Loading...
HomeMy WebLinkAbout2016-01578 - demo CITY OF ORONO * z 0 1 6 - 0 1 x 7 8 2750 KELLEY PARKWAY DATE ISSUED: 01/20/2017 ORONO,MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS 230 TONKA AVE PIN 05-117-23-14-0029 LEGAL DESC BAYSIDE ADDN TO LAKE MINNETONK LOT 000 BLOCK 002 PERMIT TYPE DEMOLITION PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE DEMO-PRINCIPAL STRUCTURE ACTIVITY 645-SINGLE FAMILY HOUSES(ATT&DET NOTE: (SAC PAID#5108 05/04/1993)&SEWER DISCONNECT ISSUED ON 01/20/17#2017-00057 1. FOUNDATIONS/ALL DEMO DEBRIS TO BE REMOVED FROM GROUND&DISPOSED OF OFF SITE,PER PCA REGULATIONS. 2. WELLS MUST BE ABANDONED. 3. INSPECTIONS DONE BEFORE BACKFILLING. NOTE: A 24-48 HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. CALL(952)249-4600. SEWER MUST BE DISCONTINUED AT THE CITY SERVICE BY QUALIFIED CONTRACTOR BEFORE DEMO PERMIT IS ISSUED. CHECK TO MAKE SURE THIS PERMIT HAS BEEN PULLED BEFORE ISSUING THIS PERMIT. APPLICANT DEMOLITION-PRINCIPAL STRUCTURE 75.00 STATE SURCHARGE DEMO 1.00 EVERLAST ENTERPRISES INC. TOTAL 76.00 4109 NORTH SHORE DR Payment(s) MOUND,MN 55364- CREDIT CARD 0474 (952)472-7287 76.00 Minnesota State License#: BUIL-BC591566 OWNER Everlast Enterprises Inc 4109 NORTH SHORE DR MOUND,MN 55364- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. F7 Appli ant Permitee Signature ate Issued By Signature Date �ON City of Orono FOR MY USE ONLY �^ P.O.Box 66 Date ReceivedPermit#�7 J 7� 2750 Kelley Parkway Crystal Bay,MN 55323 Amount: $� SAC Credit: (952)249-4600 J yHomeowner(s)Signed: ❑Yes Resolutions(if any)Signed:❑Yes ❑None Required �AkES H O 6 Zoning Disclosure Signed: ❑Yes ❑None Required CITY OF ORONO - DEMOLITION PERMIT (All permits must be approved by the Building Official and/or Zoning Department) Job Site/Owner Information: Type: n Residential ❑ Commercial Site Address: 230 TONKA AVE, ORONO, MN 55356 Owner: Everlast Enterprises Inc Mailing Address: 4109 No Shore Drive City: ORONO Zip: 55364 Phone: 612-868-0748 Email: Contractor/Applicant Information: Contractor/App.: James Cleary Contact Person: James Cleary Address: 4109 No Shore Drive State License 1,5 LL City: Orono Zip: 55364 Expiration Date: i I,;L bt T Phone: 612-868-0748 Email: Jim@EveriastEnterprises.com SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT General Instructions: 1. You may be required to obtain other permits, i.e.: well abandonment, sewer, etc. 2. Work must not begin unless the permit card is available on the job site. 3. A 24-48 hour notice is required for all inspections. Call (952)249-4600. 4. Sewer must be discontinued at the City service by qualified contractor before demo permit is issued. Demolition by means of: ❑ Manual Disassembly RJ Heavy Equipment ❑ Other Permit(s) Issued: Sewer Disconnection ❑Well Abandonment# In return for issuance of said Demolition Permit, the undersigned owner hereby agrees to: 1. Submit a survey, aerial photo or sketch showing all structures on the property. Note which structures are to be demolished. 2. Submit a survey, aerial photo or sketch showing proposed erosion control measures in accordance with Chapter 79, Construction Site Runoff Control. 3. Submit a copy of permit approval from the Minnehaha Creek Watershed District (MCWD). The City will not issue a demolition permit without a copy of the permit(s) from the MCWD or documentation stating permit(s) are not required. (� p Form Last Updated. July 2015 t o -Q tel' L RECEIVED ED 150784 DEC 2 8 2016 CITY OF ORONO 4. Submit a$2,500 escrow and an escrow agreement signed by the property owner(copy attached). 5. Keep all structure(s)enclosed and/or secured until such time as demolition is complete. 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior approval is obtained in writing for temporary use thereof. 7. Completely remove foundation(s)from the ground. 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA requirements. 9. Abandon water wells in accordance with State Health Department regulations. 10. Call for an inspection when all debris has been removed, before backfilling. 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground elevation (except when such excavation is to be used as part of a new building and such new building is actually under construction). 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are crushed and filled. 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, employees and assigns from and against all claims, damages, losses or expenses, including attorney fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition described herein as performed by the property owner, his employees, agents, subcontractors or assigns. PERMIT TYPE AND FEE CALCULATION ❑x $75.00 — Principal Structure R $ 75.00 ❑ $50.00 —Accessory Structure x (how many) 1. Subtotal of above permit requested $ 2. State Surcharge 1.00 3. TOTAL PERMIT FEE (add lines 1-2 above) $ 76.00 The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do all the work in a strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. Applicant's Signature: _ Date: ( Lx- 6 Owner's Signature: Date: 25 Approved B pp Y: �I Date: Bui ding Official) *Zoning Disclosure Required? ❑ YES ® NO *This must be filled out by Zoning Department—For either answer, a Zoning Official must sign all applications. *Approved By: Date: (Zoning Official) $(d9 P&mi f # 2010- 01577 Form Last Updated: July 2015 (�f3 O U h VK­J #ILI, 150784 Building Permit Survey I PreP ored for: 96a Everlast Enterprises a 65 ol, 6 Brook St N89 3858"W 125.25 40 O ry l ^ I q5q. 1 I V Proposed Driveway i n 61 961 y 9 (961) h I (961.3) 961.51 J a v m I9.J c 22. O •� t 4ti. -Js I W aa ---- 30.2 ---- I i '- f0.1 =- i G h -^^ QI x l i e� fi o 1 •� O � 59� ig59"} pas. 2. ----- - -- 53.4 ---------- � W 3 Pro o d Walk I Proposed.N ^+ �.� F8C0 / to7-- lis $o N TOF=962:3 n 60 0 tiM211Grove/Driveway a rfg=961.5 0 9 i 4` $ ` a Deck _ - --------- �o (to be removed) o U° LFE=954.5 10.0 ~--- 4 O 5 ! 7 ?e 2 o 959 1 95B. ) 1 g. .,. ConGieSa c , (958 £ 95&B) IE/W)(958.5) — l.e E `- ♦- 958) i — a 1 Existing Hous W 3 FF£=960.5 y Y � 7(g5 j GFE=959.4 ^ e g � (to,be remo MH 956.9 1 -` be a/ qti w �- 4 g \ P 5 q •ti L9x {. gap\o. JJJ g6a.1 ' ` f s 9so SCALE 0 10 io 40 q5b 1 r i N89;34'55'W 0125.21 (Comp.) 125.25 (plot) — 1 inch - 20 feet ss. :C0 5�o.� Address: xistin House I 230 Tonka Ave �j/// Orono, MN 55356 111, 1` 95ti Existing Hardcover Calculations(so, ft.) proposed Hardcover Calculations (so, RJ Boundary Oescrinfion (supplied byclient) Nouse 2,131 House 1,887 Lots 14, 15 and 16, Block 2, BAYSIDE ADDITION TO Grovel Driveway 664 Driveway 1,539 LAKE MINNETONKA, according to the recorded plat Pavers 115 Porch 289 thereof, Hennepin County, Minnesota. Subject to any Concrete 77 Deck 129 and all easements of record. Stoop & Step 68 3,815 3,055 Proposed Elevations: Lot Area 18,793 Top of Block = 962.3 Lot Area 18,793 Garage Floor= 961.5 Total Hardcover 16.3x Total Hardcover 20.3X Bosement Floor= 954.5 Bearings based on assumed datum. Job Number: 8301 SCHOBORG I hereby certify that this certificate of survey was direct prepared by me or under my direct supervision and BookyPage: LL that / am a duly Registered Land Surveyor under the laws of the State Minnesota. Survey Date: 9/27/16 LAND SERVICES Drawing Name: everlost.dwg INC. _ Drown by. DMS Paul B. $choborg Revisions: 763-972-3221 8997 Co. Rd. 13 SE y www.SchaborgLand.com Delano, MN 55328 Dote: r .c -' 4_!�' Registration No. 14700 r 4 i Lid i ♦11' '. , DATE TIME Ci O ORONO CALLED IN INSPECTION NOTI E G!5W SCHEDULED 7 PERMIT NO. COMPLETED ADDRESS a -To t a OWNER TELEPHONE NO. ala- 7VY CONTRACTOR Caf ' DESCRIPTION W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING C ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL v ❑ DEMO-SITE ❑ C INSTALL z OWNBUC ONTRACTOR TO MEET YOU _NO y COMMENTS: 110 Gy t7 Al W ¢ Q W �WORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE W ❑CORRECT WORK a PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT O CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED [ISTOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Can for the next Inspw*m 24 hours In advance. (952) 249-4600 on shm Inspector: +w WMb CMAnWocUw%FIM Conry CoPldSib Notley DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE _ SCHEDULED PERMIT NO. COMPLETED ADDRESS 2,30 7dg*4 give OWNER TELEPHONE NO. CONTRACTOR C--!Alas ses LrtC'• DESCRIPTION i Ma ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL C ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING ❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL ❑ TREE REMOVAL i Z ❑ LATHE ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑COMPLAINT i Q ❑ FINAL ❑WATER HOOK-UP C®fPottovFUP j ❑AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS- ft e c c LL m ��/Bi •e !� G n S /l�fiJ S. /�- ✓ SIL 7�ij'S w 31 W a Uj ❑WORK SATISFACTORY PROCEED C*PRWEQ_TCOMPLETE W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY C ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR MILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next krspec*m 24 hours In adnarom (952) 249-4600 OMmerlcontra�Kor on site: Insoactor: ���•.•• wM a Co Mnaosctors File Canary CopylSBe Nofte r r Building Permit Survey Prepared for: g6a Everlclst Enterprises 0 6y ' q65 Brook St N N89'36'58"W 125.25 1 0 1 96y i � � x g5g.1 I I Proposed Driveway I (96 ) ' 1 I � e_Xe- I y62 961 I � y (961) (961. 961.51 3 m 9 I9.3 ° 22. J" w r23 — 41 10.1 I ji 1959.3 cc wN 24.5 ' � 53.4 ----_-_-_-_-_-- Pro dWlk Proposed 4.7 M0 O^ TOF-=962:3 ?. :.'• isting: age.Driveway 96GFE=961.9-961eck(to be removed) GFE 45 _ _ L E=954.5.. .. ta°yo ogo 7.1 ' '�9s96 96� Z''••:•: C� 959 -- --- Concpfe, 4. (958 E -me). B Existing Hous 3 Y FFE=960.5 e�(g57 11 be emo 1 r c .4 (to be remove ). 1 0 �" 8 is u to 3 � W WW ® .. o r 20.45 22 0 26.1 D MH 956.9 `=. Sfapp- ti u $ W .& ftep 9P* o ti C O k x 960�9 - 323` g6p.7 0C SCALE rd O I 0 10 20 40 9yy i ..,� +�., �.- ,� ate. 1 I'' ys v N89 3455"W 125.21 ,(Comp.) 125.25 (plot) 1 1 inch = 20 feet Site Address: ' xis tin House ( 230 Tonka Ave Orono, MN 55356 Existing Hardcover Calculations (o. ft.) Proposed Hardcover Calculations (so. ft.) Boundary Description (su_ lied by client) House 2,131 House 1,887 Lots 14, 15 and 16. Block 2, BAYSIDE ADD177ON TO Grovel Driveway 664 Driveway 1,539 LAKE MINNETONKA, according to the recorded plot Pavers 115 Porch 289 thereof, Hennepin County, Minnesota. Subject to any Concrete 77 Deck _ 00 and a/I easements of record. Stoop & Step 68 3,815 3,055 Proposed Elevations: Lot Area 18,793 Lot Area 18,793 Top of Block = 962.3 Total Hardcover 20.3% Garage floor = 961.5 Toto/ Hardcover 16.3% Basement Floor = 954.5 Bearings based on assumed datum. Job Number: 8301 ) SCHOBORG 1 hereby certify that this certificate of survey was prepared by me or under my direct supervision and Book/Page: LL that / am a duly Registered Land Surveyor under the laws of the State Minnesota. Survey Date: 9/27/16 LAND SERVICES Drawing Name: ever/ast.dwg l-% ,INC. - _ Drawn by. DMS Paul B. 96hoborg Revisions.- 763-972-3221 evisions:763-972-3221 8997 Co. Rd. 13 SE ww.SchoborgLand.com Delano, MN 55328 Date: l� /`�.?�/� Registration No. 14700 w a I r�� PM ICA-m ML4d ars rubpelm,+ Building Permit Survey Prepared for: i �1'`; Wverlost Enterprises ,60 !� f i 1 N g6� rf ; Bro ok St Q N89'38'58"W 125.25 o 0J i ' Proposed Driyetivay %✓ j i i � 6 �Mi (961.3) (961.55% ' a a� 0 22.3� 1 /' •r o _ C Q� c6 � O rr� g6ti° o �.0 r 13.3 i �� �l lu ZE --- - -------. l- ''' 30.2 --- 10.1 F�-- 534 ------------ O , Proposed Walk / a n, /dp std/ /� o, 960 AVL1 f;� w a �, �- 9/%;' ' TbF�,5fi�2N — 0/ xistingrGarage. 0 0 Grave/ Driveway, t. u N //� ! w 96 O�� O o N t,!;`/GF�T�61y5/' ^� Deck o� ----- 46.4�`� h ! GFE961.9 4 0 p (to be removed) U ^I �� rfl� LES 4 !/ a� _ r ----------7 10.0 O; O � X711'' '!,/II%!;it x9 Q6�� O '•. p +-- 38 --- -- X590 1�. T (5b 5 E 1, -095).'t%►N�(958.5); 9s Q) _ E �- (958 r co gWI � m1 cr ° o I �Exist�ng Hous e !,!r FFE=960.5 ; f FF `�\ •ra' Y g57) /% I GFE=959.4 ro Iffto be remove W z 20,6 0 267p MN 956.9 (Stoop- A� �r,',%t / i/I7/;' f,1 J JI* stop I. I g6 ' \ 960 SCALE 950` o io 20 I 40 9yhk 1 ' I 9s9 – N893455"W 125.21-,(golnp.) 125.25 (plot) – — — - 1 inch = 20 feet Site Address: xistin House E', 230 Tonka Ave Orono, MN 55356 �r0S10r\ C'9 Existing Hardcover Calculations (sq. ft.) Pr000sed Hardcover Calculations [sq. ft,) Boundary Description (supplied by client) House 2,131 House 1,765 Lots 14, 15 and 16, Block 2, BAYSIDE ADDITION TO Gravel Driveway 664 Driveway 1,539 LAKE MINNETONKA, according to the recorded plat Pavers 115 Porch 176 thereof, Hennepin County, Minnesota. Subject to any Concrete 77 Deck 100 and all easements of record. Stoop & Step 68 Cantilever 16 3,055 3,596 Proposed Elevations: Lot Area 18,793 Lot Area 18,793 Top of Block = 962.3Garage Floor = 961.5 Total Hardcover 16.39. Total Hardcover 19.19. Basement Floor = 954.5 Bearings based on assumed datum. Job Number: 8301 ) SCHOBORG I hereby certify that this certificate of survey was prepared by me or under my direct supervision and Book/Page: LL that I am a duly Registered Land Surveyor under the laws of the State of Minnesota. Survey Date: 9/27/16 LAND SERVICES Drawing Name: everlast.dwg Drawn by. DMS INC. ------ -- --- Paul B. Schoborg Revisions: 12/22/16 (prop. house dims.) 763-972-3221 8997 Co. Rd 13 SE www.SchoborgLcnd.com Delano, MN 55328 Date: L __L t�����G Registration No. 14700