Loading...
HomeMy WebLinkAbout2014-01293 - shed CITY OF ORONO * 2 0 1 4 - 0 1 2 9 3 2750 KELLEY PARKWAY DATE ISSUED: 12/03/2014 ORONO, MN 55356- 952) 249-4600 FAX: (952) 249-4616 ADDRESS 3710 TOGO RD PIN 17-117-23-31-0027 LEGAL DESC TOWNSITE OF LANGDON PARK LOT 003 BLOCK 010 PERMIT TYPE ACCESSORY STRUCTURE PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE : SHED> 120 SQ FT ACTIVITY : 3 2 S r"_1 0 n —ks,-.s _ VALUATION : $ 25,000.00 NOTE: SEPARATE PERMITS REQUIRED:ELECTRICAL(STATE) DETACTED GARAGE NOTE: PRIOR TO RELEASE OF ESCROW MONEY,AN AS-BUILT SURVEY AND HARDCOVER CALCULATIONS MUST BE SUBMITTED AND APPROVED. INITIAL: — NOTE: ACCORDING TO CITYCODESECTION �8- 440(ATTACHED)THE DETACHED STRUCTURE WILL BE CONSISTANT IN DESIGN &COLOR OF THE PRINCIPAL TIAL: STRUCTURE. INITIAL: APPLICANT PERMIT FEE SCHEDULE 413.00 GREG DAHL CONSTRUCTION INC. STATE SURCHARGE(VALUATION) 12.50 TOTAL 425.50 112 PAUL AVE N Payment(s) COLOGNE, MN 55422- CHECK 6139 425.50 (952)474-7102 Minnesota State License#: BUIL-20080782 OWNER LINDQUIST,LINDA 3710 TOGO RD WAYZATA,MN 55391- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Ap i ant P ite ignatur at ssu y Signature Date CITY OF ORONO BUILDING PERMIT APPLICATION FOR NEW STRUCTURES OR ADDITIONS �0 Mailing Address: Permit number: O PO Box 66 Crystal Bay, MN 55323-0066 Date received: Street Address:' Received by: y� 2750 Kelley Parkway I I Plan review fee: L `gOrono, MN 55356 ]0SHO�� -;96) Total Fee: Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (Please print) GENERAL INFORMATION: Job Site Address: _3111 0 1_0 'R_ 01 n%)O Y qI i Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes LYNo If yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: �,� J—At� (Ding()CI.0 k) State License# C a?Zg�ZS Expiration Date: X3 t 1h Phone: cell - office —� Mailing Address: '� Ci ZIP: Contact Person: _ Applicant is: <-_��on acto / Homeowner (clrcle one) Email and/or Fax: DA144 M� cl PROPERTY OWNER INFORMATION: Name: L_&e Li U124 P0i'�-_C50A1 Phone(day): 4/502 - L41Z - ZZL_ - t4/-/DA __3110 j Address: "1( p(,0RD f C*0,Q0 City: ZIP: 573V Email and/or Fax ARCHITECT/ENGINEER I FORMATION: Name: HOP rk041T_eC1- z e6- Phone(day): q,5.1 Z50-,4V45- '! Address: 5-#21 � 514 y1f d Ai/1_ City: 1404_ f�P: 5_S` (OL Email and/or Fax: PROJECT INFORMATION: Descri tion of project: 1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal& Water Supply ❑New Construction ❑ Single Family with ❑ Residence ❑Addition attached garage ®'Garage/Accessory Bldg. ❑ Public Sewer WAccessory Building 2r Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer ❑Other: (specify) ❑ Multiple Family/Condo ❑Warehouse ❑ Public ❑Storage ❑ Public Water *"Any earth movement may also require ❑ Commercial ❑ Other(specify) MCWD review&permits. ❑ Industrial ❑ Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (specify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.m innehahacreek.or Estimated Construction Valuation (excluding land) $ Z-:54- QiX - -v STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a. Length(ft.)= cam! Number of bedrooms= Wood/Frame b.Width(ft.)= Z Number of garage stalls: ❑ Masonry Areas in square feet Attached = ❑ Metal ❑ Pole Bldg. c. Basement= Detached= ❑ ICF d. 15t Story = ❑On-site Prefab e.2nd Story= ❑Off-site Prefab f. '/2 Story = ❑Other(please specify): g. Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ Permit Application !� ❑ Proposed Building Plans ❑ MN State Energy Code Calculations and Mechanical Code Requirements Form ❑ ❑ Survey(meeting all requirements) ❑ R Stormwater Pollution Prevention Plan ❑ ❑ Hardcover Calculation(s) ❑ A Septic System Site Evaluation Report ❑ IR Access Permit ❑ ❑ Wetland Buffer Improvement Plan ❑ Engineered Plans for Retaining Walls 4 feet or above ❑ ❑ Minnehaha Creek Watershed District Permit(s) ❑ ❑ Plan Review Fee ❑ ❑ Application Escrow&Agreement ❑ ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. Applicant's Signature: Date: Owner's Signature: �� Date: /00/l //� PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS Address/Permit Number: f V Description of work: o bekud Septic review by: Date Approved: Zoning review by: Date Approved: 12,- Z' I4' Building review by: Date Approved: 11- 14 - ?—OI Grading review by: Date Approved: IL-2-441 Zoning District: Zoning File#: Reso#: Reso Date: Zoning: Lot Area: SF/AC Width: Lot Coverage: 1q%SM SF lbd ob Survey Submitted: �es 0 No Date of Survey: '(3 Revised date(?): '11.& Proposed Setbacks: gas I Front) Rear( eet) ( S ® W ) ( N S E ©) Other Buildings Wetland Side l0 Side gZ' 10, CoLl 15' �huu to td dlA!`K- 12, ids Defined eight: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) Perimeter(linear feet)= 50%= #of Stories Ok? DYES FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: The distance between the lowest N; START WITH proposed floor(of the basement or crawl 'f ' space)and the highest point of the n 1 .�I y� between the top of slab and If you have a... point of the roof. • GABLE OR HIPPED ROOF(no 00� OR HIPPED ROOF(no windows): Subtract half the ): Subtract half the distance distance between the highest poi the highest point of the roof of the roof to the low point of the point of the corresponding SUBTRACTION corresponding gable or hipped roc ` ipped roof (BASED ON ROOF . GABLE OR HIPPED ROOF(with Z HIPPED ROOF(with TYPE) windows): Subtract half the Subtract half the distance distance between the top of the /[v i top of the highest highest window and the highest V the highest point of the point of the roof • ALL OTHER ROOF TYPES(flat, I/ ROOF TYPES(flat, mansard,etc):No subtraction. r�"/� :No subtraction. Subtract the distance between the g grade atween the d acent to of slab SUBTRACTION basement/crawl space floor and the (BASED ON EXISTING highest existing grade adjacent to the GRADES) foundation OR 10 feet(whichever is less). 1ht EQUALS Defined building height Shoreland District MCWD Permit Received „vera a Lakeshore Setback Met? Bluff D Yes D No XN/A0 Yes No Yes D No D Yes D No N/A Permit Number: Setback: Stormwater Quality Existing Proposed Variance Required CUP Required Overlay District Tier Hardcover Hardcover 15-IMID 23.57-070 D Yes No D Yes No 3 Z10(L S f J?$�p Type(s): Type(s): Updated: January 2013 vlornns\plan review checklist 2013.docx REMARKS (in-house): Fees to be Charged YES NO Permit Plan Review State Surcharge Investigation Fee SAC 'Numberof tAC'Ulnits , Other(specify) Square Footage $per Square Footage Basement X = 18r Floor X = $ 2nd Floor X = $ Garage X = $ Estimated Construction Value: $ Orono Inspections Required Work Requiring Separate Permits Required State Permits 0 Site 0 Plumbing 0 Grading/Filling 0 Well 0 Hardcover Removal 0 Mechanical 0 Fire Electrical .;'Footing 0 Septic 0 Water Connection 0 Poured Wall 0 Fireplace 0 Sewer Connection 0 Foundation Survey 0 Masonry 0 Lawn Irrigation 0 Radon Rock Bed 0 Mfg. Framing 0 Other(specify) 0 Insulation s-Built Survey Final 0 Wetland Buffer 0 Other(specify) REMARKS (in-house): 16 h � Y & Other Review: Reviewed by: Date Approved: Access: Existing: 0 YES 0 NO New: 0 YES 0 NO OFFICIAL REMARKS-TO BE NO ED ON PERMIT AND INITIALLED CW-Tf► �r 40 a - y- s r vu NG G ov` ►'� wid bt _&W-ow tk) i- (0(ar Of " Updated: January 2013 vAforms\plan review checklist 2013.docx Orono, MN Code of Ordinances Page 1 of 1 ORONO COPY Sec. 78-1440. - Exterior materials. Except for accessory buildings that are less than 120 square feet in area or are located on lots two acres in area or larger, an accessory building and the principal building shall be consistent in design and color. Detached garages located within the rear yard on lots that have frontage on a lake shall have windows or other ornamental features on the wall facing a street or private road. (Ord. No. 52 3rd series,§3, 11-24-2008) about:blank 12/2/2014 RESIDENTIAL ACCESSORY BUILDINGS y ` www.ci.orono.nnn.us 952-249-4620 KESH0 PERMIT A permit is required for all accessory structures. An application packet may be obtained on the City's website (www.ci.orono.mn.us)or at the City offices. DESIGN IV" 14dop Accessory structures 120 square feet or larger located on lots of less than 2 acres must be consistent in design and color with the principal structure (house). Garages located within the rear yard on lots that have frontage on a lake must have windows or other ornamental, architectural features on the wall facing the street or private road. SIZE Maximum Individual Accessory Maximum Allowed Total Footprint Lot Area Building Footprint of All Accessory Buildings on a Property* 0.00--1.99 acres 1,000 square feet 2,000 square feet 2.00--3.00 acres 1,200 square feet 2,400 square feet 3.01--3.50 acres 1,400 square feet 2,800 square feet 3.514.00 acres 1,600 square feet 3,200 square feet 4.01-4.50 acres 1,800 square feet 3,600 square feet 4.51--5.00 acres 2,000 square feet 4,000 square feet 5.01--6.00 acres 2,200 square feet 4,400 square feet 6.01--7.00 acres 2,400 square feet 4,800 s uare feet 7.01--8.00 acres 2,600 square feet 5,200 square feet 8.01--9.00 acres 2,800 square feet 5,600 square feet 9.01 or more 3,000 square feet 1 6,000 square feet *Only one accessory building may exceed 1,000 square feet. NUMBER Absent any other zoning requirements there is no limit on the number of accessory buildings per property. STRUCTURAL COVERAGE/MASSING Properties less than 2 acres in size are subject to a 15 percent structural coverage limitation. (See the Structural Coverage information sheet.) HARDCOVER Properties located in Tier 1 though Tier 5 within the Stormwater Quality Overlay District are subject to hardcover regulations. These are typically properties within 1,000 feet of lakes or 300 feet of certain creeks. (See the Hardcover information sheet.) Reference: City Code Sections 78-1279, 78-1288, 78-1404. 78- This is an information sheet.Every effort has been made to 1405, 78-1435 through 1438 insure the accuracy of the information contained herein; however,if any information is not consistent with provisions of January 2013 the City Code, the Code provisions will prevail. Page 1 of 4 WELLS&SEPTIC SYSTEMS An accessory building must be at least 3 feet (including overhangs) from a well; 20 feet from the drainfield and 10 feet from other parts of the septic system. LOCATION An accessory building must be at least 10 feet from the house (including a deck or overhang) and 10 feet from any other structure. It may not be placed in a drainage, utility or similar easement. Non-lakeshore lots: An accessory building may not be placed closer to the street than the house. On a corner lot this requirement applies to the narrower street frontage regardless of which frontage the front of the house faces or the address of the house; principal building setbacks may be required. Special setbacks and approval apply to a "through lot" (a lot with a street to both the front and back.) Contact the Planning and Zoning Department for more information. Setbacks for an accessory building of less than 750 square feet Zoning District Interior Side Street Side* Garage- Other- Rear Rear R-1A 10' 35' 10' 5' R-1 B 10' 15'** 10' 5' LR-1A 10' 50' 10' 5' LR-1 B 10' 35' 10' 5' LR-1 C or LR-1 C-1 10' 15'** 10' 5' RR-1A 10' 100' 1 10' 1 5' RR-113 10' 50' 10' 5' Setbacks for an accessory building of 750 to 1,000 square feet Zoning District Interior Side Street Side* Rear R-1 A 15' 35' 15' R-1 B 15' 15'** 15' LR-1A 15' 50' 15' LR-1 B 15' 35' 15' LR-1 C or LR-1 C-1 15' 15'** 15' RR-1 A 15' 100' 15' RRA B 15' 50' 15' Setbacks for an accessory b ilding of more than 1,000 sq are feet Zoning District Interior Side Street Side* Rear R-1 A 30' 35' 15' R-1 B 30' 30' 15' LR-1A 30' 50' 50' LR-1B 30' 35' 30 LR-1 C or LR-1 C-1 30' 30' 30' RR-1A 50' 100' 100' RR-1 B 30' 50' 50' *This setback applies to unimproved street right-of-ways as well as to improved streets.*"Must be 30 feet if a detached garage with overhead door facing the street side. Reference: City Code Sections 78-1279, 78-1288, 78-1404. 78- This is an information sheet.Every effort has been made to 1405, 78-1435 through 1438 insure the accuracy of the information contained herein; however,if any information is not consistent with provisions of January 2013 the City Code, the Code provisions will prevail. Page 2 of 4 Christine Mattson From: Robert Bean [bobbe@bolton-menk.com] Sent: Tuesday, December 02, 2014 1:32 PM To: Christine Mattson Cc: Andrew Mack; Adam Edwards; David P. Martini; Brian Simmons; Melanie Curtis Subject: 2014-01293 -3710 Togo Road Christine, I have completed my review of the revised Certificate of Survey. The Survey was adequately revised to address my previous comments. If you have any questions or comments, please contact me to discuss. Thanks, Robert E. Bean,Jr, P.E. LEED Green Assoc. Water Resources Engineer Bolton & Menk, Inc. Consulting Engineers&Surveyors 2638 Shadow Lane, Suite 200 Chaska, MN 55318 P:(952)448-8838, ext 2892 F:(952)448-8805 email: bobbe@bolton-menk.com www.bolton-menk.com This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com I Christine Mattson From: Amanda Bednar[abednar@minnehahacreek.org] Sent: Friday, November 21, 2014 9:57 AM To: GREG DAHL Cc: Melanie Curtis; Christine Mattson Subject: RE: Permit inquiry Greg, Based on the information provided below,this project is under our requirements for an Erosion Control permit. Our Wetland Protection is not triggered as this is not a new principal structure and the wetland and buffers will not be impacted by this project per my phone conversation with Greg. No permit is required at this time from Minnehaha Creek at this time. Christine and Melanie, please let me know of any questions or concerns. Thank you, Amanda Bednar District Representative 15320 Minnetonka Blvd. Minnetonka, MN 55345 952-641-4581 Alm Y� MINNENANA CREEK WAIMMED DISTRICT From: GREG DAHL [mailto:dahlmsp@msn.com] Sent: Friday, November 21, 2014 8:26 AM To: Permitting Subject: Permit inquiry To whom it may concern, I've entered into an agreement with Linda & Clay Peterson at 3710 Togo Rd, Orono to build a 24x28 Garage on a floating slab on there property. The effected area is less than 1500 sq ft and roughly 35 cubic yards of disturbed material. From what I can tell by your rules this exempts it from your permitting needs. A wetland delineation was also done by request from the city in 2013 and is on file with the permit at the city. The permit# is 2014-01293. If you need any other info please feel free to call me. Thanks i Christine Mattson From: Christine Mattson Sent: Friday, November 21, 2014 11:14 AM To: 'GREG DAHL' Subject: RE: 3710 Togo Road /#2014-01293 Attachments: Escrow Agreement- Building Permit w Erosion Control 2014-01293.pdf Greg Please refer to Page 5 of Orono's building permit application packet, Item K outlines the requirement for the $2500 escrow... Additionally Item J on the same page describes the requirement to contact the MCWD. Please have the property owner sign the attached escrow agreement and provide a check for $2500 upon issuance of the permit. Please contact me if you have further questions. From: GREG DAHL [mailto:dahlmsp@msn.com] Sent: Thursday, November 20, 2014 6:55 PM To: Christine Mattson Subject: RE: 3710 Togo Road / #2014-01293 Christine, Can you explain to me why 15 days into this you are telling me this. If every project requiring grading needs a escrow agreement why wasn't I told this when I dropped it off and this could have been taken care of a long time ago. I could also have been told that it wouldn't proceed without the MCWD statement stating it was or wasn't required. Thanks GREG DAHL DAHL CONSTRUCTION. INC 300 West Point Rd. Tonka Bay, Mn 55331 Cell 612-270-1406 From: CMattson@ci.orono.mn.us To: dahlmsp@msn.com CC: marks@gronbergassoc.com; MCurtis@ci.orono.mn.us; LOman@ci.orono.mn.us Subject: 3710 Togo Road /#2014-01293 Date: Thu, 20 Nov 2014 19:41:13 +0000 Attached is a copy of the letter and attachments being mailed today. Please don't hesitate to contact me with any questions you may have. Christine Mattson Planning Assistant i City of Orono 2750 Kelley Parkway Orono MN 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing address) S 952.249.4620 g 952.249.4616 M cmattson@ci.orono.mn.us -'�) www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Thursday& Friday, November 27& 28, 2014 --Forwarded Message Attachment-- From: bobbe@bolton-menk.com To: CMattson@ci.orono.mn.us CC: amack@ci.orono.mn.us; MCurtis@ci.orono.mn.us; aedwards@ci.orono.mn.us; davidma@bolton- menk.com; briansi@bolton-menk.com Subject: 2014-01293 - 3710 Togo Road Date: Thu, 20 Nov 2014 14:46:44+0000 Christine, I have completed review of the Building Permit application package for 3710 Togo Road. Following are my comments for City consideration: 1. The silt fence should be installed and inspected by the City prior to any land disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. 2. The grading along the east property line should be revised to better define a swale directing runoff to the north. Additional spots and drainage arrows may be necessary to ensure runoff is not directed onto the adjacent property. 3. A financial security of$2,500 from the Applicant is recommended for erosion control and engineering oversight. The financial security is intended to provide protection in the event that it becomes necessary for the City to install or maintain erosion and sediment control within the project area and covers the cost of vegetation re-establishment if the applicant is unable to follow through with the conditions of approval. 4. The applicant may be required to obtain Minnehaha Creek Watershed District (MCWD) approval and permitting for their Erosion Control rule. A copy of any approved permit or confirmation that no permit is required should be submitted prior to any land altering activities. If you have any questions or comments, please contact me to discuss. Thanks, Robert E. Bean, Jr, P.E. LEED Green Assoc. Water Resources Engineer Bolton & Menk, Inc. 2 Consulting Engineers&Surveyors 2638 Shadow Lane, Suite 200 Chaska, MN 55318 P:(952) 448-8838, ext 2892 F:(952) 448-8805 email: bobbe@bolton-menk.com www.bolton-menk.com This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com 3 Christine Mattson From: Christine Mattson Sent: Thursday, November 20, 2014 1:41 PM To: 'dahlmsp@msn.com' Cc: 'Mark'; Melanie Curtis; Lyle Oman Subject: 3710 Togo Road/#2014-01293 Attachments: letter.pdf; Survey Requirements- March 2014.pdf; Escrow Agreement- Building Permit w Erosion Control 2014-01293.pdf; 2014-01293 -3710 Togo Road Attached is a copy of the letter and attachments being mailed today. Please don't hesitate to contact me with any questions you may have. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing address) 9 952.249.4620 4 952.249.4616 ® cmattson@ci.orono.mn.us -'�n www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Thursday& Friday, November 27& 28, 2014 1 CITY OF ORONO Street Address: Mailing Address: Telephone(952)249-4600 y G~ 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 F` l�ESHO�F, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us d November 20,2014 Greg Dahl Greg Dahl Construction, Inc. 300 West Point Road Tonka Bay, MN 55331 Re: Building Permit Application#2014-01293 3710 Togo Road On November 5, 2014 the City received a building permit application for a detached accessory structure. Your application is incomplete. The following items must be submitted or revised in order for your application to be considered complete and for the plan review to continue: 1. Certificate of Survey. The survey was reviewed by our engineer, his comments are enclosed. Please provide two copies of an updated certificate of survey which meets all of the City's survey standards (enclosed), specifically addressing the engineers comments. 2. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow amount for this project is$2,500. The escrow agreement is enclosed. The property owner must sign the escrow agreement and submit a check for$2,500. Your project may trigger the Minnehaha Creek Watershed District's(MCWD) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements. Sincerely, CITY OF ORONO ( 40K, meov, Christine Mattson Planning Assistant C Greg Dahl via email Clay&Linda Peterson;3710 Togo Road;Wayzata,MN 55391 Lyle Oman, Building Official enclosures Christine Mattson From: Robert Bean [bobbe@bolton-menk.com] Sent: Thursday, November 20, 2014 8:47 AM To: Christine Mattson Cc: Andrew Mack; Melanie Curtis; Adam Edwards; David P. Martini; Brian Simmons Subject: 2014-01293 -3710 Togo Road Christine, I have completed review of the Building Permit application package for 3710 Togo Road. Following are my comments for City consideration: 1. The silt fence should be installed and inspected by the City prior to any land disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. 2. The grading along the east property line should be revised to better define a swale directing runoff to the north. Additional spots and drainage arrows may be necessary to ensure runoff is not directed onto the adjacent property. 3. A financial security of$2,500 from the Applicant is recommended for erosion control and engineering oversight. The financial security is intended to provide protection in the event that it becomes necessary for the City to install or maintain erosion and sediment control within the project area and covers the cost of vegetation re- establishment if the applicant is unable to follow through with the conditions of approval. 4. The applicant may be required to obtain Minnehaha Creek Watershed District (MCWD) approval and permitting for their Erosion Control rule. A copy of any approved permit or confirmation that no permit is required should be submitted prior to any land altering activities. If you have any questions or comments, please contact me to discuss. Thanks, Robert E. Bean,Jr, P.E. LEED Green Assoc. Water Resources Engineer Bolton & Menk, Inc. Consulting Engineers&Surveyors 2638 Shadow Lane, Suite 200 Chaska, MN 55318 P:(952)448-8838, ext 2892 F:(952)448-8805 email: bobbe@bolton-menk.com www.bolton-menk.com This email has been scanned by the Symantec Email Security.cloud service. For more information please visit htti)://www.symanteccloud.com I MEMORANDUM Date: November 14, 2014 To: Bob Bean, City Engineer From: Christine Mattson, Planning Assistant C Melanie Curtis, Planning & Zoning Coordinator Dave Martini, City Engineer RE: Building Permit Number 2014-01293 3710 Togo Road Attached are building plans and survey for a deck and detached garage. Please review the attached information and provide comments by Thursday, November 20, 2014. Please contact me at cmattson@ci.orono.mn.us or at 952-249-4620 or Melanie Curtis at mcurtis@ci.orono.mmus or at 952-249-4627 if you need additional information or if you have any questions. Thank you City of Orono ►gal CQ� oNo, Hardcover Calculation Worksheet Property Address: 3710 7-47co "eaxd r'4/A''WA '00'E'7�,r PA-1) ,E,,„, Prepared by. Gpa,y49FAG t A"rjPC r4rTr' ,IA.fC. Date: Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier Tier 4 Tier 5 Step 2. POS HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey(survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key to Hardcover Item (Describe) Length x Width Total Survey (Square Feet (Example) (Garage) (24'x 30' 720 S.F.) A /NC,uf'E g 62 S.F. B r/ 612 S.F. C 0.frK -6 S.F. D •• J'rao 0 S.F. E U- -96 S.F. F 6411M C k 53 S.F. G ” t;,<,w t1f-4 ZZa S.F. H {' X E iA1 1-/0 S.F. I RA - 6 '72 S.F. S.F. K S.F. L S.F. M S.F. N S.F. p S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. W S.F. - X S.F. Y S.F. Z S.F. 1 Total Proposed Hardcover 3220 S.F. Excludable Hardcover See City Code Sec 78-1684 /1 FrL e. S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover Zo S.F. 3 Net Proposed Hardcover Subtract line 2 from line 1 _ 76,&o S.F. 4 Total Lot Area a r iv So S.F. RE EIV'ED Proposed Hardcover Percentage [(3)T(4)] Z3, ,S2 % NOV 04 2014 I January 8,2013 CITY OF ORONO ✓w `� City of Orono oNo� Hardcover Calculation Worksheet Property Address: 3710 Tv GO �t bad (z-i v04 oem fo ,) s� Prepared by: (7AV'Ao1eV C otA1'1'OC/AYES Imo'. Date: lD-2 8-�y Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 QiDTier 4 Tier 5 Step 1. RDCOVER In the following table identify all items of existing hardcover on the property,keyed by letter to Certificate of Survey(survey must accompany this farm). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key to Hardcover Item (Describe) Length x Width Total Survey (Square Feet (Example) Dara a 24`X30 . A 9 62 S.F. B R,2 S.F. S.F. D 35 S.F. E Z-1elu z 13C S.F. F 53 S.F. G 11o6 S.F. H 5f 0 S.F. S.F. S.F. K S.F. L S.F. M S.F. N S.F. p S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. W S.F. X _ S.F. Y S.F. Z I S.F. 1 Total Existing Hardcover 2' S.F. Excludable Hardcover_ See Cit Code Sec i78=104 . . S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3 Net Existing Hardcover Subtract line 2 from line 1 let S.F. 4 Total Lot Area Nvr wec .G' O j A. O u. SG S.F. Existing Hardcover Percentage [(3)_(4) ] /.S. 83 Wd Hardcover next page) NOV OA 2014 January 8,2013 CITY OF ORONO City of Orono oNo Hardcover Calculation Worksheet Property Address: it G.�© 37,10 TO Go L/ti,?A E,H,N Prepared by: CAVA,4 ERG f A rJ'oC,rrf W, /*yC. Date: /0-28"-/y Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier Tier 4 Tier 5 Step 2. OS HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey(survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key to Hardcover Item (Describe) Length x Width Total Survey (Square (Example) (Garage). 24'x 30' A X/ 7r/4/G --y'044,C 91 CZ S.F. B elf 8 Z S.F. C ,i S.F. D J'TO 0 P S.F. E 4t,; S.F. F 5 S.F. G " C'A411 p S.F. H XerMIA,11.167 'fo S.F. I AA C IE 672 S.F. J i. 5 S.F. K S.F. L S.F. M S.F. N S.F. O S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Proposed Hardcover I 322oS.F. Excludable Hardcover See Cit Code Sec 78-1684):, r S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3 Net Proposed Hardcover Subtract line 2 from line 1 S.F. 4 Total Lot Area ®r iv ' 41 CAaO S.F. RE EMD Proposed Hardcover Percentage [(3)+(4)] 2,g g2 % NOV 04 2014 January 8,2013 CITY OF ORM Minnesota Wetland Conservation Act Notice of Decision Local Government Unit(LGU) Address Minnehaha Creek Watershed District 15320 Minnetonka Blvd Minnetonka,MN 55391 1.PROJECT INFORMATION Applicant Name Project Name Date of Application Linda Peterson 3710 Togo Road Application Number 5/23/2013 W13-14 ®Attach site locator map. Type of Decision: ®Wetland Boundary or Type ❑No-Loss ❑Exemption ❑ Sequencing ❑Replacement Plan ❑Banking Plan Technical Evaluation Panel Findings and Recommendation if any): ❑Approve ❑Approve with conditions ❑Deny Summary(or attach): 2.LOCAL GOVERNMENT UNIT DECISION Date of Decision: 7/16/2013 ®Approved ❑Approved with conditions(include below) ❑Denied LGU Findings and Conclusions(attach additional sheets as necessary): A wetland delineation was conducted at 3710 Togo Road in the City of Orono by Arrowhead Environmental Consulting(AES)on May 2,2013.The boundary&type of the delineated wetland boundary was reviewed in the field on July 15,2013 by Wenck Associates staff on behalf of the Minnehaha Creek Watershed District(MCWD). One wetland was identified on the property. The wetland was identified as a Type 3 shallow marsh. Wenck staff confirmed that the wetland boundary was delineated accurately and the wetland was a Type 3 shallow marsh. MCWD approves the wetland boundary&type as delineated in the field and documented delineation report dated May 22,2013. This decision is valid for five years. A project on this property may require a permit from the MCWD. BWSR Forms 7-1-10 Page 1 of 3 For Replacement Plans using credits from the State Wetland Bank: Bank Account# Bank Service Area County Credits Approved for Withdrawal(sq.ft.or nearest.01 acre) Replacement Plan Approval Conditions. In addition to any conditions specified by the LGU, the approval of a Wetland Replacement Plan is conditional upon the following: ❑ Financial Assurance: For project-specific replacement that is not in-advance, a financial assurance specified by the LGU must be submitted to the LGU in accordance with MN Rule 8420.0522, Subp. 9(List amount and type in LGU Findings). ❑ Deed Recording: For project-specific replacement, evidence must be provided to the LGU that the BWSR "Declaration of Restrictions and Covenants" and "Consent to Replacement Wetland" forms have been filed with the county recorder's office in which the replacement wetland is located. ❑ Credit Withdrawal: For replacement consisting of wetland bank credits, confirmation that BWSR has withdrawn the credits from the state wetland bank as specified in the approved replacement plan. Wetlands may not be impacted until all applicable conditions have been met! LGU Authorized Signature: Signing and mailing of this completed form to the appropriate recipients in accordance with 8420.0255, Subp. 5 provides notice that a decision was made by the LGU under the Wetland Conservation Act as specified above. If additional details on the decision exist,they have been provided to the landowner and are available from the LGU upon request. Name Title Steve Christopher Regulatory Program Manager Signature Date Phone Number and E-mail 7/16/2013 (952)641-4506 schristopher@minnehahacreek.org THIS DECISION ONLY APPLIES TO THE MINNESOTA WETLAND CONSERVATION ACT. Additional approvals or permits from local, state, and federal agencies may be required. Check with all appropriate authorities before commencing work in or near wetlands. Applicants proceed at their own risk if work authorized by this decision is started before the time period for appeal(30 days)has expired. If this decision is reversed or revised under appeal,the applicant may be responsible for restoring or replacing all wetland impacts. This decision is valid for three years from the date of decision unless a longer period is advised by the TEP and specified in this notice of decision. 3.APPEAL OF THIS DECISION Pursuant to MN Rule 8420.0905, any appeal of this decision can only be commenced by mailing a petition for appeal, including applicable fee,within thirty(30)calendar days of the date of the mailing of this Notice to the following as indicated: Check one: ® Appeal of an LGU staff decision. Send ❑Appeal of LGU governing body decision. Send petition and$0 fee if applicable)to: petition and$500 filing fee to: BWSR Forms 7-1-10 Page 2 of 3 Hennepin County GIS - Printable Map Page 1 of I Hennepin ■ r � l R S 1- �. t r . .r� .ri .. ♦1 17 w i Y. • a. Mop ,�. Y* � -+ .ate •+ ,�.�• 'Y '+�rY�+s r� ' { _ 1 ±i NaLz '126h. ', .:. �;a� ,:Y1r 'jam }e `1 • ,{ `,�, 10 Parcel 17-117-23-31-0027 A-T-B: Abstract Map Scale: 1"=50 ft. N ID: Print Date: 11/20/2014 Owner Market Name: Linda J Lindquist Total: $190,000 Parcel 3710 Togo Rd Tax $1,972.12 Address: Orono, MN 55391 Total: (Payable:2014) Property Residential Sale $65,000 Type: Price: This map is a compilation of data from various sources and is furnished"AS IS"with no Home- Sale representation or warranty expressed or Homestead 03/1983 implied,including stead: Date: s fitness of any particular purpose,merchantability,or the accuracy and completeness of the information shown. Parcel 0.38 acres Sale Warranty Deed COPYRIGHT©HENNEPIN COUNTY 2014 Area: 16,438 sq ft Code: A Think Green! http://gis.hennepin.us/Property/print/default.aspx?C=451272.4547500005,4976391.32340... 11/20/2014 RECEIVED r City of Orono JUL 24 2015 Hardcover Calculation Worksh%ft OF ORONO Property�i p Y Address: 37io Tv Go R0AU C-41,VP ' I06-re@ro.t.") Prepared by: Date �rAai✓4 CA 6: V- Af1'o'C14T<-j"/mac 6-ZY-�S Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 i+er Tier 4 Tier 5 Stop 1: EXISTING HARDCOVER In the following table identify all items of existing hardcover on the property,keyed by letter to Certificate of Survey(survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties,identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Ke to Key Hardcover Item (Describe) Length x Width Total Surve (Square Feet) (Example) e Gars : 2A",x:30; . 72FF-1 -----1 Aoud' _ ?C?J.F. B �82 S.F. C f _ T�23R S.F. D T oP S.F. E 40 176' S.F. F GcJ .S3 S.F. i S.F. H iP YO S.S.�F—.-�' J O S.F_I K _ ___35 S.F. - L S.F. M _.�____ S.F. N S.F. O S.F. P _ S.F. Q — S.F. R _ _ _ S.F. S S.F. T S.F. U ___ S.F. V _ S.F. W S.F. X S.F. Y S.F. Z S.F. __(iTotal Exist_inq_Hardcover _ S.F. Excludable,:Hardcover, Se:e Cit .`Cod ,Se - B�Z (� _ S.F.__ S.F. .Fl 12 Total Excludable Hardcover o F. (3) Net Existing Hardcover [Subtract line(2)from line(1)1 Total Lot Area mar ivCcarl/A-Z: /o ' R T _Existing Hardcover Percentage [(3)T(4) ] _ 2 S. 61 1Y '14 11 (Proposed Hardcover next rage) 3"1 to Tho Rd Januaiy9,1013 2`13 2014-0 Ars- Bu< 1� IR CPJ tcS Se�) DATE TIME C OFIR CALLED IN ~ INSPECTION-N TREDUCED PERMIT NO. ^ OMPLETED ADDRESS to OWNER TELEPHONE NO. CONT ACTOR D CRIPTION uj FOOTING ❑ PLUMBIN INAL ❑ EXCAV/GRADtNG/FIWNG tk Q URED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS H ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Z OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: cc ujj O ). cc O W Q 2 W W J WRK SATISFACTORY:PROCEED ❑PROJECT COMPLETE QC #EFORE RRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY ORRECT WORK,CALL FOR REINSPECTION TEMPORARY V COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in 2) 249-4600 7r OwnerrAmdractor on site: Inspector. White Copyllnspector's File Canary Copy/Slte Notice V l � PA E TIME CITY OF ORONO CALLED IN LZ/ INSPECTION OTICE SCHEDULED PERMIT NO 4�107COMPLETED ADDRESS X37 /y % /�w . OWNER EPHONE NO.lr[� 3�T CONTRACTO /�� 44 ) >: DESCRIPTION } / El FOOTING El PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS h ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL 2 ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC NAL ❑ FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:NES _NO COMMENTS: cc W cc L x 16 LU cc g ' C'o Kr Ccs eK�/vSc -I/lr Q, {oma v?�,Crf W9�Ir SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W/❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED_CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. tel/ White Copy/Inspector's File Canary CopyfSite Notice C9 �Zp­ _D TIME CITY OF ORONO CALLED IN ����/// INSPECTION N TI `�j� SCHEDULED — S _�_ PERMIT NO. PLETED "m ADDRESS OWNER -n�TiLFPN NE NOk2,1 CONTRACTO DESCRIPTION W ❑ FOOTING ❑ D -FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING y0 ❑ FNDATION WATERPROOF El PLUMBING FINAL ❑ TREE REMOVAL Z ADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q FR MING [I MECHANICAL FINAL ❑ PROGRESS ❑ MING ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT v FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: o _ 0 W cc Q W W cc J d � eRRECT ISFACTORY PROCEED ❑PROJECT COMPLETE WWORK 3 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN NSPECTOR WILL RETURN VINSPECTION ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 ho in advance. (954249-4600 OwnerlContractor on site: inspector. White Copyllnspectoes File Canary Copy/Site Notice OP61 DATE iTIME IV/ CITY OF ORONO CALLE' D IN 1 , INSPECTION I SCHEDULED _b1z� PERMIT NO. COMPLETED ADDRESS a__l 0 OWNER TELEPH NO. rz-Z'�C) i`Iup t CONTRACTOR kit l ccn5A- DESCRIPTION W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q7'tNAL ❑ WATER HOOK-UP ❑ FOLLOW-UP 41 ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP r❑ HARD COVER REMOVAL v ❑ DEMO-SITE ❑ YES_NO ��gFOU�ND IOAT EN/R TTL Q OWNER/CONTRACTORTOMEET YOU: J Y�OS�' C COMMENTS: tA- 1,5 cc � - �✓tie.N 1 G�orre��'�o%�, ,pro✓.�c� - Qc cc W _ W W �e!r� ��rcrlc� Dc.t •s s 45 h� Lt Sa �e y j W ❑WORK SATISFACTORY:PROCEED 4PKMOJECT COMPLETE 'C 004MMCT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. O PHOTO TAKEN INSPECTOR WILL RETURN El [I STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑INSPECTION REQUIRED-CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copynnspectoes File Canary CopytSite Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. 2-014"017-9." COMPLETED ADDRESS /0 7'0 CO Irf r, OWNER TELEPHONE NO. CONTRACTOR 3Z DESCRIPTION ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q El POURED WALL ❑ MECHANICAL RI ElFJ LAKESHORWETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE /tEIPF TE INSPECTION Q El RADON SLAB [I WATER HOOK-UP OGRESS ElFINAL ElSEWER HOOK-UPOMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET OU:_/YES_NO / 2 COMMENTS: W Cc a o / 0 W Q 2 W Z W Cc d W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � W ❑CORRECT WORK&PROCEED 11ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contra on site: Inspector. Wh a Copy/Impector's File Canary Copy/Site Notice CERTIFICATE OF SURVEY FOR r ORONO COPY LINDA PETERSON i IN LOT 3, BLOCK 10, TOWNSITE OF LANGDON PARK I HENNEPIN COUNTY, MINNESOTA I ----..--.N 89026' 20" E 100.00 A N EDGE OF DEC - -_ _�-� r4)• � ATEA WETCAND�'\,-'_----� O \ O O 0 In to 100.0..................................................... \ City of Orono Planning &Zoning Plan pie i. .v Site Plan Review Date: � Z.• APPROVED ) (941.2 3.4;., -� ❑APPROVED WITy r;EVtSIG:IS(see notes - e.� ❑ DENIED - _ d SHED - - _ (B) o . Staff: ¢4 ` (942.8) 8.1 PROPOSED •5 SILT FENCE 944 -_946- 946 '2&0 10. (947.6) ryAS (944.6) \ �94J9 .0- PROPOSED�o DECK N GARAGE N N (C) VERIFY 13.5 9 (946.7) \(945.8) ( ) (945.3) (946.6) 28.0 15.6 ,. EXISTING M2 PROPOSED- W 0 DRIVEWAY _ �i 2.0 946 3 (J) 94 .6 (A) HOUSE (946.7) �, o,� 0 O FLOOR #3710 FLOOR 5.3 (94 .8 r LEVEL- LEVEL- co WALK F) 947.1 (955.7) (947.0) 0 36' OAK 0 16 8946.7 N .........:..:...... 34.0 ) N (951.9); O O S�(D) ; RET. 0 WALL (G) O (H) 7�} GRAVEL -DRIVEWAY (� n. (949.9) p WqL,K (947.5) i 949.11 947.0 BITUMINOUS LC) CURB --_ --' - - -p -- ---��-- -�- ---------��- -- ------ 6� Pow P / _ o TOGO ROAD N 04 AS SHOWN ON HENNEPIN COUNTY HALF-SECTION MAPS ..........S 89026' 20" W 100.00-........... LEGAL DESCRIPTION OF PREMISES : The West 100.0 feet of the South 175.0 feet of Lot 3, Block 10, TOWNSITE OF LANGDON PARK • : denotes iron marker found Rc:'k.0Zi'V (908.3) : denotes existing spot elevation, mean sea level datum --917- - denotes existing contour line, mean sea level datum NOV 25 2014 910.8 : denotes proposed spot elevation, mean sea level datum denotes proposed contour line, mean sea level datum CITY OF ORONO Bearings shown are based upon an assumed datum. This survey intends to show the boundaries of the above described property, the location of an existing house, shed, deck, edge of wetland, and spot elevations, and the proposed location of a proposed garage, drivweay, and grades thereon. It does not purport to show any other improvements or enroachments. 10-28-14: PROPOSED GARAGE 11-24-14: REVISED GRADES I hereby certify that this survey, plan, or report SCALE GR 0 N B E R G AND was prepared by me, or under my direct supervision, 1"=20' ASS 0 C I A T E S INC. and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. DATE CONSULTING ENGINEERS, LAND 11-19-13 SURVEYORS, & SITE PLANNERS �,,; ,�°� �G "*°'�Y ''' JOB NO. 445 NORTH WILLOW DRIVE LONG LAKE, MN. 55356 14-419 952-473-4141 Mark S. Gronberg Minnesota License Number 12755 14-419 '31 to V) Q 1� 20I�- 1283 f ■ • • • Zoning Department Memo To: Finance Department From: Christine Mattson, Planning Assistant (�►Y CC: Street File Date: August 4, 2015 G/L: 101-22205 Re: Escrow Refund Building Permit#2014-01293 pertaining to 3710 Togo Road is complete. Please refund$2,500 to the property owner, Linda Peterson. The following is attached: • Original signed escrow agreement -• Copy of cash register receipt showing escrow amount received Mail to: Linda Peterson.-,-,-, 3710 Tog Road Wayzata, MN 55391 wAstreet files\togo rd\3710\escrow refund 2014-01293.docx BUILDING PERMIT ESCROW AGREEMENT Orono Building Permit#2014-01293 AGREEMENT made this 22 day of PJ6VeAU6L, 201 , by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") Linda J. Peterson ("Owners"). Recitals 1. A building permit application has been filed a detached accessory structure located at 3710 Togo Road the ("Subject Property"), legally described as The West 100.0 feet of the South 175.0 Feet of Lot 3, Block 10, Townsite of Langdon Park. 2. Owners request the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #2014-01293 if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when all requirements related to the project are complete. City Staff shall review the terms of this escrow agreement two times per year to determine whether the requirements of the project have been successfully completed and whether it is appropriate to return the funds. Owner may also request the release of the funds, and such funds shall be released upon City Staff receiving the appropriate verification that all requirements of the project have been successfully completed. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: CITY OF ORONO OWN ti By. — Its: - CITY OF ORONO * 2014 - 01362 * 2750 KELLEY PARKWAY DATE ISSUED: 11/24/2014 ORONO, MN 55356- 952)249-4600 FAX: 952 249-4616 ADDRESS : 3710 TOGO RD PIN : 17-117-23-31-0027 LEGAL DESC : TOWNSITE OF LANGDON PARK : LOT 003 BLOCK 010 PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-TIED TO BUILDING PERMIT NOTE: THIS$2500 ESCROW IS TIED TO BUILDING PERMIT 2014-01293 APPLICANT ESCROW FEE-BUILDING 2,500.00 LINDQUIST,LINDA ESCROW FEE-EROSION CONTROL 0.00 3710 TOGO RD ESCROW FEE-GRADING 0.00 WAYZATA,MN 55391- TOTAL 2,500.00 Payment(s) CHECK 3971 2,500.00 OWNER City of Orono 2750 Kelley Parkway Orono MN 55356 952-249-4600 LINDQUIST,LINDA 3710 TOGO RD Receipt No: 3.012349 Nov 24, 2014 WAYZATA,MN 55391- Clay Peterson Previous Balance: .00 Permits AGREEMENT AND SWORN STATEMENT 2014-01293 3720 Togo 2,500.00 Road The work for which this permit is issued shall be performed according to 101-22205 the approved plans and specifications,applicable City approvals,and the Deferred Rev-Developer Deposit State Building Code. This permit is for only the work described and does "------""'-'-" not grant permission for additional or related work which requires separate Total: 2,500.00 permits. All provisions of laws and ordinances governing this type of work Check shall be compied with whether or not specified herein.This permit will Check No: 3971 2,500.00 expire and become null and void if construction authorized is not Payor: commenced within 180 days of the date of issuance,or if construction is Clay Peterson suspended for a period of 180 days at any time after work has commenced. 1,. tal Applied: 2,500.00 The applicant is responsible for assuring all required inspections are --------------- requested in conformance with the State Building Code.This permit may be Change Tendered: .00 revoked at any time for due cause. 11/24/2014 08:47AM Applicant Permitee Signature Date Issued By Signature Date 11— FermiAl - 14 1 4 ► Permit#: 2014-01293 Update Address f•Main PIN Address Permit Address: 3710 Togo Rd f Additional PIN Address F Permit Issue Parch hm" General I Fees Inspections(n I Notes I Applicant Detail CO Detail Seq InspeCtIon Type Inspedor Date Status H Fee Rec • 1 (Slab_ _ METD 112/5120141F Y 0 • 2 �SIaD REI NSPECTIONfiMETJ 1 4 P Y 0 — -- • 3 Footing(or Rebar) METJ _15/4/2015 +P_ Y 0 • 4 Frarrlkng -- IMETJ 5/4/2015 P--_- Y_0_ • 5 iiFinal - -- tMETD '4/30/2015 F Y 0 • 6 Fine)REINSPECTION METJ 5/4/2015 P Y 10 ►. x Add New Delete