HomeMy WebLinkAboutMCWD permits MINNEHAHA CREEK WATERSHED DISTRICT
QUALITY OF WATER QUALITY OF LIFE
Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements
and information contained in the permit application, correspondence, plans,
The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part
hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant
Watershed District is named below for use and development of land in the Minnehaha Creek
committed to a leadership Watershed District.
role in protecting,
Issued to: Dion and Tanya Buhman Permit No: 13-302
improving and managing
the surface waters and Location: 1560 Tanglewood Rd Orono
affitiated groundwater Purpose: Erosion Control Wetland Protection — Swimming Pool installation
resources within the Date of Issuance: 02/11/2014 Date of Expiration: 02/11/2015
District,including their
By Order of the Board of Managers
relationships to the
ecosystems of which Brandon Wisner
they are an integral part. District Technician
We achieve our mission This permit is not transferable without District approval, and is valid to the date of
through regulation, expiration. No activity is authorized beyond the expiration date. If the permittee
requires more time to complete the project, an application for renewal of the
capital projects, permit must be received by the District at least 30 days before expiration.
education,cooperative The applicant is responsible for compliance with all District Rules and for the
endeavors,and other action of their representatives, contractors, and employees.
Conditions: Project to be completed as described in plans submitted to the
programs based on MCWD office on February 11, 2014 according to the provisions of
this permit.
sound science, Specification of the methods, schedule and party responsible
innovative thinking,an for ensuring establishment and maintenance of the vegetation
for the three years following installation or construction. The
informed and engaged plan shall include the control of invasive species and
replacement of vegetation as necessary.
constituency,and the Properly install and maintain all required erosion control
cost effective use of measures until the disturbed areas are re-stabilized
• When the site is re-stabilized and the MCWD staff has
public funds. performed a final inspection, all silt fences must be removed
(Statement concerning fees for inspections, violations, etc... on following page)
15320 Minnetonka Boulevard, Minnetonka, MN 55345 9 Office: (952) 471-0590 0 Fax: (952)471-0682 9 www.minnehahacreek.org
i
I
Inspection/Analysis/Monitoring Fees
A site inspection and monitoring by District staff will be performed where the
activity involves:
• a commercial/industrial/multi-family residential development
• a single family residential development greater than 5 acres or of any size if
within the Minnehaha Creek subwatershed
• any alteration of a floodplain or wetland
• dredging within the beds, banks or shores of any protected water or wetland j
• a violation
• any project which in the judgment of the District staff should be inspected
due to project location, scope, or construction techniques
In these cases, the applicant shall pay to the District a fee equal to the actual
costs of field inspection of the work, including investigation of the area affected
by the work, analysis of the work, and any subsequent monitoring of the work,
which in the case of a violation shall be at least$35.
Standard Fee Schedule
District professional staff $ 65.51
District intems $ 40.35*
District clerical staff $ 46.69*
Consulting Senior Engineer $contracted rate
Consulting Engineer/Technician $contracted rate
District Counsel $contracted rate
Application fee $ 10.00
Copy costs $ .25 +actual staff time
Color copy costs $ 1.00 + actual staff time
i
*Hourly
i
i
{
MINNEHAHA CREEKWATERSHED DISTRICT
QUALITY OF WATER QUALITY OF LIFE
Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements
and information contained in the permit application, correspondence, plans,
The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part
hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant
Watershed District is named below for use and development of land in the Minnehaha Creek
committed to a leadership Watershed District.
role in protecting,
improving and managing Issued to: Dion &Tanya Buhman No: 14-332
the surface waters and Location: 1560 Tanglewood Rd Orono
affiliated groundwater Purpose: Erosion Control, Waterbody Crossing
resources within the Date of Issuance: 09/15/2014 Date of Expiration: 09/15/2015
District,including their
relationships to the By Order of the Board of Managers
ecosystems of which
Brandon Wisner
they are an integral part. District Technician
We achieve our mission This permit is not transferable without District approval, and is valid to the date of
through regulation, expiration. No activity is authorized beyond the expiration date. If the permittee
requires more time to complete the project, an application for renewal of the
capital projects, permit must be received by the District at least 30 days before expiration,
education,cooperative The applicant is responsible for compliance with all District Rules and for the
endeavors,and other action of their representatives, contractors, and employees.
programs based on Conditions: Project to be completed as described in plans submitted to the
sound silence, MCWD office on July 24, 2014 according to the provisions of this
permit.
innovative thinking,an 0 Properly install and maintain all required erosion control
measures until the disturbed areas are re-stabilized
informed and engaged . When the site is re-stabilized and the MCWD staff has
constituency,and the performed a final inspection, all silt fences must be removed
cost effective use of
public funds. (Statement concerning fees for inspections, violations, etc... on following page)
15320 Minnetonka Boulevard, Minnetonka, MN 55345.Office: (952)471-0590 9 Fax: (952)471-0682 9 www.minnehahacreek.org
MINNEHAHA CREEK WATERSHED DISTRICT
QUALITY OF WATER QUALITY OF LIFE
Insoection/Analysis/Monitoring Fees
The Minnehaha Creek A site inspection and monitoring by District staff will be performed where the
Watershed District is activity involves:
committed to a leadership • a commerciaVindustdai/multi-family residential development
• a single family residential development greater than 5 acres or of any size if
role in protecting, within the Minnehaha Creek subwatershed
improving and managing • any alteration of a floodplain or wetland
• dredging within the beds, banks or shores of any protected water or wetland
the surface waters and . a violation
• any project which in the judgment of the District staff should be inspected due
affiliated groundwater to project location, scope, or construction techniques
resources within the
District,including their In these cases, the applicant shall pay to the District a fee equal to the actual
relationships to the costs of field inspection of the work, including investigation of the area affected
by the work, analysis of the work, and any subsequent monitoring of the work,
ecosystems of which which in the case of a violation shall be at least$35.
they are an integral part.
We achieve our mission Standard Fee Schedule
through regulation,
District professional staff $ 65.51
capital projects, District interns $ 40.35*
education,cooperative District clerical staff $ 46.69*
Consulting Senior Engineer $contracted rate
endeavors,and other Consulting Engineer/Technician $ contracted rate
District Counsel $ contracted rate
programs based on Application fee $ 10.00
sound science, Copy costs $ .25+actual staff time
Color copy costs $ 1.00 +actual staff time
innovative thinking,an
informed and engaged
constituency,and the * Hourly
cost effective use of
public funds.
15320 Minnetonka Boulevard,Minnetonka,MN 55345 Office:(952)471-0590 9 Fax:(952)471402•www.minnehahacreek.org