Loading...
HomeMy WebLinkAbout1996-008155 - new septic f PERMIT y CITY OF ORONO PERMIT TYPE: 2750 Kelley Parkway- P.O. Box 66 WATER Permit Number: Crystal Bay, Minnesota 55323 (612)473-7357 Date Issued: 07/17/96 SITE ADDRESS: 485 THOROUGHBRED LA CH P. I . N. < 04-117-23-11-0019 DESCRIPTION: NEW SEPTIC Sewer 2a Water Permit Type NEW SEPTIC `3YSTE Sewer & Water Work Type RESIDENCE REMARKS: FEE SUMMARY: Base Fee $100 .00 Surcharge ----------I K Total Fee $11:0. 50 CONTRACTOR: - Applicant - OWNER: CLOVER HILL COMPANY INC: 57 37155 E I DEN TONY BOX 2262485 THOROUGHBRED LA SHAKOPEE MN S5379 ORONO MN 55366 (61 2) 723-7155 THE 11NDERSZGt ? HEREBY REQUESTS PERM�ISSI � MA �� 5 SPECIFIED ,,AND 'AGREES TO file ALL WORK IPS STRI ��#� � �`W�"�F AI��. ORONO ORDTNANC:ES AND STATE BF� MINNESOTA SCITL.'DIW tow4w L APPLICANT/PERMITEE SIGNATURE ISSUED BY:SIGNATURE �l CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION Box 66 (2750 Kelley Parkway) Crystal Bay, MIN 55323 JOE SITE ADDRESS: Occupancy Type: Residential Commercial Other Permit Type: New or Replacement System, $100.00 Repair Existing System, $ 50.00 (Tanks or Drainfield) 0.50 State surcharge added to above fees *See fee schedule for non-residential permit fees Owner's Name: C,, 6— ," Phone Number: Mailing Address: City: Zip: Contractor's Name: C vv��r v c- PhoneNumber: 723- 71 ss_ City: I Mailing Address: U 13 7 5 y DO NOT MAIL PAYMENT WITH THIS APPLICATION GENERAL INSTRUCTIONS 1. m permits may be mailed or submitted in person at the City Applications for septic syste mailed out. The permit must be picked up in Offices; however, permits will not be person at the City Offices and work must not begin unless the permit card is on the job site. 2. Permits will be issued only to contractors holding a City of Orono Septic System Installers License. 3. All work must be done in accordance with the approved septic system design. Design reports are not considered approved unless accompanied by the "City of Orono Septic System Approval" cover sheet signed by the City Inspector. 4. The following inspections will be required for all septic systems: A. Pre-installation site inspection to include inspector, installer, and general contractor. B. Tank installation prior to covering. C. Drainfield trench installation prior to covering. For mounds, inspection is required after rough-up but prior to sand placement (sand will be jar tested for silt content), and again during pressure distribution piping installation in the rock bed. D. Final inspection to verify proper final cover depths and to verify that all pump station (where required) components are functional and comply with codes. 5. Individual holding MPCA Installer Certificate shall be present during inspections: A 24- hour notice is required for all inspections. NOTE: Applicant must initial all spaces. Fill in all appropriate blanks, check all appropriate boxes. 1. I have received a copy of the system design including the City of Orono Septic System Approval Cover Sheet. 2. I will be installing the following: A. Tanks: X Precast Concrete _ Other Manufacturer ire Sfi Tank Capacities: 1) i ) gal. 2) t 3� gal. 3) / 3� gal. B. Pump Station (if required) Pump make & model -'M s (attach pump curve & literature); system design requires 3 9 gpm at i 3 feet of head. High water alarm make & model ��r����.��� Outside electrical work to be completed by installer k electrician other Inside electrical work must be completed by electrician. C. Treatment System: Trenches: s.f. x Mound Depth of rock below pipe Rock bed dimensions J 'x Drop Boxes Sand bed dimensions Distribution Box Pressure Dist. Pipe Diam. 1, s Maniford Pipe Diam. 2- D. Final Cover/Topsoil to be: borrowed from site (show location on site plan) trucked in The undersigned hereby applies to the City of Orono for issuance of a septic system installation permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. Signature ofApplicant: J �� r� �` `" Date: 7 " 17 MPCA Certification No.: Staff Review: Approv Denial Reviewer: Date: ' Reason for Denial: CITY OF ORONO v e SEP-I'1:C SYSTEM APPROVAL 'ITT of ORONO O .N 0 `v+ Mwilcilml Offices - Post Ofnce Box(4 C;ry stat Bay,Miwiesota 55323-OW t9 E1�Sj 140 LOCATION: 2485 Thoroughbred Ln. OWNER: Tony Eiden GENERAL CONTRACTOR: Tony Eiden SEPTIC CONTRACTOR: Clover Hill Co. SITE EVALUATOR: S-P Testing REPORT DATE: May 12, 1994 The City of Orono has Approved your on-site system design as of September 14, 1995 (approved-disapproved) (date) with the following comments: THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is enclosed. NOTICE TO INSTALLLRS: Any changes to the approved plans and specs must have prior approval of the Inspector (4.73-7357). Call for inspections 24 hours in advance. ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain in place until final site grading. Approval to pour footings will not be granted until the Inspections Department has verified that primary and alternate sites are adequately protected. NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' of tested drainfield sites either before or after system construction. Compaction of these areas could render them unusable prohibiting the timely completion and or limiting the long term use of the property. A site copy will be available at the City Offices for the septic contractor. CITY OF ORONO By Stephena roan, On-site Systems Manager 'r[LEM LONE--473-7357• FAX-473-0510 i I S–P.TgSTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 951 Katydid Lane NE • St. Michael, MN 55376 • 612 497-3566 Y ( ) May 12, 1994 Tandem Properties Lot 9 , Block 2 Dickey Site Orono, Henn. Co. , MN This On-Site Sewage Treatment System is Designed for a Type 1, five bedroom home Designed in accordance with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances . The soils on this site are SCS soils mapped - LrB - Lester loam. A seasonally high water table was located at 18" to 38" , (mottled soil ) . Due to the seasonally high water table, a Pressurized Mound System will need to be installed. The bottom of the rock bed must be located at least 3 ' above the seasonally high water table. The soils at a depth of 12" have a percolation rate averaging 11. 1 min/inch. A pumping chamber will need to be installed to lift the effluent to the treatment area. The manifold and supply line pipe must have back drainage to the pumping chamber. The distribution pipes shall have their ends capped. Be sure the rock and sand fill material are clean. The sod layer below the entire mounded area must be turned over, just break up the sod, be sure not to over work. The power supply and switches must be located outside the manhole and pumping chamber in a weather proof enclosure. A warning device must be installed with a light and sound device, this is in case of a pump failure. (mercury floats are a good method) . All neighboring wells are located greater than 100 ' away from the proposed treatment area. CONT' D i Lot9,Blk. 2 Dickey Site I i (2) Keep all heavy equipment off of the proposed treatment area before and after construction. The treatment area should be marked off before construction. This Design is not valid & the system will need to be relocated if failure to protect the areas proposed for On-Site Sewage Treatment occurs. I With proper installation and maintenance, this system should have no problem in treating septic effluent effectively. Nothing other than gray water, (laundry, showers, etc. ) human waste & toilet tissue should be disposed of into the septic tanks. Garbage disposals are not recommended. Smaller amounts of laundry soaps , dish soaps , cleaning agents, etc. are better for the system. Antibacterial soaps & chlorine agents may kill the bacteria needed to treat septic effluent properly. Additives are not recommended, they may cause harmful damage to your system. Recommend to pump & clean your tanks by a certified pumper every year if you have 1 tank & every 2 years if you have 2 tanks to insure proper maintenance. I I I I Steven B. ­Schirf�ies----- SBS/ds I I i �I i liLD/N�i oT PL Rte, a 3 47 � �r. �' r DATE PEffmi-F . i + r APPRO•': V AS SUBMITI EO APPROVED WITH CORRECTIONS AS NO Eta � -� -� "" `• NOT APPROVED — CORRECT & RESUB I iT .>V ~ \ \ a these comments are cr your information All work sheli +be 0,98 W fail compliancE vitt. �. iwPticabip. tv*hr's & zon' aver « TsrGfrD4�G �la'�"<<G`� GO•?a`s'�'R+-t L"5103•� �.�.� ^� MS tW \ x + 1Atai6[e�r►ents irb:!Jd��r �tc�r•; not sPp^ffica3`y noted �n i� y o>y.3 cd 'KEEP •THIS t-UV^NJ' '--%f TI J SI( . AT ALL :'I ! 3.� io,So lbi h 1 \ \ I \�' + '51 + I -95'- ��o�G°I ion.y l0►9.0 � � 1 M + 10.1a 0 Percolation Tests Scale= �7 ' XSoil Borings �3 _ \I 0 Bench Mork A ►kms k '«YAKS ¢ Note= This system is to be constructed to meet ,\ i the Minnesota Pollution Control Agency R1T1[�tr►b ------ -- ��NRr� Sz Chapter 7080 & Local Ordinance 4- o/ t � CD Check all underground utilities asst Toes.o PROPERTY OF: \L � �-0 ) LOLL 01v-0 t..t b �I 4-F�1�\ L�0 S—P TESTING �ft�� Designed By- - Date:.�/L21-IY, P-4. 62 -497-3566 I O� --------- --- F90)06- : 15 S !l Sip — ----- � 3.o i �F".F. sA►.!v � SET- BACKS HOUSE System must be: Tonk 2,d from property lines L� 1ST from wel!s 7-0 from b!dgs. r��• Treatment oreo _'from lakes streams t�� A WA��-°`�T ,- '— NOTE:Power supply and switches must be located in a A Treatment area 1& from property lines µ 11-\ 'CW*_ \-V MA P Rom S +r-» ►T" �,from wells weather proof enclosure outside the pumping chamber and manhole -0 1F6+rP-CA*NYb [iAGCFr�L ZO from bldgs. t- -, J-D from trees ySOIL BORING ELEVATIONS �Qmin. THAI EL.- ' 3°da.su grade..%TK'2 EL.-IDl7.y Tank I' � Tank. PRESSURE DISTRIBUTION MOUND SYSTEM TH A3 EL.-.L►.;z'•o Drop to Tonk_ U TH;'4 EL-,�3z Min. C to 8' Pumping TH 7 5 EL.- La 3 Mox.l"io4' t=� P '�t�la`G.�.� SHA`t_oc�J ChamberELEVATION of PROPOSED PUMPING 4��to 6��dia.pipe CHAMBER-IQ{-q&LVID) TQ 4Y 'v 10)". I LX_-to3o.o1 SYSTEM DESIGN -MOUND TYPE-S, Ji- BEDROOM , Average percolation rate 1) min./inch (design.83sq.ft treatment area per got. of daily sewage flow) I./d x.83s .ft/gal. s .ft.of treatment area +10% =LL -�sq.ft. (= IOft.width=�ft.length of bed area+side slope run�to I x 3_Z height= _ft.x9�_ft.lawn area needed) ga ay q g sq .ft. rock needed- ('.4 sq.ft.treatment area x1,09" depth of rock=01 e�'.cu.ft=27=31_cv.yds.(3/4'to 21/x'dia. ,includes 2�'of rock above pipe) i Clean sand fill below rock needed 1'XD_cu yds. approx. , sandy loam bock fill�_cu.yds.approx., topsoil 6"�cu.yd. W�st�v (t=�Go�•'l'MEND 'to AVO ao°7o 'Co -�'oPSo\�.FoE- {R-FtG�LAQ- Si.o4�.�-� ----L�`o.�SoCA�.� Number of tanks required-m-L-, Ist tonkL4SQ.gol. ,2nd tank 2o0D gal.minimums F-os Pt-►m Pi NQ- Pumping chamber capacity- 25% of doily sewage flow ofObO-gal.=.L`e_gal.+reserve storage of 150•-x1/BF�:.'_&!L gal.+pipe bockdrainagePROPERTY OF: 5rm-,- , of 14 gal./IOO lin.ft.of Z ".dia.supply Pipe, Iin.ft needed 2�, 11-gal.+manifold gal./IOO IirLft of_2_"dia.pipe,ln.ftneeded-OL ,_7 _gol. 1{O-� °� zl"be-- '01, - total capacity needed ` ` -gal.(plus area for pump) usE min. J;t.5�0 gq 1.ce p. -d0 Distribution pipe !a�dia. ,Lcj!S�_lin.ft, 1229:dia. perforations 3Ja"aport Pump size •rte hp. (pumpable capacity 10y gol.4cycles/day) ����__1 _►�EAo s� o�5c1�1}3�U�._ ��`_ i $_P l'E"S]'/l1/G Note When constructing bed this area should be shaped Note= Distance- from treatment area to neighboring we"s- Designed B •`�� 'r`— to divert run-off from entering treatment oreo. -- %� Inn, g y Oc'e <_/!�/A=� , PH. 612-497-3566 MOUND DESIGN WORKSHEET (For Flows up to 1200 gpd) A. FLOW Estimated Sewage Flow in Gallons per Day(gpd) Estimated 7 SD gpd xt o Type r type lr type in Type ry or measured x 1.5 = - gpd. Bedrooms 2 300 225 180 hoz 3 450 300 218 of B. SEPTIC TANK LIQUID VOLUMES 4 600 375 256the 5 750 450 lcoD gallons 6 900 525 332 0th. 7 1050 600 370 8 1 1200 1 675 408 C. SOILS (refer to site evaluation) r _ C 3 Number sN� I� of [,y.a G-&,Ip 1. Depth to restricting layer= a4"- Zq inches stems 2. Depth of percolation tests = j-inches (PLW.•' (PU-) 3. Percolation rate 1 1 . ! mpi 23 r less ,705000 1.1125 I 4. Land slope 3 % 5 or 6 1000 2.000 I 7 or 8 2,000 3.000 over 9 See fig.C-6 (z 1.5) D. ROCK LAYER DIMENSIONS I 1. Multiply flow rate by 0.83 to obtain required area of rock layer:A x 0.83 = �_gpd x 0.83 sq. ft./gpd = b�sq. ft-�i t*, -�qNa 2. Select width of rock layer (10 feet or less) _ 10 ft. 3. Length of rock layer=area_width = Rock Bed t,,K L4_sq. ft. ft. t, ft. 1•ti•ti•tiK•�•ti•ti•�♦•ti•�•�•�•ti•S•� � !•r•!•!•!•!•r•r•r•!•r•!•!•r•!•r tiidth 510 ft. S•ti•S•ti• •ti•ti•ti•tiK•V•t•ti•ti•ti•ti•ti 1.1•tiK•ti•ti•ti•ti•ti•�•ti•ti•ti•Nti•ti•ti E. ROCK VOLUME �- Length j 1. Multiply rock area by rock depth to get cubic feet of rock; sq.ft. x ft. =0j.-IL cu. ft. 2. Divide cu. ft.by 27 cu. ft./cu. yd. to get cubic yards; �)I t' cu.ft. i 27=-;0 cu. yd. j .3. Multiply cubic yards by 1.4 to get weight of rock in tons; cu. yd. x 1.4 ton/cu. yd. = a tons. i i F. ADSORPTION WIDTH G L01:1*1 on Width Sirs Table 1. Percolation rate in top 12 inches of soil is 11, Percolationi d y R& °t mpi Rase Gtitinutes per;,,., Soil Texturepa.�,:r 1O`f`` (mpi) t- ab-"M i 2 Select allowable soil loading rate from table; Faster than 0.1 Coarse Sand 1.20 1.00 0.1 to 5 Sand 120 1.00 • 4 S gpd/ft2 0.1 toy Fine Sand- 0.60 2.00 6 to 15 Sandy Loam 0.79 1S2 16 to 30 Loam 0.60 2.00 3. Calculate adsorption width ratio by dividing rock layer 31 to 45 Silt Loam 0.50 2.40 loading rate of 1.20 gpd/ft2 by allowable soil loading rate; clay_ oam .4 2.67 61 t0120 Gay 4 5.00 1.20 gpd/ft2?- '14 �' gpd/fF= ;Z-1,? Slower than 120 Clav - - ••Soil loving 509E or more of faw or very fine sand 4. Multiply adsorption width ratio by rock layer width to get required adsorption width; 0 x_j ft ft i I _ I G. 'DOWNSLOPE DIKE WIDTH 1. If landslope is 3% or more,subtract rock layer width from adsorption width to obtain minimum downslope dike toe 2-L" ft-eft= _feet 2. Calculate Minimum mound size based on geometery: a. Determine depth of clean sand fill at upslope edge of rock layer: Separation ). d feet b. Multiply rock layer width by landslope ' '°dt c°".r. to determine drop in elevation; t feet Re ed Slope Difference Separation feet l x Z %-1-100= feet Slope Difference at UpsloDe Width c. Add depth of clean sand for separation (2a) J1-feet Rock Bed Width at upslope edge,depth of rock layer(1 foot) to depth of ID feet Downslope Width cover (1 foot) to find the mound height at the upslope edge -4L feet of rock layer; /.e) ft+ 1ft + Ift= 3.0 feet d. Enter table with landslope and upslope dike ratio. Select dike multiplier of 3 -5,n e. Multiply dike multiplier by upslope mound height to find upslope dike width: 3.0 x_3,v..o =_LL feet f. Add depth of dean sand for slope difference (2b) at downslope edge,to the mound height at the upslope edge of rock layer(20 to find the downslope height; -7.o ft+._ft= 3.3 feet I g. Enter table with landslope and downslope dike ratio. Select dike multiplier of 4:S L/ h. Multiply dike multiplier by downslope mound height to get downslope dike width: 3.3 x 4.94 feet i. Compare the values of step G.1 and Step G.2h Select the greater of the two values as the downslope dike width; feetODS-JJ� ae 1. Total mound width is the sum of ► i loan upslope dike (G.2e)width plus rock IV,(t,4 Width layer width (D.2)plus a Uosloo.Midt� UDt1Ge.wldtq downslope dike width(G.2i); 3 t' "°` teat I o E i _ft+ I0 ft+ ft feet k. Total mound length is the sum of Cuw f e to upslope dike width (G.2e)plus rock layer 1 length (D.3)plus upslope dike width (G.2e); _)ft+eft+ 1I ft= feet f I q + L� + - /off e� + Total Lengtn•/0j;t � I Downslope Lpslope 3:1 l•1 5:1 6:1 7:1 3:1 4:1 5:1 6:1 7:1 8:1 I %slope 0 3.0 44 5.0 6.0 7.0 3.0 4.0 5.0 60 7.0 84 1 349 4.17 526 638 7M 2.91 3.85 4.76 5.66 654 7.41 2 3.19 135 556 6.82 8.14 28.1 456 536 614 6.90 3 �3o r 388_ 732 8.86 2T Z. 4.35 5.08 5.79 6.45 4 3.41 4.76 615 -- bd` 3.45 4.17 4.86 5.46 6.06 5 353 5.00 6.67 857 10.77 261 3.33 4.00 4.62 5.19 51"1 6 396 516 7.14 938 12.07 254 3.23 3.85 4.41 4.93 5.41 7 390 556 7.69 I034 1373 248 3.12 3.70 423 L70 5.13 8 3.95 5.86 833 1154 1591 242 3.01 3.57 4.05 4.69 498 9 4.11 625 949 13.04 18.92 236 294 3.4.5 3.90 430 4b5 10 429 667 10.0 15.00 2333 231 286 333 3.75 4.12 4.44 11 4.48 7.14 11.11 17.65 30.43 226 278 323 3.61 3.95 426 12 4.69 7.69 1250 211A3 4375 221 211,0 3.12 3.49 3.80 4.06 • F-17 PUMP SELECTION PROCEDURE END PERFORATION OF A PERFORATED LATERAL A. Determine pump capacity: I C.-e C-- Gravity Distribution K T"-U 1. Minimum suggested is 600 gallons r hour(10 m)to stay ahead of _ }� gt� g l� ,. OC y d GaeNnIN FaMlc<or water use use rate. Nie LO0"'► °Ior.. wort ng g•eo Yn papr)Mr arse•w.e ' 2. Maximum suggested for delivery to a drop box of a home system is 2,700 Perlere�an mows H-a 1.11Y Inb cao H- T" gallons per hour(45 gpm)to prevent build-up of pressure in drop box. R«: Ike sea. :.. W PerfarelN-Lasted at Pressure Distibution view sat"Late, a." .t LAMM 3.a. Select number of perforated laterals b. Select perforation spacing= _feet. �Pk So4 L.'W C. Sub'tra�2 ft.from the rock layer length. -2 ft.=• (g Lg feet. d. Determine the number of spaces between perforations. Length perf.spacing= !�1 ft.+ ft.= 22 spaces Required Perforation Discharge e. spaces+1= a perforations/lateral in gallons Per minute(gpmj f. Multiply perforations lateral by number of laterals to 7/ Z" D e Z�� 34' �� get totallumber of orations. >,taala x I? =1�perfo a ons. (feet) g. x SPmi Ped c2�-gpm. 1.0a <6 0.74 SELECTED PUMP CAPACITY 3!�-gpm 2.Ob 0.80 1.04 B.Determine head requirements- a.Use for single family homes 1. Elevation difference between pump and point of discharge. b.Use for all other applications U feet 2. If pumping to a pressure distribution system,five feet for pressure required at manifold if gravity s stem,zero. feet 3. Friction loss a. Enter friction loss table with gpm and pipe diameter. Pipe Length Read friction loss in feet per 100 feet from table. Point of Discharge F.L.= a,to ft./100 ft of pipe TTtDi b. Determine total pipe length from pump to discharge Elevation Difference) point. Add 25 percent to pipe length for fitting PUMP loss,or use a fitting loss chart. Equivalent pipe length-1.25 times pipe length= F-18b I -r_x 1.25= f)j -feet 1-5 inch 2.0 inch 3.0 inch c. Calculate total friction loss by multiplying Urn Bitot lau ptr loo n of Pipe friction loss in ft/100 ft by equivalent pipe length. 10 0.69 0.20 Total friction loss= ), (., x'_+100= Z feet 12 0.96 0.28 4. Total head required is the sum of elevation difference, 14 1.28 0.38 special head requirements,and total friction loss. 16 1.63 0.48 18 2.03 0.60 20 2.47 0.73 0.11 + _+ 25 3.73 1.11 0.16 (1) (2) (3c) 30 5.23 1.55 0.23 35 7.90 2.06 0.30 40 11.07 2.64 0.39 TOTAL HEAD feet 45 14.73 3.28 0.48 50 3.99 0.58 55 4.76 0.70 G Pump selection 60 5.60 0.82 i 1. A pump must be selected to deliver at least J 3c) (Step A)with at least 13 feet of total head(Step B). i L-13 CERTIUIGA'1'I,5i� ;! 00627 1�c js of Soil Borin(j5 Location or Project Lot 9 , Block 2, Dickey Site, Orono Borings made by S-P Testing, Inc. Steve Schirmers Date 4-19-94 Classifiction System: AASHO USDA-SCS X Unified Other Auger used (check two) : Hand X or Power Flight or Bucket X Depth, Boring number 1 Depth, Boring number 2 in in feet Surface elevation 1015. 0 feet Surface elevation 1017.4 _____­7 Topsoil dark brown Topsoil dark brown loam loam 10 - 112" 0 - 1 . 4.1 1 - Dark114" - 1 , 811 broyoamla Brown clay loam 2 - Brown clay loam 2 - 1 ' 2" - 2 ' 211-MOTTLED 2' if Rusty olive brown clay loam 3 - 118" - 3 ' 211-MOTTLED 3 2" 3 - 212" - 314" Rusty olive brown clay Rusty olive gray silty 312" - 311011 loam 3 ' 4" - 3 ' 10" clay loam ) 4 - Rusty olive gray silty loa 4 _ 3110" - 4 ' 4" Rusty olive gray Rusty olive gray silty silty loam 414" - 51 loam 3110" - 5 ' 5 - 5 - 6 - 6 - 7 - 7 - II 8 - 8 - i ) I � End of boring at 51 feet. End of boring at 51 feet. Standing water table: Standing water table: present at feet of depth, present at feet of depth, hours after boring . hours after boring. Not pres=ent in hole X Not present in ho'-2 x i Mottled soil : Mottled soil : Observed at 312" feet of depth. Observed at 2 ' 2" feet of depth. Not present in hole Not present in hole Comments : Comments : _ I CE'i�'> Location or Project Lot 9 , Block 2, Dickey Site, Orono Borings made by S-P Testing, Inc . Steve Schirmers Date 4-19-94 Classifiction System: AASHO USDA-SCS X Unified Other Auger used (check two) : Iiand X or Power Flight or Bucket X Depth, Boring number 3 Depth, Boring number_ 41 in in feet Surface elevation 1015. 0 feet Surface elevation 10 3 . 2 0 - --- — — 0 Topsoil dark brown lam Topsoil dark brown 0 - 8" loam 1 - 1 - Brown clay loam 0 - 1-1/2 ' 8" - 1-1/2 '-MOTTL D 1-1/2 ' Brown clay loam 2 - 1-1/2 ' - 2 ' -MOTTLED 2 ' 2 _ Rusty olive brown Rusty olive brown clay loam loam 2 ' - 21811 O 3 Rusty olive gray 3 silty clay loam Rusty gray sandy lloam to loamy sand w/71" 4 - 2 ' 8" _ 4 ' 4 _ layer of silty ]loam Rusty gray silty loam 5 - 4 ' 51 5 - 3 ' 5 ' 6 - 6 - i 7 - 7 - 8 - 8 - I End of boring at 5 feet. End of boring at 5 feet. I Standing water table : Standing water table: present at feet of depth, present at feet of depth, hours after boring . hours after boringi- Not present in hole_ __ X Not present in hole X Mottled soil : Mottled soil : Observed at 1-1/2 ' feet of depth. Observed at 2 ' feet of depth. Not present in hole Not present in hole Comments : Comments : i _ I C],RT� .'1'C,1TI01 ;t 00627 Location or Project Lot 9 , Block 2, Dickey Site, Orono Borings made by S-P -esting, Inc . Steve Schirmers Date 4-19-94 Classifiction System: AASHO USDA-SCS X Unified Other Auger used (check two) : IIand X or Power Flight or Bucket X Depth , Boring number 5 Depth, Boring number 6 in in feet Surface elevation 1024 . 3 feet Surface elevation 1023 . 0 0 - --- — — 0 Topsoil dark brown Topsoil dark brown loam 0 - 10" loam 0 - 1 ' 1 - 1 - Brown clay loam Brown sandy clay loam l ' - 21 -MOTTLED 2 ' 10" - 1 ' 10"-MOTTLED 111011 2 - Rusty 21 - 2 ' 4" soanXe crioaw 2 Rusty olive brown clay loam 3 - Rusty olive brown 3 - 1110" - 314" sandy loam 214" - 4 ' Rusty olive gray 4 - 4 - silty loam Rusty olive gray clay loam 4 ' - 5 ' 314" - 5 ' 6 - 6 - i 7 - 7 - I I 8 - 8 - !� End of boring at 51 feet. End of boring at 51 feet. ' Standing water table: Standing water table : present at feet of depth , present at feet of depth, hours after boring . hours after boring. Not present in hole X Not present in hole X Mottled soil : Mottled soil : Observed at 2 ' feet of depth. Observed at 1110" feet of depth. Not present in hole Not present in hole Comments : Comments : i CERT. #00627 PERCOLATION TEST DATA SHEET Percolation test readings made h\ S—F Testing, Inc. on 4-20-94 tartin cit 12 : 51 a.m. ., I Lot9 ,B1k. 2,Dickey Site 1 4-19-94 Test hole location . Hole number Date hole%N as prepared Depth of hole bottom 12 inches. Diameter of hole 6 inches i Soil data from test hole: Depth. inches Soil texture i 0 - 12 Topsoil dark brown loam i i i i i Method of scratching sidewall Kn i f P Depth of gravel in bottom of hole 2 inches 4-19-94 1 : 30pm 12 Date and hour of initial water filling . Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon 6 Maximum eater depth above hole bottom during test inches Time Percolation ,-tme Interval. !Measurement. Drop to eater rate. Rcmarl.si minutes i inches level. inches minutes per ' inch I 12 : 30 prefill 6 12 . 51 1: 21 2-1/4 13 . 3 30 min 1 : 24 1: 54 2-1/8 14 . 1 I " 2: 06 2: 36 j 2-1/ 8 14. 1 " t i I i I i I I i i I Percolaiion rate = 13 . 8 minutes per inch. II CERT.#00627 PERCOLATION TEST DATA SHEET ii a.m_ Percolation test readin=s made by S—P Testing, Inc. on 4-20-94 starting ar 12: 49 m �, Test hole location Lot 9 ,B 1 k. 2,Dickey Site Hole number 2 4-19-94 Date hole xk as prepared Depth of hole botton-L 12 inches. Diameter of hole 6 inches I Soil data from test hole: Depth, inches Soil texture I 0 - 12" Topsoil dark brown loam i I I Method of scratching sidewall KNife Depth of gravel in bottom of hole 2 inches 4-19-94 �1: 30pfm. 12 Date and hour of initial water filling epth o initial water fillinO inches above hole bottom Method used to maintain at least 12 inches of eater depth in hole for at least 4 hours Automatic siphon 6 Maximum Hater depth above hole bottom during test inches Percolation Time it ime interval. :tea>urement. Drop in water rate. Remarks minutes I inches level. inches minutes per inch 12 : 30 prefill 6 12: 49 1: 19 3-1/2 8. 6 30 min 1: 26 1: 56 ; 3-1/4 9 . 2 " 2: 07 2: 37 I i 3-1/8 9. 6 " i I � 9 Percolation rate = ' 1 minutes per inch. _ i CERT. r00627 i PERCOLATION TEST DATA SHEET I S-P Testing, Inc. 4-20-94 12 : 53 `'.m. Pcrco:aci n test readings made b\ on starum,a p.m. Lot9,B1k. 2 ,Dickey Site 3 J""' 4-19— i Test hole location . Hole number Date hole xx as prepared i Depth of hole bottom 12 inches. Diameter of hole 6 inches j I Soil data from test hole: Depth, inches Soil texture i 0 - 12" Topsoil dark brown loam i I I l Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 4-19-94 12: 30pm 12 Date and hour of initial water fillimc . Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon Maximum%\aterdepth above hole bottom durinL,test 6 inches Time Percolation "ime interval. Measurement. Drop in water rate. Remarks minutes inches level. inches minutes per inch 12 : 30 prefill 6 12 : 53 1: 23 3 10 .0 30 min 1 : 28 1: 58 2-7/8 10 . 4 2: 08 I 2: 38 2-3/4 10.9 " I I I i i I i I I Percolation rate = 10. 4 minutes per inch. II CERT.#00627 PERCOLATION TEST DATA SHEET I S-P Testing, Inc. 4-20-94 12: 47 a.m. Percolation test readings made b-% on starting at �p.m. ^; ,e„. `-- Test hole location Lot9 ,B lk. 2,Dickey SiteHole number 4 Date hole was prepared 4-19-9 4 Depth of hole bottom 12 inches. Diameter of hole 6 inches Soil data from test hole: i Depth. inches Soil texture I 0 - 8” Topsoil dark brown loam 8" - 12" Brown clay loam I i I i Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 4-19-94 1: 30pm 12 Date and hour of initial a ater fillin�L Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon Maximum w ater depth above hole bottom during test 6 inches Time Percolation ime interval. Measurement. Drop in water rate. Remarks minutes inches level. inches minutes per inch 12 : 30 prefill 6 12 : 47 1: 17 It2-3/4 10 .9 30 miry 1 : 30 2: 00 i 2 : 09 2: 39 " Percolation rate = 10 -9 minutes per inch. CERT.#00627 PERCOLATION TEST DATA SHEET I S-P Testing, Inc. 4-20-94 12: 45 'x: Percolation tc,t readings made by on starting at p.m. } Lot9 ,B1k. 2,Dicke Site 5 4-19 Test hole location �' . Hole number . Date hole was prepared 12 6 Depth of hole bottom inches. Diameter of hole inches Soil data from test hole: I Depth,inches Soil texture I 0 - 12" Topsoil dark brown loam I I I Method of scratching side.+•all Knife I I Depth of gravel in bottom of hole 2 inches 4-19-94 1 : 30pm 12 Date and hour of initial water filling . Depth of initial water filling_ inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon Maxim6um %pater depth above hole bottom during test inch .1 Time Percolation II ,\imc interval. Measurement. Drop in water rate. Remarks minutes inches level. inches minutes per inch 12: 30 prefill 6 i I 12: 45 1: 15 4 7. 5 30 min 1: 32 2: 02 3-7/8 7. 7 " 2 : 10 2: 40 i 3-3/4 8.0 " i i I i Percolation rate = 7. 7 minutes per inch. II CERT.#00627 PERCOLATION TEST DATA SHEET I S-P Testing, Inc. 4-20-94 12 : 43 a.m. Percolation test readinLs made by on startimL,at p.n Lot9 ,B1k. 2,Dickey Site 6 ' 4-19- Test hole location Hole number Date hole was prepared 12 6 Depth of hole bottom inches. Diameter of hole inches Soil data from test hole: i Depth.inches Soil texture 0 - 10" Topsoil dark brown loam j 10" - 12" Brown clay loam I Method of scratching sidewall Knife I Depth of gravel in bottom of hole 2 inches 4-19-94 1:30pm 12 Date and hour of initial water filling . Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon r Maximum water depth above hole bottom during test 6 inched; Time Percolation ime interval. Measurement. Drop in water rate. Remarks minutes inches level. inches minutes per inch 12: 30 prefill 6 12: 43 ! 1: 13 2-1/8 14. 1 30 min 1 : 34 2: 04 j 2 15. 0 " 2: 11 2: 41 " 2 15. 0 " i i i i i j I Percolation rate = 14 . 7 minutes per inch. DTE �T E CITY OF ORONO CALLED IN INSPECTION NOTIl�E SCHEDULED PERMIT NO. MPLETED ADDRESS OWNER CO TR. • TELEPHONE NO. DESCRIPTION 01 FOOTING 11 MECHANICAL RI 18IXCAV/GRADINGIFIWNG h . 02 FRAMING13 MECHANICAL FINAL 19 LAKESHORFJWETLANDS O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL 2 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UO 08 PROGRESS v 07 DEMO—SITE 27 SE 21 COMPLAINT W 07 DEMO—FINAL 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 38 FOUNDATION REMOVAL 2 OWN RET _ O «� COMMENTS: CUL cc 0 LL W 0; Q 12 2 W W 0` 4j W 4elWORK SATISFACTORY:PROCEED 17,PROJECT COMPLETE cc ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY Ci BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the n xt i ion 24 hours in advance.473-7357 OwnedContractor Inspector. White CopyAnspectoes File Canary Copy/Sib Notice DATE MME O CITY OF ORONO CALLED IN INSPECTION N TICE SCHEDULED O PERMIT NO. COMPLET ADDRESS Ll OWNER CONTR. TELEPHONE NO. DESCRIPTION 01 FOOTING 11 ME6WkNICAL RI 1 18 EXCAV/GRADING/FIWNG IQ 02 FRAMING 13 MECHANICAL FINAL19 WKESHORE/WETLANDS Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION 05 FINAL 14 SEWER HOOK-W 06 PROGRESS 07 DEMO–SITE 27 SEPTI 21 COMPLAINT 07 DEMO—FINAL I 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL36 FOUNDATION REMOVAL Z OWN T 0 MEET Y _NO y COMMENTS: o; 0 0 a a; 0 LL W cc Q i W W ORK SATISFACTORY.PROCEED 7-- PROJECT COMPLETE W Ct ❑CORRECT WORK&PROCEED G ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT O CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 OwnedContractor Inspecto4�82 2 0&F�m K r—w-L a Pq wl,il.Copynnspeclor's File Canary CopylSMe Notice D TE 7-!L� CITY OF ORONO CALLED IN INSPECTION NOTfE SCHEDULED PERMIT NO. COMPLETE ADDRESS OWNER CONTR. d. TELEPHONE NO. DESCRIPTION IL 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FIWNG H 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL SO. 12 WATER HOOK-UP 17 SITE INSPECTION 05 FINAL 14 SEWER HOOK-UO 06 PROGRESS � 07 DEMO-SITE 27 SEPTIC MNNT. 21 COMPLAINT 07 DEMO--FINAL 15 SEPTIC INIVILL 22 FOLLOW-UP = 09 PLUMBING RI C Fl 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION REMOVAL oWNER/CONTRACTOR To EET YOU: _NO y COMMENTS: yke--\ let" a 7z�Tw7k AQ j o y cc 0 W cc Q 12 W W cc O W ❑WORK SATISFACTORY:PROCEED ROJECT COMPLETE cc W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contract Inspector. WMN CopyMnspsclaft File Canary CWy1SRs No11p