Loading...
HomeMy WebLinkAboutRe: exterior siding w O� O CITY of ORONO Municipal Offices Street Address: Mailing Address: 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay,MN 55323-0066 k�ES to August 7, 2012 To: Whom it may concern �3 %��� From: Willie Gibbs, Building Inspector i' Re: 3645 Togo Road This letter is in regards to an exterior siding project at 3645 Togo Road in Orono, Minnesota. I requested specific information as to the siding product and the installation process. The proposed siding product/application is not a typical product used in residential construction so additional information was asked for and received. The insulation/wrap part of the cladding process was inspected when it had progressed far enough along to visualize the work. It appeared at the time of inspection that the information that was provided as to the installation process was being followed by the siding crew. Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us /r _ �, ' ice• 'Yt { L ai ael ,r • try f / � '4 y b � •, � �\ �• '• ^ NI '��• �r� +4r a, rilya Orf �!+r' � fi�.�.. J k `�:'d�—`' Tt'• i r J T. 1 �r 111' °,, .. ,_..y.. a,4'��)F �y� ,� nl 41eP���•��� �~ CD I � 1 by , a1, • ,;. A. MM t4 W f t r ' " Cn 1 l J�� �5 S 1 w Confirmation Report — Memory Send Time Aug-07-2012 08:56am Tel line : +9522494616 Name CITY OF ORONO Job number 895 Date Aug-07 08:55am To 6124653214 Document pages 001 Start time Aug-07 08:55am End time Aug-07 08:56am Pages sent 001 Status OK Job number 895 *** SEND SUCCESSFUL *** O CITY of OR<�NO O O Maaaiclpial Ol'Hca:s F8treot Address: M+aillnM Address: G1, 2730 Kelley Psrlcway P.O. EI-ox 66 ,$ Orono,MN 55356 Crysral May, MN 55323-0066 O August 7,2012 To: Whom It may concern From. Willie Gibbs,Building Inspector Re. 3645 Togo Road This letter Is in regards to an exterior siding project at 3645 Togo Road In Orono, Minnesota. 1 requested specific information as to the siding product and the installation process. The proposed siding product/application is not a typical product used in residential construction so additional Information was asked for and recalved. The Insulation/wrap part of the cladding process was inspected when it had progressed far enough along to visualize the work_ It appeared at the time of Inspection that the Information that was provided as to the installation process was being followed by the siding crew. Telephone(952)249-4600•Fax(952)249-4616 www.ci.orono.snn.us