HomeMy WebLinkAbout1996-007709 - new septic system PERMIT
i
dry OF ORONO PERMIT TYPE:
2750 Kelley Parkway- P.O. Box 66 SEWER if WATER,
Crystal Bay, Minnesota 55323 Permit Number: t}{7770,
(612)473-7357 Date Issued:
02/27/96
SITE ADDRESS:
2B7�� THOROUGHBRED LA
LSV
P. I . N. -,'-- 04--117-23-11-0016
DESCRIPTION:
NEW SEPTIC SYSTEM
Sewer & Water Permit Type NEW SEPTIC SYSTE
Sewer t-i Water Wc-r k Type RESIDENCE
i
REMARKS:
FEE SUMMARY:
BaseFee $100.00
j}.} /7
Surcharge
) t}
----------
Total Fee $100. 50
i
CONTRACTOR: - Applicant, - OWNER:
CLOVER HILL COMPANY INC: 57237155 TONY E I DEN CO
BOX 226 2570 THOROUGHBRED LA
SHAD'OPEE MN SS: 79 ORONO MN 553S6
(612) 723-7155
THE UNDERSIGNED HF,! EOY REQUE STS PERM I� TO ,I�t E k��t. n CEMENTS
SPECIFIED AND AGREES TO tom. ALt, .Wil IPS �t I+�T .�C t�?L I` E ��, CITY �F t
L_ ORONO ORDINANCES AND STATE s- �iINNE TA "SUI�LDING t�E" RE{
APPLICANT/PERMITEE SIGNATURE ISSUED BY:SIGNATURE e.0
CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION
Box 66 (2750 Kelley Parkway)
Crystal Bay, MN 55323 Com'
JOB SITE ADDRESS: y 0 Gy 4 kc-ei
Occupancy Type: Residential' Commercial Other
Permit Type: New or Replacement System, $100.00
Repair Existing System, $ 50.00
(Tanks or Drainfield)
0.50 State surcharge added to above fees
*See fee schedule for non-residential permit fees
Owner's Name: Cd
e v` PhoneNumber•
Mailing Address: City: Zip:
Contractor's Name: Phone Number: it 7 cf - z 2q 7
Mailing Address:Pois,,_ 3S-L( City:L Zap:5.35-7
DO NOT MAIL PAYMENT WITH THIS APPLICATION
GENERAL INSTRUCTIONS
1. Applications for septic system permits may be mailed or submitted in person at the City
Offices; however, permits will not be mailed out. The permit must be picked up in
person at the City Offices and work must not begin unless the permit card is on the job
site.
2. Permits will be issued only to contractors holding a City of Orono Septic System
Installers License.
3. All work must be done in accordance with the approved septic system design. Design
reports are not considered approved unless accompanied by the "City of Orono Septic
System Approval" cover sheet signed by the City Inspector.
4. The following inspections will be required for all septic systems:
A. Pre-installation site inspection to include inspector, installer, and general contractor.
B. Tank installation prior to covering.
C. Drainfield trench installation prior to covering. For mounds, inspection is required
after rough-up but prior to sand placement (sand will be jar tested for silt content),
and again during pressure distribution piping installation in the rock bed.
D. Final inspection to verify proper final cover depths and to verify that all pump station
(where required) components are functional and comply with codes.
5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24-
hour notice is required for all inspections.
NOTE: Applicant must initial all spaces. Fill in all appropriate blanks, check all appropriate
boxes.
1. I have received a copy of the system design including the City of Orono
Septic System Approval Cover Sheet.
2. I will be installing the following:
A. Tanks: X Precast Concrete _ Other Manufacturer �rwi 4
Tank Capacities: 1) gal. 2) 13OD gal. 3) ( 3co gal.
B. Pump Station (if required)
Pump make & model yy (attach pump curve &
literature); system design requires _ gpm at feet of head.
High water alarm make & model Outside
electrical work to be completed by installer )C electrician
other Inside electrical work must be completed by
electrician.
C. Treatment System:
Trenches: s.f. Mound
Depth of rock below pipe Rock bed dimensions L_'
'x '
Drop Boxes Sand bed dimensions <r4(C) xJQ5_'
Distribution Box Pressure Dist. Pipe Diam. i `/Z "
Maniford Pipe Diam. -?--
D.
D. Final Cover/Topsoil to be: borrowed from site
(show location on site plan)
trucked in
The undersigned hereby applies to the City of Orono for issuance of a septic system installation
permit, agrees to do all work in strict accordance with the ordinances of the City and the
regulations of the State of Minnesota, and certifies that all statements made on this application
are complete, true and correct.
Signature of Applicant: .�� l/� .�i� Date:
M.PCA Certification No.:
------------
Staff Review: App r val Denial
Date:
Reviewer: JV
Reason for Denial:
i
14crrY or oRONo
SYSTEM APPROVAL
.0clttOf ORONY
�.,.
MunicipalOrrices
Post O( Box 66
Jnr 0 Crystal Day,Minnesota 55323-0066
\ z S110
LOCATION: 2570 Thoroughbred Ln .
OWNER: Tony Eiden
GENERAL CONTRACTOR: Tony Eiden SEPTIC CONTRACTOR: Mover Hill Co .
SITE EVALUATOR: S—P Testing REPORT DATE: May 11, 1994
The City of Orono has Approved your on-site system design as of September 14, 1995
(approved-disapproved) (date)
with [he following comments: The proposed residence must be relocated South by
nine feet or more in order to maintain a 20 ' setback to the alternate
drainfield site.
THIS IS NOT A PERMIT. This is a design approval form whicli must accompany the site plan. A permit must
be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is
enclosed.
NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the
Inspector (473-7357). Call for inspections 24 liours in advance.
ALL DRAIN FIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain
in place until final site grading. Approval to pour footings will not be granted until the Inspections Department
leas verified that primary and alternate sites are adequately protected.
NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20'
of tested drainfield sites either before or after system construction. Compaction of these areas could render them
unusable prohibiting the timely completion and or limiting the long term use of the property.
A site copy will be available at the City Offices for the septic contractor.
CITY OF ORONO
By
Stephen Weckman, On-site 8ystems Manager
TELEI'IIONE-473-7357 • FAx-473-0510
S-P TAESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627
951 Katydid Lane NE • St. Michael, MN 55376 a (612) 497-3566
May 11, 1994
Tandem Properties
Lot 16 , Block 1
Dickey Site
Orono, Henn. Co. , MN
This On-Site Sewage Treatment System is Designed for a Type 1, five
bedroom home Designed in accordance with the Minnesota Pollution
Control Agency Chapter 7080 and local ordinances .
The soils on this site are SCS soils mapped - LrB - Lester loam.
A seasonally high water table was located at 14" to 26" , (mottled
soil ) . Due to the seasonally high water table, a Pressurized
Mound System will need to be installed. The bottom of the rock
bed must be located at least 3 ' above the seasonally high water
table.
The soils at a depth of 12" have a percolation rate averaging
10 . 1 min/inch.
A pumping chamber will need to be installed to lift the effluent
to the treatment area.
The manifold and supply line pipe must have back drainage to the
pumping chamber. The distribution pipes shall have their ends
capped. Be sure the rock and sand fill material are clean. The
sod layer below the entire mounded area must be turned over, just
break up the sod, be sure not to over work.
The power supply and switches must be located outside the manhole
and pumping chamber in a weather proof enclosure. A warning device
must be installed with a light and sound device, this is in case of
a pump failure. (mercury floats are a good method) .
All neighboring wells are located greater than 100 ' away from the
proposed treatment area.
CONT ' D
Tandem Properties
Lot 16, Block 1
Dickey site
(2)
Keep all heavy equipment off of the proposed treatment area before
and after construction. The treatment area should be marked off
before construction. This Design is not valid & the system will
need to be relocated if failure to protect the areas proposed
for On-Site Sewage Treatment occurs.
With proper installation and maintenance, this system should have
no problem in treating septic effluent effectively.
Nothing other than gray water, (laundry, showers , etc. ) human
waste & toilet tissue should be disposed of into the septic tanks .
Garbage disposals are not recommended. Smaller amounts of laundry
soaps , dish soaps , cleaning agents , etc. are better for the system.
Antibacterial soaps & chlorine agents may kill the bacteria
needed to treat septic effluent properly. Additives are not
recommended, they may cause harmful damage to your system.
Recommend to pump & clean your tanks by a certified pumper
every year if you have 1 tank & every 2 years if you have 2
tanks to insure proper maintenance.
even B. Scher ers L
SBS/ds
- --- --------------
��
0 oa(.•>
� NI
/ t , �3R
J0.0 1i
/01..4 � / •M �Y
t,04S H / K
\0*�--Avq,
J /mOft 0
y., �\ roafq C7`t� iO PO S� Ita-Cr��t kC 14�'�1R S
INIM&OVI of-AN
1.` r-,2
� �`� ►-� / -F,oa5.7
OOWWCTOR
0 R,-A— -
PERMIT C; � :?
no
AFF f ,;B WtTH 1 - %�-'-ECTIONS P,� i � / ,; GD��)�-1 �A t��ot-►13�v�
F � �� a
1TNO) ROVED — .,rtkECT & R� �' �, / ��cQa�sro>l
Dese cofnme ;:s are for your 1.,,?_/rrnetlon. All vee "P¢o?osteo ,� p S�a� �1e��S
`tail compliance with Bit tlp{�z Able '%U*ing & +�' Ft�Y�Ylri►� iy o \\� �--'/ Dass
+Wkerr►ents intruding FGWr►s not SpgeWjCajty
note n r„
KED' THIS PTAH g' cM SrM AT A L T A&-
sb Gi Perc:o!otion Tests Scale=
XSoil Borings
0 Bench Mork
\
Note: This system is to be constructed to meet
the Wiinnesoto Pollution Con!rol Agency
Chapter 7080 & Local Ordinanc(
30/ Check all underground utilities
—
i
- M —
PRCDE F:.�1
tRTY 0
14,
An ---7A
�7
S—P TES TING
o — C)esiyned By-. -
Cole: /L3��F, PH.62 -497-3566
H. ►
MV) _ - -'
r _ A SS �
SET- BACKS 1 a t i. /O' 17 t !
HOUSE System must be:
Tank 2,02 from property lines X- S - jot,] AA SA=IL W
il L S t lf from wells
from bags.• "
l.1�'r �. ►p Wt'a" I—"�,;,; Treatment area _ from lakes, _ streams
eat
NOTE:Power supply and switches must be located in a
Tr
MaNHo�s eaItmennt t �'from wells Oreo �� from property lines weather proof enclosure outside the pumping chamber and manhole
—insyALt.ow
. QALCALt— �o'from Bldgs.
�——, J-D from trees t� SOIL BORING ELEVATIONS
�Qmin.
THAI EL.-10ri.)
A. da.su t o TH."2 EL.4210
grade /o
. Torik { Tank. TH A3 EL.-11:.a.�•D
Drop to Tonk_ I III PRES/S?UVREwnDIASn1TRIBUTION MOUND SYSTEM TH.74 EL7&"4
Min. l toe u 'L TH. 5 EL.-'o7.1
Pumping
i
Max.I"to4' Chamber ELEVATION at PROPOSED PUMPING
CHAMBER-LeaIsDLT-v VWl` e 10)0!•t7
j 4to 6"dia.pipe teary„_,
SYSTEM DESIGN —MOUND Lowe-gw B u lot q.o_
TYPE-2, BEDROOM , Average percolation rote 10,) min./inch (design.83 sq.ft treatment area per gal. of daily sewage flow) I
.24�0_gal./day x,.83sq.ft/gal.j0_4A sq.ft.of treatment area +10% =LL%_4 sq.ft. (= IOft.width=_Lr&_ft.length of bed area+side slope run oto I x'I.1 height= 327_ft..x 9 ft.lawn•area needed) i
Clean rock needed— (AL) sq.ft.treatment area x 05 depth of rock--fir 1cu.ft=27= cu.yds,(3/4�to 21/� dia. ,includes f*of rock above p pe) '
c,oAYh /
_ Clean sand fill below rock needed fly cu.yds. approx. sandy loam backfill�_cu.yds.approx., topsoil 6" r� Q cu.yd.
CJ�lSN� > O O -O 50 L O llr-K�ataJLA� S40P�. -Lv�<oCAL
�,,
Number of tanks required_�___, Ist tank 11� gol. ,2nd tank O gal.mini rims pW s Prim P►tN>, Am eOS R-
i
Pumping chamber capacity- 25% of daily sewage flow of 1S2_gal.=J5Le.gal.+reserve storage of 15 00A 1/BIr-.��gal.+pipe back drainage— PROPERTY OF:
of-Y-gal./100 lin.ft.of 'dia. supply pipe, lin.ft neededI1-:CLgol.+ manifold.1'V-gal./IOOtirLftof dia.pipe,lin.ftneeded , _3.__gal, t 0'r �LpL1L
total capacity needed 36-�j_gal.(plus area for pump) u$s rr.l n. A,!ro g-% Cet f" p ip tn V.\
Distribution t�piipe L1.dia. , ak_lin.ft,32•dia. perforations " oport
Pump size -rte hp. (pumpoble capacity 214 gal.4cycles/day) y�����j_�_y o mss o_�Sc1�F]Q-U���_��•�L�r�,�o�__. I S—P TES TING, ,N&
Note: When constructing bed , this area should be shaped Note- Distance-from treatment area to neighboring welts— Desi ned 9
to divert run-off from entering treatment area. L���''t� f%A)4 lops g y
Dc?e PH. 6!2-497-3566
MOUND DESIGN WORKSHEET
(For Flows up to 1200 gpd)
A. FLOW Estimated Sewage Flow in Gallons per Day(gpd)
Estimated r)SO gpd Nwn�
or measured x 1.5 = gpd. Bedrooms lYPe I II type 1II Type IV
2 300 225 180 60%
of
B. SEPTIC TANK LIQUID VOLUMES 4 6 0 3755 256the
-lo-LO 16 )-/Q oy gallons 6 900 525 35 750 450 32 0the
7 1050 600 370
8 1200 675 408
C. SOILS (refer to site evaluation) � IWC ,,®®
11 I! SgecT-t C�.ue
1. Depth to restricting layer= 1 - :aof Ll inches Bed = >
2. Depth of percolation tests = t a inches `PH-0 `""m''
3. Percolation rate /0-1 mpi 2i«tea` 17.000 1'.'125
500
5 a 6 1.500
4. Land slope �'3 % 7 o<8 2.000 0o
ova 9 See fig.C-6 (x 1.5)
D. ROCK LAYER DIMENSIONS
1. Multiply flow rate by 0.83 to obtain required area of rock
layer:A x 0.83 = ,
n o gpd x 0.83 sq.ft./gpd = (,az sq. ft:})0'5o=(o'dy°
2. Select width of rock layer(10 feet or less) = /0 ft.
3. Length of rock layer= area_width = Rock Bed
!.j -L-sq. ft. 0 ft. _q ft.
1tiSJJ••titi•JJ.•titi•J..titiN•J•1ti•JJ••�ti•J••ti1•.JJ••tti•JJ••titi•JJ••{1.JJ••tti•J••ti�•JJ••titi•JJ••titi•JJ••titi•JJ••tititi••JJ.••ti��••
<10 ft.idth
.t.ti •N• •t• •ti•t •ti.S•ti.
•J•J•J•J•J•J•J•J•J•J•J•J•J•hJ•J•
E. ROCK VOLUME Length
1. Multiply rock area by rock depth to get cubic feet of rock;
(,. sq. ft. x/_o-<- ft. =r.L`�cu. ft.
2. Divide cu.ft. by 27 cu. ft./cu. yd. to get cubic yards;
4�cu.ft. i 27=�cu. yd.
3. Multiply cubic yards by 1.4 to get weight of rock in tons;
cu. yd. x 1.4 ton/cu. yd. =_Z_t� tons.
F. ADSORPTION WIDTH c.LA q L o A v✓1 Absorption width Si-6n Table
1. Percolation rate in top 12 inches of soil is >o mpi Percolation Rabe tea» Raw al
Minatmperinch Soil Texture P'"y -dhW
FrQ. •spa
2. Select allowable soil loading rate from table; Faster than 0.1 Coarse Sand 1.20 1.00
/ 2 0.1 to 5 Sand 1.20 1.00
L4 gpd/ft- 0.1to5 Fine Sand- 0.60 2-00
6 to 15 Sandy Loam 0.79 1-52
3. Calculate adsorption width ratio by dividingrock laver 16 co 30 Loam 0.60 2.00
31 to 45 Silt Loam OSO 2.40
loading rate of 1.20 gpd/A2 by allowable soil loading rate; 46 to 60 Clay Loam 0.45 2.67
1.20 d f-2 i 61 t0120 Clay 024 5_00
gp / ,y gpd/ft2= (off Slower than 120 Clav
'•Soil having 5096 or more of fine or very fine sand
4. Multiply adsorption width ratio by rock laver width to get
required adsorption width;
a.G0 x/oft= ab.1 ft
G. ' DOWNSLOPE DIKE WIDTH
1. If landslope is 3% or more,subtract rock layer width from
adsorption width to obtain minimum downslope dike toe
a.L•'I ft- in ft = feet
2. Calculate Minimum mound size base on geometery:
a. Determine depth of clean sand fill at upslope edge of rock
layer: Separation ). S feet
b. Multiply rock layer width by landslope teoe cover.
to determine drop in elevation; = teec Re ed
Slope Difference Seperetloa feet
O x�Z %=-100 =, feet slept Ctfterent o o et
UpsloDe Width
c. Add depth of clean sand for separation (2a) 12 feet Rock Bed width
at upslope edge,depth of rock layer(1 foot) to depth of J]L-feet Downslope Width
cover (1 foot) to find the mound height at the upslope edge Leet
of rock layer;
)Sft+ lft+ lft= 3,Sfeet
d. Enter table with landslope and upslope dike ratio.
Select dike multiplier of 2-6r)
e. Multiply dike multiplier by upslope mound height
to find upslope dike width: 3.S x 3.57 = ) R feet
f. Add depth of clean sand for slope difference (2b) at
downslope edge,to the mound height at the upslope edge
of rock layer (20 to find the downslope height;
Z ,5' ft+ , 'ft=-2..�feet
g. Enter table with landslope and downslope dike ratio.
Select dike multiplier of 4 .5
h. Multiply dike multiplier by downslope mound height
to get downslope dike width: 3. le_x y`!-=-L�_feet
i. Compare the values of step G.1 and Step G.2h Select the
greater of the two values as the downslope dike width;
feet :. .:
- UDs100s Wldtn
hs a
wi th s the s
t
JTotal mound d
. Tot o
upslope dike (G.2e)width plus rock trecl e.0 Width
)D 1L(¢�test
layer width (D.2)plus o UDs1009 Wlacn uoSleoe w�atn
3 ��feet11 1 _teat
downslope dike width(G.2i); _ E
I-z. ft+eft+j ft= feet
`
Downslope Wletn
k. Total mound len is the sum of Leet
upslope slo dike width (G.2e)plus rock laver ' ' '' '`
length (D.3)plus upslope dike width (G.2e);
�I ft+��ft + 1a, ft= 9 feet I
Toter Length-/Da'-
Vowmlope UPSIOPe
3:1 4.•1 5:1 6:1 7:1 3:1 4:1 5:1 6:1 711 8:1
%slope
0 3.0 to 5.0 60 7.0 3.0 4.0 5.0 6.0 7.0 8.0
1 3.09 4.17 526 638 753 2.91 3.85 4.76 5.66 656 7A1
2 3.19 4.35 5.56 6.312 8.14 2.83 �,Za'L 456 536 6.14 6.90
3 ??0 �. ¢,54� 588.^. %32 b.&6 2T �3?71 431 5.08 5.19 6Ai
4 3.41 476 625 7.89 _ 1SZ 268 -3.45 4.17 t86 5.46 6.06
5 3S3 5.00 6.67 8357 1077 261 333 4.00 4.62 5.19 571
6 386 526 7.14 938 12,07 254 323 3.855 4.41 4.93 5.41
7 380 556 7.69 1034 1373 248 3.12 3.70 413 4.70 5.13
8 3.95 5.88 833 1154 15.91 242 3.03 357 4.05 4.0 488
9 4.11 625 9.09 13.06 18.92 236 294 3.45 3.90 430 4SS
10 419 6.67 10.0 15.00 2333 231 286 333 3.75 4.12 4.44
11 4.48 7.14 11.11 17.65 30.43 226 278 3.23 3.61 3.95 426
12 4.69 7.69 1250 21.43 43.75 221 270 3.12 3.49 3.80 4.08
F-17
PUMP SELECTION PROCEDURE
END PERFORATION OF A PERFORATED LATERAL
A. Determine pump capacity: w-c-- .
Gravity Distribution
1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of - ,,�.,»„�.rae.k ca ft._
water use rate. " h'o-o'..WO C-1"
2. Maximum suggested for delivery to a drop box of a home system is 2,700 ��»-c+"" �°^»'h
ai-coo w-.T"
per hour(45 gpm)to prevent build-up of pressure in drop box. "/4'"F a I» a Imo°�°,•
Pressure Distibution ft"""of►.1
3.a. Select number of perforated laterals 3
Sonfftd
b. Select perforation spacing= 3 feet. ` °'o,;". L.W
C. Subtracj 2 ft.from the rock layer length.
Vk feet.
d. Determine the number of spaces between perforations.
Length perf.spacing= ft.+ -1,_ft.= Z�spaces Required Perforation Discharge
e. _Z,�spaces+1= A I perforations/lateral in gallons Per minute(gpm)
f. Multiply perforations per lateral by number of laterals to 913a'� �d a �2� a P� °'d'PW
get total number of perforations. ,,�- x �__2a perforations. (feet)
g- 14 x 4> 4==gpm.
1.0a 0.74
SELECTED PUMP CAPACITY _gpm 2.Ob 0.80 1.04
B.Determine head requirements- a.Use for single family homes
1. Elevation difference between pump and point of discharge. b.Use for all other applications
)_feet
2. If pumping to a pressure distribution system,five feet for pressure
required at manifold if gravity stem,zero.
feet
3. Friction loss
a. Enter friction loss table with gpm and pipe diameter. Pipe Length ,
Read friction loss in feet per 100 feet from table. Point of Discharge
F.L.= D , (o ft•/100 ft of pipe
b. Determine total pipe length from pump to dischargeElevation Difference)
point. Add 25 percent to rite length for fitting ETPu''
P
loss,or use a fitting loss chart. Equivalent pipe
length-1.25 times pie length= F-18b
)3 s x 1.25= /&;'� feet
1.5 inch 2.0 inch 3.0 inch
c. Calculate total friction loss by multiplying SPm Friaim I=per 100 ft of pipe
friction loss in ft/100 ft by equivalent pipe length. 10 0.69 0.20
Total friction loss= /(o9 x d • :, +100=�_feet '12 0.96 0.28
4. Total head required is the sum of elevation difference, 14 1.28 0.38
special head requirements,and total friction loss. 16 1.63 0.48
18 2.03 0.60
20 2.47 0.73 0.11
+ S' + 25 3.73 1.11 0.16
(1) (2) (30 30 5.23 1-55 0.23
35 7.90 2.06 0.30
40 11.07 2.64 0.39
TOTAL HEAD 4?feet 45 14.73 3.28 0.48
50 3.99 0.58
55 4.76 0.70
G Pump selection 60 5.60 0.82
1. A pump must be selected to deliver at least
Z'� gpm (Step A)with at least )'/ feet of total head(Step B).
• 1 `_ J
CEkl I'1�ATI0[' ;} 00627 Lc of Soil Borings
Location or Project Lot 16 , Block 2, Dickey site, Orono
Boririgs �mdde by S-P Testing, Inc. Steve Schirmers Date 4-12-94
Classifiction System: AASHU USDA-SCS X Unified Other
Auger used (check two) : Iiand X or Power Flight or Bucket X
Depth, Boring number 1 Depth, Boring number 2
in in
feet Surface elevation 1025 . 7 feet Surface elevation 1024. 7
Topsoil dark brown loam Topsoil dark brown
0 - 10" loam
1 - B oyoam 10"- 1 ' 4"-MOTTLED 1' 4" 1 - 0 - 1 ' 2"-MOTTLED 1' 2"
Rusty olive brown loam Rusty 1 ' 2" - 1-1/2 ' graoam°W
114" - :1 ' 10"
2 Rusty olive brown 2 - Rusty gray brown
clay loam clay loam
1110" - 2110"
3 Rusty olive brown 3 1-1/2 ' - 3 ' 4"
loam Rusty olive gray sandy
3 ' 4" - 3110" loam
Rusty olive gray
Rusty olive gray loam
412" - 51 sandy loam 3110" - 5 '
5 - 5 -
6 - 6 -
7 - 7 -
1
8 - 8 -
End of boring at 51 feet. End of boring at 51 feet.
Standing water table : Standing water table:
present at 2 ' 5" feet of depth, present at 1110" feet of depth,
17 hours after boring . 17 hours after boring.
Not present in hole Not present in hole
Mottled soil : Mottled soil :
Observed at 1' 4" feet of depth. Observed at 1 ' 2" feet of depth.
Not present in hole Not present in hole
Comments: Comments :
L-13
CERTIFICATION 4 00627 Logs of Soil 13oringss
Location or Project Lot 16, Block 1, Dickey site,Orono
Borings made by S-P Testing, Inc. Steve Schirmers Date 4-12-94
Classifiction System: AASHO USDA-SCS X Unified Other
Auger used (check two) : Hand X or Power Flight or Bucket X
Depth, Boring number Depth, Boring number 4
in in
feet Surface elevation 1025 . 0 feet Surface elevation 1025. 4
0 0
Topsoil dark brown loam Topsoil dark brown loam
0 - 10" 0 - 10"
1 Brown clay loam 1 Brown clay loam
2 - 10" - 2 ' 211-MOTTLED 2' 2 2 - 10" - 21-MOTTLED 2'
Rusty olive brown Rusty olive brown
clay loam clay loam
3 - 11
212" _ 3 ' 411 - 2 - 3 2
4 _ Rusty olive brown 4 - Rustyloamve brown
loam
5 - 314" _ 51 5 - 312" _ 51
6 - 6 -
7 - 7 -
8 - 8 -
End of boring at 5 ' feet. End of boring at 5 ' feet.
Standing water table : Standing water table:
present at 3 ' feet of depth, present at 4 ' 4" feet of depth,
17 hours -after boring . 17 hours after boring.
Not present in hole Not present in hole
Mottled soil : Mottled soil :
Observed at 21211 feet of depth. Observed at 2 ' feet of depth.
Not present in hole Not present in hole
Comments : Comments :
T
6062i i:s of _soil J3orin( 5
Location or Project Lot 16, Block 1, Dickey site, Orono
BorirggsLmade by S-P Testinq, Inc . Steve Schirmers Date 4-12-94
Classifiction System: AASHO USDA-SCS X Unified Other
Auger used (check two) : Iiand X or Power Flight or Bucket X
Depth, Boring number 5 Depth, Boring number 6
in in
feet Surface elevation 1027. 1 feet Surface elevation 1026. 2
0 Topsoil dark brown Toam —-- 0 -
0 - 6" Topsoil dark brown
1 - Brown clay loam 1 _ 0 - 1 , loam
Brown clay loam
6" - 1-1/21 -MOTTLED 1- /2 l ' - 1-1/21 -MOTTLED 1-1 2
_ Rusty 'blive brown
2 clay loam 2 - Rusty olive brown
1-1/2 ' - 2 ' 8" clay loam
3 - 3 - 1-1/2 ' - 3 ' 2"
Rusty olive brown
loam Rusty olive brown
4 - 4 - loam
5
2 ' 811 _ 5 , 5 - 31211 - 5 1
- O .J
6 - 6 -
7 7 -
8 - 8 - I
End of boring at feet. End of boring at 5 ' feet.
Standing water table: Standing water table :
present at 4 ' 4" feet of depth, present at 2 ' 8" feet of depth,
17 hours after boring . 17 hours after boring.
Not present in hole Not present in hole
Mottled soil : Mottled soil :
Observed at 1-1 2feet of depth. Observed at 1-1/2 ' feet of depth.
Not present in hole Not present in hole
Comments : Comments :
CERT.#00627
PERCOLATION TEST DATA SHEET
S-P Testing, Inc. 4-13-94 9 : 05 a.m.
Percolation test readings made bv on starting at p.m.
,d„«A
Lotl6,B1k.1,Dickey site 1 4-12-94
Test hole location , Hole number , Date hole was prepared
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth. inches Soil texture
0 - 10" Topsoil dark brown loam
10" - 12" Brown loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
4-12-94 4 : OOpm 12
Date and hour of initial water filling Depth of initial water fillinginches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
Maximum�%ater depth above hole bottom during test_ 6 inches
Time Percolation
ime interval. Measurement, Drop in water rate. Remarks
minutes inches level. inches minutes per
inch
8 : 55 prefill 6
9 : 05 9: 35 I 4-1/8 7. 3 30 min
9 : 46 10 : 16 j 3-13/16 7. 9 "
10 : 29 ! 10 : 59 3-11/16 8 . 1 "
I
I
i
I
Percolation rate = 7. 8 minutes per inch.
CERT.#00627
PERCOLATION TEST DATA SHEET
S-P Testing, Inc. 4-13-94 9 : 06 am
Percolation test readings made by on starting ar
Lot16,B1k.1,Dickey site 2 `' " 4-12-94
Test hole location Hole number Date hole was prepared
12 6
Depth of hole bottom inches. Diameter of hole inches
Soil data from test hole:
Depth,inches Soil texture
0 — 12" Topsoil dark brown loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
4-12-94 4 : 00pm 12
Date and hour of initial water filling . Depth of initial water filling inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
Maximum water depth above hole bottom during test 6 inches
Time Percolation
i ime interval. Measurement. Drop in water rate, Remarks
minutes inches level, inches I minutes per
inch
8 : 44 prefill 6
9 : 06 9: 36 4-1/8 7. 3 30 min
9 : 45 10 : 15 3-13/16 7. 9 "
10 : 30 11: 00 3-13/16 7. 9 "
i
I
i
Percolation rate = 7. 7 minutes per inch.
CERT.#1Q627
PERCOLATION TEST DATA SHEET
a.m.
Percolation test readings made by S—P T -s i nq, Tnn_ on 4-1 1-94 starting at 9 - 07 p.m.
(date)
Test hole location Lot 16 ,B 1 k. 1,Di ckey site Hole number 3 ,Date hole was prepared 4—12_9 4
Depth of hole bottom 12 inches,Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 - 10" Topsoil dark brown loam
10" - 12" Brown clay loam
Method of scratching sidewall Knife
2
Depth of gravel in bottom of hole inches
4-12-94 4 : 00pm 12
Date and hour of initial water filling ,Depth of initial water filling inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
Maximum water depth above hole bottom during test 6 inches
Time Percolation
.i ime interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
8: 55 prefill 6
9 : 07 9: 37 5-1/2 5. 5 30 min
9 : 44 10 : 14 I 5-1/16 5. 9 to if
10 : 31 11 : 01 " 4-7/8 6. 2 of of
Percolation rate = 5 . 9 minutes per inch.
CERT.#00627
PERCOLATION TEST DATA SHEET
Percolation test readings made by S—P Testing, Inc. on 4-13-94 starting ar 9 : 10
!dare/
Test hole location Lot 16 ,B 1 k.1,D ickey sit ole number 4 ,Date hole was prepared 4-12-94
Depth of hole bottom 12 inches,Diameter of hole 6 inches
Soil data from test hole:
Depth,inches Soil texture
0 — 10" Topsoil dark brown loam
10" — 12" Brown clay loam
Method of scratching sidewall Knife
2
Depth of gravel in bottom of hole inches
4-12-94 4: 00pm 12
Date and hour of initial water filling ,Depth of initial water filling inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
6
Maximum water depth above hole bottom during test inches
Time Percolation
':ime interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
8 : 55 prefill 6
9 : 10 9 :40 of2-3/4 21. 8 30 min
9 : 41 10 : 11 of If
" It
"
10 : 32 11 : 02 " " It
it to
Percolation rate = 21. 8 minutes per inch.
CE$T.,W627
PERCOLATION TEST DATA SHEET
S—P Testing, Inc. 4-13-94 9 : 09 a.m. `
Percolation test readings made by on starting at p.m.
(dare)
Test hole location Lot 16 ,B 1 k.1,Dl ekey site Hole number 5 , Date hole was prepared 4-12-94
Depth of hole bottom 12 inches,Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 — 6" Topsoil dark brown loam
6" — 12" Brown clay loam
Method of scratching sidewall Knife
2
Depth of gravel in bottom of hole inches
Date and hour of initial water filling 4-12-94 Dept o initial water filling 12 inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
6
Maximum water depth above hole bottom during test inches
Time Percolation
ime interval, Measurement, Drop in water rate, Remarks
minutes inches level, inches minutes per
inch
8 : 55 prefill 6
9 : 09 9 : 39 if4-1/16 7. 5 30 min
9 : 42 10 : 12 If
4-1/16 7.5 if to
10 : 33 11 : 03 3-15/16 7. 6 "
Percolation rate = 7. 5 minutes per inch.
CERT.#00627
PERCOLATION TEST DATA SHEET
Inc. : a.m.
Percolation test readings made by S—P Testing, on 4-13-94 9 08 starting at p.m.
Lotl6,B1k.1,Dickey site 6 fdatef 4-12-94
Test hole location ,Hole number ,Date hole was prepared
Depth of hole bottom 12 inches,Diameter of hole 6 inches
Soil data from test hole:
Depth,inches Soil texture
0 — 12" Topsoil dark brown loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
4-12-94 4 : 00pm 12
Date and hour of initial water filling ,Depth of initial water filling inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
Maximum water depth above hole bottom during test 6 inches
Time Percolation
.i ime interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
8: 55 prefill 6
9 : 08 9 : 38 113-1/16 9 .8 30 min
9 : 43 10 : 13 of3 10.0 11if
10 : 34 11 : 04 3 10.0 "
Percolation rate = 9 . 9 minutes per inch.
DATE Q� TIME
CITY OF ORONO CALLED IN C����—/n
INSPECTION SCHEDULED
PERMIT NO. COMPLETEn h
ADDRESS
OWNER C TR. I GO
TELEPHONE NO. —�--
DESCRIPTION ,/Llrl�C S
4 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
CO03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEELC.MALUL 21 COMPLAINT
v 07 DEMO-FINAL 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBIN 11� 36 FOUNDATION/REMOVAL
OWNER/ NTR TOR TO MEET YOU:_YES_NO
COMMENTS:
0
cc
0
t
W
cc
luQ
Z
W
W
d
w/_wC
RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
QZ CORRECT WORK&PROCEED SSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION \ TEMPORARY
0 BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR
❑CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
OwnedContract
Inspector.
White Copyllnspector's File Canary Copy/Site Notice
PATE TIME
CITY OF ORONO CALLED IN 7/oZ 596
INSPECTION NOTIC SCHEDULED
PERMIT N0. 7�D 9 COMPLETED
ADDRESS _`5
OWNER c, C NTR.
TELEPHONE NO.
DESCRIPTION
01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
2
05 FINAL 14 SEWER HOOK-UO 06 PROGRESS
~ 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT
tQ 07 DEMO—FINAL 15 SEPTIC INST 22 FOLLOW-UP
2 09 PLUMBING RI SEPTIC FINAL 35 HARD COVER REMOVAL
10 PLUMBING FINAL 36 FOUNDATION REMOVAL
Q OWNER/CONTRACTOR TO MEET Y20: YES N
o
COMMENTS: + _ a CCU
fn
O
le
O
cc
O
LL
W
cc
Q
f2
Z
W
Z
W
cc
O
W /
f�'WORK SATISFACTORY:PROCEED PROJECT COMPLETE
ac
W LlCORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
Owner/Contracto ite
Inspector.
White Copy/Inspector's File Canary Copy/Site Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. 'Z 7 O q COMPLETED -�
ADDRESS ;Z57 y
OWNER CONTR.
TELEPHONE NO.
DESCRIPTION
01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
IQ 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/NIETLANDS
p 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL SD. 12 WATER HOOK-UP 17 SITE INSPECTION
05 FINAL 14 SEWER HOOK-UO 06 PROGRESS
07 DEMO-SITE 21 COMPLAINT
W 07 DEMO-FINAL i 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION REMOVAL
Z OWNERMONTAAC'TOR TO MEET YOU: N
y COMMENTS:
O.
O
cc
O
W
W
0;
Q
12
2
W
W
Dr
d
W/7
$WORK SATISFACTORY:PROCEED E,PROJECT COMPLETE
cc
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
OwnedContra s
Inspector.
White CopyAngmtoes File Canary Copy/SIN Notice
l/
�y DATE / TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED i T
PERMIT NO. !2 20 9' COMPLETED �p
ADDRESS 2,5_90
OWNER !unci c�«G'-Y► CONTR.
TELEPHONE NO.
DESCRIPTION
LQ 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q
= 05 FINAL 14 SEWER HOOK-UO 06 PROGRESS
~ 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT
Q 07 DEMO—FINAL 15 SEPTIQ INSTALL. 22 FOLLOW-UP
W
2 09 PLUMBING RI SEPTIC FlN 35 HARD COVER REMOVAL
-J 10 PLUMBING FINAL 36 FOUNDATION REMOVAL
Z OWNER/CONTRACTOR TO MEET YOU: _NO
L COMMENTS:
cc
W —
CL ef.Xy
Cr
O
W
Cr
Q
Z
W
W
j
LU ❑WORK SATISFACTORY:PROCEED ,,r-/PROJECT COMPLETE
CC ❑CORRECT WORK 8 PROCEED C: ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
Owner/Contract9go sit
Inspector. _
White Copynnspsctoes File Canary Copy/Site Notice