No. 14700
r
4
i
Lid
i
♦11' '. ,
DATE TIME
Ci O ORONO CALLED IN
INSPECTION NOTI E G!5W SCHEDULED 7
PERMIT NO. COMPLETED
ADDRESS a -To t a
OWNER TELEPHONE NO. ala- 7VY
CONTRACTOR Caf '
DESCRIPTION
W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
C ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
v ❑ DEMO-SITE ❑ C INSTALL
z OWNBUC ONTRACTOR TO MEET YOU _NO
y COMMENTS:
110
Gy t7 Al
W
¢
Q
W �WORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE
W ❑CORRECT WORK a PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
O CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN
INSPECTOR WILL RETURN
❑CITATION ISSUED
[ISTOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Can for the next Inspw*m 24 hours In advance. (952) 249-4600
on shm
Inspector: +w
WMb CMAnWocUw%FIM Conry CoPldSib Notley
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE _ SCHEDULED
PERMIT NO. COMPLETED
ADDRESS 2,30 7dg*4 give
OWNER TELEPHONE NO.
CONTRACTOR C--!Alas ses LrtC'•
DESCRIPTION
i
Ma ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
C ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL ❑ TREE REMOVAL i
Z ❑ LATHE ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑COMPLAINT i
Q ❑ FINAL ❑WATER HOOK-UP C®fPottovFUP j
❑AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
❑ DEMO-SITE ❑ SEPTIC INSTALL
2 OWNERICONTRACTOR TO MEET YOU:_YES_NO
COMMENTS-
ft
e c
c LL
m ��/Bi •e !� G n
S /l�fiJ S. /�- ✓ SIL 7�ij'S
w 31
W
a
Uj ❑WORK SATISFACTORY PROCEED C*PRWEQ_TCOMPLETE
W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
C ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN
INSPECTOR MILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next krspec*m 24 hours In adnarom (952) 249-4600
OMmerlcontra�Kor on site:
Insoactor: ���•.••
wM a Co Mnaosctors File Canary CopylSBe Nofte
r
r
Building Permit Survey
Prepared for:
g6a Everlclst Enterprises
0
6y '
q65
Brook St N
N89'36'58"W 125.25
1 0
1
96y i � � x g5g.1
I I
Proposed Driveway I
(96 ) ' 1 I �
e_Xe-
I
y62 961 I �
y (961)
(961. 961.51
3
m 9 I9.3 ° 22.
J" w
r23
—
41 10.1
I
ji
1959.3
cc wN
24.5
' � 53.4 ----_-_-_-_-_--
Pro dWlk Proposed
4.7 M0 O^
TOF-=962:3 ?. :.'• isting: age.Driveway 96GFE=961.9-961eck(to be removed) GFE 45 _ _
L E=954.5.. ..
ta°yo
ogo
7.1 ' '�9s96 96� Z''••:•: C�
959 -- --- Concpfe, 4.
(958 E -me). B
Existing Hous 3
Y FFE=960.5
e�(g57 11 be emo 1 r c .4
(to be remove ). 1 0 �" 8 is u
to
3 � W WW
® .. o r 20.45 22 0 26.1 D
MH 956.9 `=. Sfapp- ti u $ W
.& ftep 9P* o ti C O
k x
960�9 - 323` g6p.7 0C
SCALE
rd O I
0 10 20
40 9yy i ..,� +�., �.- ,� ate. 1 I'' ys v
N89 3455"W 125.21 ,(Comp.) 125.25 (plot) 1 1 inch = 20 feet
Site Address:
' xis tin House ( 230 Tonka Ave
Orono, MN 55356
Existing Hardcover Calculations (o. ft.) Proposed Hardcover Calculations (so. ft.) Boundary Description (su_ lied by client)
House 2,131 House 1,887 Lots 14, 15 and 16. Block 2, BAYSIDE ADD177ON TO
Grovel Driveway 664 Driveway 1,539 LAKE MINNETONKA, according to the recorded plot
Pavers 115 Porch 289 thereof, Hennepin County, Minnesota. Subject to any
Concrete 77 Deck _ 00 and a/I easements of record.
Stoop & Step 68 3,815
3,055 Proposed Elevations:
Lot Area 18,793
Lot Area 18,793 Top of Block = 962.3 Total Hardcover 20.3% Garage floor = 961.5
Toto/ Hardcover 16.3% Basement Floor = 954.5
Bearings based on assumed datum.
Job Number: 8301
) SCHOBORG 1 hereby certify that this certificate of survey was
prepared by me or under my direct supervision and Book/Page: LL
that / am a duly Registered Land Surveyor under the
laws of the State Minnesota. Survey Date: 9/27/16
LAND SERVICES
Drawing Name: ever/ast.dwg
l-%
,INC. - _ Drawn by. DMS
Paul B. 96hoborg Revisions.-
763-972-3221
evisions:763-972-3221 8997 Co. Rd. 13 SE
ww.SchoborgLand.com Delano, MN 55328 Date: l� /`�.?�/� Registration No. 14700
w
a
I r�� PM ICA-m ML4d ars rubpelm,+
Building Permit Survey
Prepared for:
i �1'`; Wverlost Enterprises
,60 !� f
i
1 N g6� rf ; Bro ok St Q
N89'38'58"W 125.25
o
0J
i '
Proposed Driyetivay
%✓ j i i � 6 �Mi
(961.3) (961.55% ' a a�
0 22.3� 1 /' •r o
_ C
Q� c6 � O
rr�
g6ti° o �.0 r 13.3 i �� �l lu ZE
--- - -------. l- '''
30.2 --- 10.1 F�--
534 ------------
O ,
Proposed Walk / a n,
/dp std/ /� o,
960 AVL1 f;� w a
�,
�- 9/%;' ' TbF�,5fi�2N — 0/ xistingrGarage. 0 0
Grave/ Driveway, t. u N //� ! w 96 O��
O o N t,!;`/GF�T�61y5/' ^� Deck o� ----- 46.4�`� h ! GFE961.9 4 0
p (to be removed) U ^I �� rfl� LES 4 !/ a� _ r ----------7 10.0
O;
O � X711'' '!,/II%!;it x9 Q6�� O '•. p
+-- 38 --- -- X590 1�.
T (5b 5 E 1, -095).'t%►N�(958.5); 9s Q)
_ E
�- (958 r
co gWI
�
m1 cr ° o
I �Exist�ng Hous
e
!,!r FFE=960.5 ; f FF `�\ •ra'
Y g57) /% I GFE=959.4
ro Iffto be remove W z
20,6
0
267p
MN 956.9 (Stoop- A� �r,',%t / i/I7/;'
f,1
J JI* stop
I. I g6 '
\ 960 SCALE
950` o io 20
I
40 9yhk 1 ' I 9s9 –
N893455"W 125.21-,(golnp.) 125.25 (plot) – — — - 1 inch = 20 feet
Site Address:
xistin House E', 230 Tonka Ave
Orono, MN 55356
�r0S10r\ C'9
Existing Hardcover Calculations (sq. ft.) Pr000sed Hardcover Calculations [sq. ft,) Boundary Description (supplied by client)
House 2,131 House 1,765 Lots 14, 15 and 16, Block 2, BAYSIDE ADDITION TO
Gravel Driveway 664 Driveway 1,539 LAKE MINNETONKA, according to the recorded plat
Pavers 115 Porch 176 thereof, Hennepin County, Minnesota. Subject to any
Concrete 77 Deck 100 and all easements of record.
Stoop & Step 68 Cantilever 16
3,055 3,596 Proposed Elevations:
Lot Area 18,793 Lot Area 18,793 Top of Block = 962.3Garage Floor = 961.5
Total Hardcover 16.39. Total Hardcover 19.19. Basement Floor = 954.5
Bearings based on assumed datum.
Job Number: 8301
) SCHOBORG I hereby certify that this certificate of survey was
prepared by me or under my direct supervision and Book/Page: LL
that I am a duly Registered Land Surveyor under the
laws of the State of Minnesota. Survey Date: 9/27/16
LAND SERVICES
Drawing Name: everlast.dwg
Drawn by. DMS
INC. ------ -- ---
Paul B. Schoborg Revisions: 12/22/16 (prop. house dims.)
763-972-3221 8997 Co. Rd 13 SE
www.SchoborgLcnd.com Delano, MN 55328 Date: L __L t�����G Registration No. 14700