Loading...
HomeMy WebLinkAbout1997-009024 - new septic system PERMIT CITY OF ORONO PERMIT TYPE: 2750 Kelley Parkway- P.O. Box 66 Permit Number: E W,---R ii WA i F R Crystal Bay, Minnesota 55323 i j��'=�t.x.�'>>� (612) 473-7357 Date Issued: _. _ _ _ SITE ADDRESS: 21'x•:==' Tt;i�i�;'i�iiij�j ,`E } l_ DESCRIPTION: :{ Water Pei-ri1t Type ,rye W. SEP T.LC '__Y!_�' REMARKS: FEE SUMMARY: Base Fee .:'i r c ICI •'-.'.F CONTRACTOR: t.:::, 1. 1;_ .z E - OWNER: i�r`':Y:_i_t:•-'t-,}"_ }'`'1�,� r �- - �..'''._, - �`i I i�"i..� �•r i,i �C r _ f I ` THE UND R816NED HEREBY F`£QV .`w TS PER I-S ,CIN T�a MAKE THE R&L, TMP."RIDVEMENT SPECIFIED ANO AGREES TO € O ALL WORK I N .QTR I CT compLIAWCE4 WITH. ALL J"J T ' OF L O #FOC nPl)T NANCFS ANO STATE 1�I", €NESS ITA t I L INC t�ODE REQIV I REMENM J APPLICANT/PERMITEE SIGNATURE ISSUED BY:SIGNATURE CITY OF ORONO SEPTIC SYSTEM PERIMIT APPLICATION Box 66 (2750 Kelley Parkway) Crystal Bay, MIN 55323 JOB SITE ADDRESS: 3 0 _T�Oroos� 41_C4 Occupancy Type: Residential Commercial Other Permit Type: New or Replacement System, $100.00 _ Repair Existing System, $ 50.00 (Tanks or Drainfield) 0.50 State surcharge added to above fees ' See fee schedule for non-residential permit fees Owner's Name: apt eve �`f- S Phone Number: Mailing Address: City: Zip: Contractor's Name: GIyuLTC7 �L� Phone Number: 72-3- 215 Mailing Address: PO &a,- City: Z.or—e- zip: DO NOT MAIL PAYMENT WITH THIS APPLICATION GENERAL INSTRUCTIONS 1. Applications for septic system permits may be mailed or submitted in person at the City Offices; however, permits will not be mailed out. The permit must be picked up in person at the City Offices and work must not begin unless the permit card is on the job site. 2. Permits will be issued only to contractors holding a City of Orono Septic System Installers License. 3. All work must be done in accordance with the approved septic system design. Design reports are not considered approved unless accompanied by the "City of Orono Septic System Approval" cover sheet signed by the City Inspector. 4. The following inspections will be required for all septic systems: A. Pre-installation site inspection to include inspector, installer, and general contractor. B. Tank installation prior to covering. C. Drainfield trench installation prior to covering. For mounds, inspection is required after rough-up but prior to sand placement (sand will be jar tested for silt content), and again during pressure distribution piping installation in the rock bed. D. Final inspection to verify proper final cover depths and to verify that all pump station (where required) components are functional and comply with codes. 5. Individual holding MPCA Installer Certificate shall be present during inspections: A 24- hour notice is required for all inspections. "X NOTE: Applicant must initial all spaces. Fill in all appropriate blanks, check all appropriate boxes. 1. I have received a copy of the system design including the City of Orono Septic System Approval Cover Sheet. 2. I will be installing the following: A. Tanks: �&_ Precast Concrete _ Other Manufacturer Tank Capacities: 1) 13cO gal. 2) 1-3W gal. 3) 13 LAD gal. B. Pump Station (if required) Pump make & model A6 kD (attach pump curve & literature); system design requires 32 gpm at feet of head. High water alarm make & modelOutside electrical work to be completed by installer electrician other Inside electrical work must be completed by electrician. C. Treatment System: Trenches: s.f. Y, Mound Depth of rock below pipe Rock bed dimensions rU 'x ' Drop Boxes Sand bed dimensions loo 'x Y2' Distribution Box Pressure Dist. Pipe Diam. '�/i- Maniford Pipe Diam. 2— D. D. Final Cover/Topsoil to be: borrowed from site (show location on site plan) trucked in The undersigned hereby applies to the City of Orono for issuance of a septic system installation permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. Signature ofApplicant: Date: -� 3 J—C' MPCA Certification No.: O Staff Review: Approv4 X, Denial Reviewer: Date: --� Reason for Denial: S–PVESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 Ll^%I qW) f May 11, 1994 Tandem Properties Lot 19 , Block 2 Dickey Site Orono, Henn. Co. , MN This On-Site Sewage Treatment System is Designed for a Type 1, five bedroom home Designed in accordance with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances . The soils on this site are SCS soils mapped - LrB - lester loam. A seasonally high water table was located at 12" to 18" , (mottled soil ) . Due to the seasonally high water table, a Pressurized Mound System will need to be installed. The bottom of the rock bed must be located at least 3 ' above the seasonally high water table. The soils at a depth of 12" have a. percolation rate averaging 8 . 5 min/inch. A pumping chamber will need to be installed to lift the effluent to the treatment area. :The manifold and supply line pipe must have back drainage to the pumping chamber. The distribution pipes shall have their ends capped. Be sure the rock and sand fill material are clean. The sod layer below the entire mounded area must be turned over, just break up the sod, be sure not to over work. The power supply and switches must be located outside the manhole and pumping chamber in a weather proof enclosure. A warning device must be installed with a light and sound device, this is in case of a pump failure. (mercury floats are a good method) . All neighboring wells are located greater than 100 ' away from the proposed treatment area. CONT ' D Lot 19 , Block 2 Dickey Site (2) Keep all heavy equipment off of the proposed treatment area before and after construction. The treatment area should be marked off before construction. This Design is not valid & the system will need to be relocated if failure to protect the areas proposed for On-Site Sewage Treatment occurs. With proper installation and maintenance, this system should have no problem in treating septic effluent effectively. Nothing other than gray water, (laundry, showers , etc. ) human waste & toilet tissue should be disposed of into the septic tanks . Garbage disposals are not recommended. Smaller amounts of laundry soaps , dish soaps , cleaning agents, etc. are better for the system. Antibacterial soaps & chlorine agents may kill the bacteria needed to treat septic effluent properly. Additives are not recommended, they may cause harmful damage to your system. Recommend to pump & clean your tanks by a certified pumper every year if you have 1 tank & every 2 years if you have 2 tanks to insure proper maintenance. . Steven B. Schirm SBS/ds u 2v Y3 9 yS 9. i i n � IWa. ll '11x1�L 1U�o.l N V—A V K a8 � LDS tr /M.-Ir AY—EA- Iz / /` fl S1D1J '. / lox), / � � {-�S b V` O(� JJJ��� r ,�• / 1011.1 1 f + 0 x 50 V-\.z V--t!0-y— Lam/I� \��•' O � � 3� � � � ' 1 6 Peornon Tests Scale:1 5D XSoil Borings 0 Bench. Mork wet LnuD Note: This system is to be cons'ructed to meet Ott 1 the Minnesota Pollution Con!rol Agency �. Chapter 7080 & Local Ordinance ,o N 0 L Check all underground utilities 33.11 PRC°ERTY OF: S-P TEST/NI MC. L/ Oesi;ned By-- �7.!�& :t Co!e:S-/Lz/W, PH.6:2 -497-3566 1 _ N o x b4S Ro B �J 4:tSs S ` )00 �r•` , �oP of SRNo � \` — `L�1 Ft�-L 1035,'_ ' V\2k A) SET- BACKS / i. /o' HOUSE I System must be: Tank 2d from property linesSju- lo'1J�!R SIA\- Lj o-tAA _ 2'Z from welts ZU from b.dgs. 1G S�-A� ate. t s L0W�R�- ���� Treatment area from lakes, _streams -�MA--t jo-a4-o R %-►•� t?N Treatment area � from property lines NOTE Power supply and switches must be located in a '(a� 4-_ s- MA•NHo�S ��» ��." 7 ' i weather proof enclosure outside the pumping chamber and manhole r3AcrFu� � from we Is � Q 'fA3�l�S s1+a��ow ::from bldgs. t--� J-0 from treesl til SOIL BORING ELEVATIONS 17- �Omin. ' l TK I EL.-/oo's.1 � (o-taa o.9 "da.suI i �D rade- /o TH."2 EL:.- j=-4 Tank � _ Tank. g TH. 3 EL- o32cY _Drop to Tank PRESSURE DISTRIBUTION MOUND SYSTEM Min. I"to8' � Pumping TH75 EL- oa AW Max,h"to 4' _Y__� Chamber ELEVATION at PROPOSED PUMPING -4710 6"dia,pipe (,t-Ow CHAMBER- 9.26 �� , �►wtp�ot9.D SYSTEM DESIGN -MOUND rAgv Lp f)Q_ O��>�L�/O AH TYPE-;2='L, .5- BEDROOM , Average percolation rate 2LL min./inch (design.83 sq.ft treatment area per gal,of daily sewage flow) gal./day z.83sq.ft/gal.1p-aa sq.ft.of treatment area +10% sq.ft. (= 10ft.width= /A ft.length of bed area+side slope run oto I x4.0 heigh!=_92? ft.x/oo' ft.town-area needed) aeon rock needed- 4-44 sq.ft.treatment area xZ o197' depth of rock--fir 1 q'cu.ft=27=32cu.yds.(3/4'to 21/x'dia. ,includes.2�'of nock above pipe) Clean sand fill below rock needed 20 0 cu.yds. approx. , sandy loom back fill ;K'9 cu.yds.approx., topsoil 6" ) V cu.yd. gvE. cv�stt v (�EGo�'ltr^�c1JD -'CO Woo 1067o -Co '['oPSct�.FoE- tt:K�st,,JLAR S�,o4���_ G�Yv..�ofAL Number of tanks required-a&-, Ist tonkLlQgol. ,2nd Conk o D gal.minimums fw s p"yn P,N R Am 15 a 9.- Pumping chamber capacity- 25% of doily sewage flow of'_1�2_gal.=J_'t5(_gal.+reserve storage of 15 0 j-a Z/B1;r-.2&,2 gal.+pipe bock drainage- + �� PROPERTY OF: of IV gal./IOOlin.ft.ofd dia. supply pipe, lin.ft.needed A6 , I I gol.+manifold gal./100linft of�.."dia.pipe,lin.ft needed ,-M.-gal. total capacity needed�J-gal.(plus area for pump) uSE min. �O g1,ca ���L� AD2 Distribution Ipiipe 22:dia. , lin.ft,21_32�dio. perforations�la7apart Pump size r+` hp. (pumpable capacityQlgal. 4cycles/day) o-�Se1clA �_ � 1 i P TEST/NG N . Note: When constructing bed .7 , this area should be shaped Note= Distance- from treatment area to neighboring ml!s- Designed 9 63•�L r'- to divert run-off from entering treatment area. g y ' PH. 612-497-3566 MOUND DESIGN WORKSHEET (For Flows up to 1200 gpd) A. FLOW Estimated Sewage flow in Gallons per Day(gpd) Estimated O gpd Number Tylie or measured x 1.5 = - gpd. Bedrooms I Type II Type III Type IV 2 300 225 l80 boa, 3 450 300 218 of the B. SEPTIC TANK LIQUID VOLUMES 4 600 375 2% . 5 750 450 294 I-) ,Sy 4 1-1000 gallons 6 900 525 332 dw 7 1050 600 370 °dw col� 8 1 1200 1 675 1 408 C. SOILS(refer to site evaluation) NumberST; s 1. Depth to restricting layer = ](I inches sea° Of C.P.,,Y 2. Depth of percolation tests inches `Pu-4 `"am'' 3. Percolation rate 4s.S- mpi 23 al4 17050 1.'12 4: Land slope - % 7 or s 2000 30000 over 9 See fig.C-6 (11-5) D. ROCK LAYER DIMENSIONS 1. Multiply flow rate by 0.83 to obtain required area of rock layer:A x 0.83 = 7 Sb gpd x 0.83 sq. ft./gpd sq. ft-v 1012o=lo" 2. Select width of rock layer(10 feet or less) _ >0 ft. 3. Length of rock layer=area_width = Rock Bed (o_l6�sq. ft._ )D _ft. = (,<I ft. ti.ti•ti.ti•ti.ti•1•ti•��•�•1.ti•ti•ti•ti•ti !•r•!•!•!•!... . .!•!•!•r•r.!. . idth 510 ft. ti•ti•ti•ti•ti•ti•ti•ti• ti•ti•L•1•ti•ti•ti•ti ~!~!~!1!t 1~!�l~!~!�!•t f~J•!1~ E. ROCK VOLUME l- Length i 1. Multiply rock area by rock depth to get cubic feet of rock; (may sq.ft. x i.dS ft. =,7)q cu.ft. 2. Divide cu.ft.by 27 cu. ft./cu. yd. to get cubic yards; 0)41 cu. ft. _27=_1)cu. yd. 3. Multiply cubic yards by 1.4 to get weight of rock in tons; a r) cu.yd. x 1.4 ton/cu. yd. _ tons. F. ADSORPTION WIDTH wA`v-) Absorptionw,achsian Tab,e Gua,• It-41 1. Percolation rate in top 12 inches of soil is mpi e o>��Raw Soil Texts �f,� d W 2. Select allowable soil loading rate from table; Faster than 0.1 Coarse Sand 120 1.00 0.1 to S Sand 120 1.00 'Li!� gpd/f t2 0.1 to S Fine Sand- 0.60 2.00 6 to 15 Sandv Loam 0.79 1.52 3. Calculate adsorption width ratio b dividing rock laver 16 to 3o Loam 0.60 2.00 rp }' g 31 to 45 Silt Loam 0.50 2.40 loading rate of 1.20 gpd/ft2 by allowable soil loading rate; 46 to 60 Clav Loam 0.45 2.67 61 t0120 flay 024 5.00 1.20 gpd/ft2�- .Ligpd/ft2= a.u Slower than 120 Clav - - ••Soil having 3D%or more of fine or very fine sand 4. Multiply adsorption width ratio by rock layer width to get required adsorption width; ,Z_ .6-7 x_ 0 eft G. DOWNSLOPE DIKE WIDTH 1. If landslope is 2.9 % or less adsorption width inculdes both upslope and downslope widths 2. Calculate Minimum mound size bsaed on geometery: a. Determine depth of clean sand fill at upslope edge of rock layer: Separation ';.D feet b. Multiply rock layer width by landslope r feet t:over to determine drop in elevation; = 1 foot Ro ee Slope Difference Seperetloo feet I x -- %1100 = feet Slop• Dlfterenee -" � UDs1oDe Width c. Add depth of dean sand for separation (2a) -«feet Rock Bed Width atupslope edge,depth of rock layer (1 foot) to �feet Downslope Width depth of cover(1 foot) to find the mound height at the feet upslope edge of rock layer; 'a.0 ft+ 1ft+ 1ft= L�- _feet d. Enter table with landslope and upslope dike ratio. Select dike multiplier of L4 e. Multiply dike multiplier by upslope mound height to find upslope dike width: _x __ I L feet f. Add depth of dean sand for slope difference(2b)at downslope edge, to the mound height at the upslope edge of rock layer(20 to find the downslope height; -- ---feet g. Enter table with landslope and downslope dike ratio. Select dike multiplier of h. Multiply dike multiplier by downslope mound height to get downslope dike width: ---x- = feet i. Minimum mound width is the sum of upslope dike width plus rock layer width plus downslope dike width; ft+ ft + ft= feet Upslope Nlolh j. Subtract the minimum width (21) from the red adsorption area (F.4) to find the additional Rotk Dee WIOtn downslope area for adsorption - feet � I upslope W10tn UDs10pe 1{'loln _.f f_n_=-ft----__.___ feet 3 -Lf?feet 11�L feet k. Add the additional width (2.j ) to the `� `l downsolpe width and recalculate f Downslope width the total width )ift+)pft + tft= 4 Z feet 1. Total mound length is the sum of upslope dike width plus rock layer length 1 _ Plus upslope dike width: Total Len gth /Ie ft+1,<eft+ ),�,_ft = ov feet owns ope Lpslope 3:1 4:1 5:1 6:1 7:1 3:1 4:1 5:1 6:1 7.1 8:1 A siopr 0 3.0 4.0 5.0 6.0 7.0 3.0 4.0 5.0 6.0 7.0 8.0 I 3A9 4.17 516 6.36 7.53 291 3.95 4.76 5.66 654 7AI 2 3.19 435 556 6.82 8.14 283 3.70 454 536 6.14 6.90 3 330 454 5.88 7.32 8.86 275 35, 435 5.06 5.79 6.45 4 3AI 4.76 625 7.89 9.72 2.68 3.45 4.17 4.84 5.46 6.06 5 353 5.00 667 857 107 261 333 4.00 4.62 5.19 sm 6 366 5.26 7.14 938 1207 254 313 3.85 4.41 4.93 SAI 3b0 556 7.69 1033 1373 248 3.12 3.70 423 4.70 5.13 8 3.95 5.88 633 1154 15.91 232 3.03 3.57 4.05 4.49 4.88 9 4.11 625 9.09 13A4 1&92 236 294 3.45 3.90 430 4.65 10 429 6.67 10.0 15.00 2333 2.31 286 333 3.75 4.12 4A4 11 4A8 7.14 11.11 1765 30.43 2.26 278 323 3.61 3.95 426 12 469 7.69 1250 21.43 43.75 2.21 2.7c 3.12 3.49 3.80 4.08 i I F-17 I I PUMP SELECTION PROCEDURE END PERFORATION OF A PERFORATED LATERAL A. Determine pump capacity: C.--C Gravity Distribution reo.w, 1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of _ �O�f al C-fm N FoWic(w ft- water - water use rate. `WIC'Sam LOW -YI()1'°'-""°'"" ` " '.. 2. Maximum suggested for delivery to a drop box of a home system is 2,700 ��^����Hw mWfy into Coo N w To gallons per hour(45 gpm)to prevent build-up of pressure in drop box. �,,•P„" L.,., ,2•,0 „- FW._ of RI LI cpw Pressure Distibution Coven 5eM u>* 8.1 Berw «.w�N Le1-1 �� we� - 3.a. Select number of perforated laterals1 b. Select perforation spacing= _feet. `0"0 nal$eo s"1N0 60w Pk o 4 S&W Low C. Subtratc�2 ft.from the rock layer length. -2 ft._. U to feet. d. Determine the number of spaces between perforations. Length perf.spacing= ft.+ ft._ :Z Q, spaces Required Perforation Discharge e. ? spaces+1=�3 perforations/lateral ,n gallons per minute(gpm) f. Multiply perforations per lateral by number of laterals to �Smper e Ah� t total number of perforations._,,S .. x �PulL. _ _perforations. (Ease) %ii m ,° g_ x P'`_ �� 1.0a 0.56 0.74 SELECTED PUMP CAPACITY 20 gpm 2.Ob 0.80 1.04 B.Determine head requirements: a.Use for single family homes 1. Elevation difference betweenpump and point of discharge. b.Use for all other applications �_feet 2. If pumping to a pressure distribution system,five feet for pressure required at manifold if gravity item,zero. _feet 3. Friction loss a. Enter friction loss table with gpm and pipe diameter. Pipe Length Read friction loss in feet per 100 feet from table. Point of Dischar-ge F.L._ ';?. (n ft./100 ft of pipe /cDy b. Determine total pipe length from pump to discharge Elevation Difference point. Add 25 percent to pipe length for fitting Pum P 0 loss,or use a fitting loss chart. Equivalent pipe length-1.25 times pipe length= F-18b �0 0 -x 1.25= 0.5_ feet 1.5 inch 2.0 inch 3.0 inch c. Calculate total friction loss by multiplying 9PM Friaim IM W 1008 of Pipe friction loss in ft/100 ft by equivalent pipe length. Total friction loss= Z.(o x ').�� +100- feet 10 0.69 0.20 -�- '12 0.96 0.28 4. Total head required is the sum of elevation difference, 14 1.28 0.38 special head requirements,and total friction loss. 16 1.63 0.48 18 2.03 0.60 20 2.47 0.73 0.11 25 3.73 1.11 0.16 (1) (2) (30 30 5.23 1.55 0.23 35 7.90 2.06 0.30 40 11.07 2.64 0.39 TOTAL HEAD _feet 45 14.73 3.28 0.48 50 3.99 0.58 55 4.76 0.70 C. Pump selection 60 5.60 0.82 1. A pump must be selected to deliver at least 3_gpm (Step A)with at least 19 feet of total head(Step B). i �I CERTIFIC,1TI014 .! 00621 1,�:, of Soil 130 in s Location or Project Lot 19 , Block 2, Dickey Site, Orono Borings made by S-P Testing, Inc . Steve Schirmers Date 4-11-94 Classifiction System: AASHO USDA-SCS X ; Unified Other Auger used (check two) : hand X or Powe--_, Flight or Bucket X Depth, Boring number 1 Depth, Boring number 2 in in feet Surface elevation 1020 . 7 feet Surface elevation 1021. 8 0 - -- ---- 0 - - - - Topsoil dark brown loam Topsoil dark brown 0 - 8" 0 - 10" loam 1 _ Brown clay loam 1 _ Brown clay loam 8" - 1 ' 411-MOTTLED 114" 10" - 1 ' 411-MOTTLED 114" Rusty olive brown 2 - sandy clay loam 2 - Rusty olive brown clay loam 114" - 2110" 3 - 114" _ 3 ' 3 - Rusty olive8��brown loam Rusty olive brown _ Rusty olive gray silty _ loam loam 4 3 ' 8" - 4 ' 4" 4 Rusty olive gray loam 414 5 ' 2110" - 5 ' 5 6 - 6 - 7 - 7 - II I ! 8 - 6 - End of boring at 51 feet. End of boring at 5 ' feet. Standing water table : Standing water table : present at 413" feet of depth, present at 4 ' 71' feet of depth, 18 hours after boring . 18 hours after boring. Not present in hole Not present in hole Mottled soil : Mottled soil : Observed at 1 ' 4" feet of depth. Observed at 1 ' 4" feet of depth. Not present in hole Not present in hole Comments : Comments : i L-13 CERTIUlCi1TION 4 00627 hogs of Soil II"o: iris Location or Project Lot 19 , Block 2, Dickey Site, Orono Borings made by S-P Testing, Inc. Steve Schirmers Date 4-11-94 Classifiction System: AASHO USDA-SCS X Unified Other Auger used (check two) : hand X or Power Flight or Bucket X Depth, Boring number 3 Depth, Boring number 4 in in feet Surface elevation 1020.9 feet Surface elevation 1023 .1 Topsoil dark brown loam Topsoil dark brown loam 0 - 8" 0 - 8" Brown clay loam Brown clay loam 1 - 1 - 8" - 1 ' 4"-MOTTLED 1' 4% 8" - 1-1/2 ' -MOTTLED 1-1/ ' Rusty olive brown clay 2 - 2 - 114" - 212 IT loam Rusty olive brown clay loam Rusty olive brown 3 - 1-1/2 ' - 3 ' 4" 3 - sandy loam _ Rusty olive brown _ 2 ' 2" - 3 ' 10" 4 loam 4 Rusty olive gray sandy loam i 5 - 31411 _ 5 ' 5 - 311011 51 6 - 6 - 7 - 7 - I 8 - 8 - End of boring at 51 feet. End of boring at 5 ' feet. Standing water table: Standing water table : present at feet of depth, present at 311oll feet of depth, hours after boring . 18 hours after boring. Not present in hole X Not present in hole Mottled soil : Mottled soil : Observed at 1-1/2 ' Observed at 11411 feet of depth. feet of depth. Not present in hole Not present in hole Comments : Comments : L-13 CEIRTIFIC:: 'IG.:' - 00621 Legs of Soil isorit :� Location or Project Lot _19 , Block 2, Dickey Site, Orono Borings made by S-P Testing, Inc . Steve Schirmers Date 4-11-94 Classifiction System: AASHO USDA-SCS X Unified Other Auger used (check two) : Iland X or Power Flight or Bucket X Depth, Boring number 5 Depth, Boring number 6 in in feet Surface elevation 1023. 4 feet Surface elevation 1022. 9 0 Topsoil dark brown loam 0 _ Topsoil ar am-._.- � 0 - 6" 0 - 6" Brown clay loam Brown clay loam 1 - 1 - 611 l'-MOTTLED 1 6" - 1-1/2 ' -MOTTLED 1 2 ' Rusty olive brown 2 _ Rusty olive brown 2 _ clay loam clay loam 1 ' - 214" 1-1/2 ' - 2 ' 8" 3 - 3 _ Rusty olive brown Rusty olive brown loam loam 4 - 4 _ 5 - 2 ' 8" 5 ' S - 2 ' 4" - 5 ' 6 - 6 _ 7 - 7 _ l 8 - 8 - I End of boring at 5 ' feet. End of boring at 51 feet. Standing water table : Standing water table: Present at 4 ' 2" feet of depth , present at 318" feet of depth, 18 hours after boring . 18 hours after boring. Not present it hole Not present in hole Mottled soil : Mottled soil : Observed at 1-1 2 'feet of depth. Observed at it feet of depth. Not present in hole Not present in hole Comments : Comments : CERT. 100627 PERCOLATION TEST DATA SHEET Percolation test readings made by S—P Testing, Inc. on 4-12-94 starting at 8 ' 59 C"F►err a Lot19 ,B1k.2,Dickey Site 14-11-94 Test hole location Hole number Date hole was prepared Depth of hole bottom 12 inches.Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture 0 - 8" Topsoil dark brown loam 8" - 12" Brown clay loam Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 4-11-94 3 : 00ppm12 Date and hour of initial water filling .Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon 6 Maximum water depth above hole bottom during test inches Time Percolation ime interval, Measurement, Drop in water rate, Remarks minutes inches level, inches minutes per inch 8: 40 prefill 6 8 : 59 9 : 29 5-1/8 5 . 9 30 min 9 : 40 10 : 10 4-3/4 6. 3 " 10 :23 10 : 53 4-1/2 6. 7 " I Percolation rate = 6. 3 minutes per inch. CERT.#00627 PERCOLATION TEST DATA SHEET ' Percolation test readings made by S—P Testing, Inc. on 4-12-94 starting at 9 : 00 < p.m. (dare) Test hole location Lot 19 ,B1k. 2,Dickey Site Hole number 24-11-94 Date hole was prepared 4-11-9 4 Depth of hole bottom 12 inches,Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture 0 - 10" Topsoil dark brown loam 1011 12" Brown clay loam Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 4-11-94 3 : OOpm 12 Date and hour of initial water filling Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon Maximum water depth above hole bottom during test 6 inches Time Percolation ime interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch 8 : 40 prefill 6 9 : 00 9: 30 3-1/16 9 . 8 30 min 9 : 39 10 : 09 2-7/8 10 . 4 " 10 : 24 10 : 54 2-11/16 11. 2 " Percolation rate = 10 . 5 minutes per inch. CEVT.#00627 PERCOLATION TEST DATA SHEET S-P Testing, Inc. 4-12-94 9 : 01 a.m. Percolation test readings made by on starting at Lotl9 ,B1k. 2,Dickey Site 3 darn' 4-11-94 Test hole location Hole number ,Date hole was prepared Depth of hole bottom 12 inches,Diameter of hole------6—inches Soil data from test hole: I Depth,inches Soil texture 0 - 8" Topsoil dark brown loam 8" - 12" Brown clay loam I Method of scratching sidewall Knife 2 Depth of gravel in bottom of hole inches pp Date and hour of initial water filling 4-11-94 3epth ofinitial water filling 12 inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon 6 Maximum water depth above hole bottom during test inches Time Percolation ime interval, Measurement. Drop in water rate, Remarks minutes inches level,inches minutes per inch 8: 40 prefill 6 9 : 01 9 : 31 of4-3/16 7. 2 30 min 9: 38 10 : 08 it4 7. 5 it " 10 : 25 10 : 55 3-7/8 7. 7 i Percolation rate = 7. 5 minutes per inch. III�I CERT.#00627 PERCOLATION TEST DATA SHEET S—P Testing, Inc. 4-12-94 9 : 02 a.m. Percolation test readings made b), on starting ar p. Lot19 ,B1k. 2,Dickey Site 4 `�� 4-11-94 Test hole location ,Hole number , Date hole was prepared i Depth of hole bottom 12 inches,Diameter of hole 6 inches Soil data from test hole: Depth,inches Soil texture 0 — 8" Topsoil dark brown loam 8" — 12" Brown clay loam I� i Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 4-11-94 3 : OOpm 12 Date and hour of initial water filling Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon Maximum water depth above hole bottom during test 6 inches Time Percolation .i ime interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch 8 : 40 prefill 6 9 : 02 9 : 32 it3-7/16 8. 7 30 min 9 : 37 10 :07 of3-1/4 9 . 2 of " 10 : 26 10 : 56 3 10.0 " i Percolation rate = 9 . 3 minutes per inch. CEP,T,.100627 PERCOLATION TEST DATA SHEET S-P Testing, Inc. 4-12-94 9 : 03 a.m. Percolation test readings made by on starting at Lot19 ,B1k. 2,Dickey Site 5 Baa"' 4-11-94 Test hole location , Hole number ,Date hole was prepared Depth of hole bottom 12 Diameter of hole 6—inches, inches Soil data from test hole: Depth,inches Soil texture �I 0 - 6" Topsoil dark brown loam 6" - 12" Brown clay loam 1 Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 4-11-94 3 :OOpm 12 Date and hour of initial water filling Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon Maximum water depth above hole bottom during test 6 inches Time Percolation ime interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch 8 : 40 prefill 6 9 : 03 9: 33 it4-1/8 7. 3 30 min 9 : 36 10 : 06 3-13/16 7. 9 it " 10 : 57 11 : 27 3-3/4 8.0 I i� Percolation rate = 7• 7 minutes per inch. I CERT.#00627 PERCOLATION TEST DATA SHEET S—P Testing, Inc. 4-12-94 9 : 04 CiD Percolation test readings made by on starting ar p.m. (dare) Test hole location Lot 19 ,B 1 k. 2,Dickey Site 6 Date hole was prepared 4-11-94 ole number , Depth of hole bottom 12 inches,Diameter of hole 6 inches Soil data from test hole: Depth,inches Soil texture 0 — 6" Topsoil dark brown loam it 6 12" Brown clay loam i I Method of scratching sidewall KN1 f e 2 Depth of gravel in bottom of hole inches nn Date and hour of initial water filling 4-11-94 ,�epth Ffinitial water filling 12 inches above hole bottom honiti Automatic s Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Aup 6 Maximum water depth above hole bottom during test inches Time Percolation ime interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch 8 : 40 prefill 6 9 : 04 9; 34 3-1/4 9. 2 30 min 9 : 35 10 : 05 3 10. 0 " I 10 : 28 10 : 58 2-15/16 10. 2 " II i �I Percolation rate = 9 . 8 minutes per inch. i �I DATE TIME CITY OF ORONO CALLED IN (n 3o-f7 INSPECTION NOTICE / SCHEDULED PERMIT NO.$JT2 COMPLETED ADDRESS -�y3 yh&� 67 OWNER �c�GO-r� C CONTR. %� TELEPHONE NO. y7 DESCRIPTION 01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Q 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION = 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS ~ 07 DEMO—SITE 27 SEP 21 COMPLAINT v W 07 DEMO—FINAL 15;SEZPTICINSTALL., 22 FOLLOW-UP 2 09 PLUMBING RI 23 35 HARD COVER REMOVAL 10 PLUMBING FINAL 28 CEDAR SHINGLES 36 FOUNDATION RE OVAL Z OWNER/CONTRACTOR TO MEET YOU:_Y�S N COMMENTS: cc W cc o 4 Cr0 W ac Q z W z W Eci WORK SATISFACTORY:PROCEED PROJECT COMPLETE Cr OOOW W C CORRECT WORK&PROCEED : ISSUE CERTIFICATE OF OCCUPANCY C) ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN INSPECTOR WILL RETURN C STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-73557 Owner/Contract r Inspector. White CopylInspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED 041-8 PERMIT NO. 2/ 2'-- COMPLETED _ ADDRESS � .f3g ) 47 OWNER �et� CONTR. iZz.��i��� TELEPHONE NO. DESCRIPTIONLLJ �ZQ c Ji 01 FO TING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 02 FRAMING 5'7-9013 MECHANICAL FINAL 19 LAKESHOREIWETLANDS Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q = 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS J 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT W 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP n� 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 28 CEDAR SHINGLES 36 FOUNDATION REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS: W tat) C'/V'S Q. cc J O cc ac W t <1,PA+�NVVj t Ljj Q 6X UPyL W cc LAj ❑WORK SATISFACTORY:PROCEED PROJECT COMPLETE cc cc C7 ORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY OORRECT WORK,CALL FOR REINSPECTION TEMPORARY 0 BEFORE COVERING PERMANENT ❑ CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN INSPECTOR WILL RETURN El STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next ii ispection 24 hours in advance.473-7357 Owner/Co ntr o s Inspector. White Copy/inspector's File Canary Copy/Site Notice DATE TIME CITY NO CALLED IN INSPECTION NOME SCHEDULED PERMIT NO. COMPLETE ADDRESS lr� OWNER NTR. Q TELEPHONE NO. DESCRIPTION 01 FOOTING 11 MEC RI 18 EXCAWGRADING/FILLNG 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHOREJWETLANDS 03 INSULATION 24/25 WOOD SURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q = 05 FINAL 14 SEWER HOOK-UO 06 PROGRESS ~ 07 DEMO--SITE 27 SE INT. 21 COMPLAINT J W 07 DEMO—FINAL 22 FOLLOW-UP = 09 PLUMBING RI �J3�EP� 35 HARD COVER REMOVAL J 10 PLUMBING FINAL36 FOUNDATION REMOVAL Z OWNER/CONTRACTOR TO Y YES_NO 4 y COMMENTS: o; W a O O 0; O LL W ccQ Z W ' W cc VWWORK SATISFACTORY:PROCEED C PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY Q BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 OwnedContractor e: Inspector. L White CopyMapeetoes File Canary Copy/Site Notice D TIME CITY OF ORONO CALLED IN INSPECTION NOT SCHEDULED PERMIT NO.—4W� COMPLETED ADDRESS 6;zp3,0 d Cj OWNER CONTR. / TELEPHONE NO. /�-3" JS5 DESCRIPTION C.n 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING H 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHOREJWETLANDS O 03 INSULATION 24/25 WOOD BURNERIFIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q Z 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS ~ 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT J W 07 DEMO--FINAL PTIC INSTALL 22 FOLLOW-UP 2 09 PLUMBING RI 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 28 CEDAR SHINGLES 36 FOUND A ION REMOVAL Z OWNER/CONTRACTOR TO YOU: YE$�_ O COMMENTS: — i J �+ O 1' r cc O W cc Q 2 W Z W CC �CI ❑WORK SATISFACTORY:PROCEED - PROJECT COMPLETE W ElCORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractor Inspector. White Copylinspector's File Canary Copyisite Notice DATE TIME CITY OFNO CALLEDIN INSPECCTIONION NOTICE SCHEDULED PERMIT NO. Z`f COMPLETED ADDRESS or OWNER CONTR. TELEPHONE NO. DESCRIPTION 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING h 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHOREIWETLANDS 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q Z 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS J 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO—FINAL 15 SEPTIC I TALL. 22 FOLLOW-UP = 09 PLUMBING RI SEPTIC FINA 35 HARD COVER REMOVAL J 10 PLUMBING FINAL INGLES 36 FOUNDATION REMOVAL Z OWNER/CONTRACTOR TO Mfg YOU:?YES NO COMMENTS: '3-' l��'\ Ok- cc J CC O ' e 0 W cc Q 2 W Z W cc � f WORK SATISFACTORY:PROCEED /- PROJECT COMPLETE CC W ❑CORRECT WORK&PROCEED ••//= ISSUE CERTIFICATE OF OCCUPANCY O ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractorofi ' e: Inspector. White CopylInspector's File Canary Copy/Site Notice