Loading...
HomeMy WebLinkAbout1992-004546 - new septic system PERMIT CITY OF ORONO PERMIT TYPE: SEWER & 4.JATER. 1335 Brown Rd. South • P.O. Box 66 Permit Number: 004546 Crystal Bay, Minnesota 55323 Date Issued: 08#"1C)/92 (612) 473-7357 SITE ADDRESS: 2990 SUSSEX RD „TB P . 1 . N. : 04-117-23-31-0014 DESCRIPTION: Sewer & Wat.er Perroit Type NEW SEPTIC SYSTE Sewer & Water Work Type RESIDENCE REMARKS: FEE SUMMARY: Base Fee $100. 00 Surcharge Total Fee $100. 50 CONTRACTOR: - Applicant - OWNER: COPPIN PLBG .S4722:316 JENSEN HOMES C:HATFAU L 90 SUSSEX RD MOUND MN 55:364 LONG LAKE MN 55356 (612) 472-2316 475-0.548 THE _ _ - - NDER..-;IG * pe TO '71,' +0, SPEctFIED A ", IN STRICT *1-***-atily OF ORONO 0 , . ;OTA BUILDINGk,!"..„17.,;` 1,.e,:','izr,,2'.',',0:;‘* ::::4-'",t1' , , A, • • - ' 11/4, alga - 41Pe)Z--044(.. 2- AP•LICANT/PERMITEE SIGNATURE ?cISSUED BY SIGNATURE APPLICATION FOR SEPTIC SYSTEM PERMIT CITY OF ORONO Box 66 (1335 So Brown Rd) Crystal Bay, MN 55323 *************************************************************************** General Instructions: 1. You may apply for septic system permits by mail or in person at the City offices. However, permits will not be mailed out and must be picked up in person at the City offices. 2. Permits are not valid until you receive a permit card. 3. Work must not begin unless the permit card is available on the job site. 4. Permits will be issued only to contractors holding a City of Orono Septic System Installer' s License. 5. All work must be done in accordance with the approved septic system design. Design reports are not considered approved unless accompanied by the "City of Orono Septic System Approval" cover sheet signed by the City Inspector. 6. The following inspections will be required for all septic systems: a) Pre-installation site inspection to include inspector, installer, and general contractor. b) Tank installation prior to covering. c) Drainfield trench installation prior to covering. For mounds, inspection is required after rough-up but prior to sand placement (sand will be jar tested for silt content) , and again during pressure distribution piping installation in the rock bed. d) Final inspection to verify proper final cover depths and to verify that all pump station (where required) components are functional and comply with codes. 7. Individual holding MPCA Installer Certificate shall be present during installation. 24-hour notice is requirea for all inspections. *************************************************************************** JOB SITE ADDRESS: p C1 !, 0 Occupancy Type: Residential G®` Commercial Other Owner' s Name: J-e v1.S4 .yllva-- Phone: '11 S • 0 Mailing Address: City: Zip: � Septic Contractor' s Name: COQv 0 Q t v\�lg2 Bus. Phone:tL a t k, Mailing Address: c3 3 0 Ck4e.4,.,\ City: al-0 c Zip.: S3 b ************************************************************************** - over - 4 A SEPTIC SYSTEM PERMIT APPLICATON - PAGE 2 Permit Type & Fees (check one) New Construction, Full System $100. 00 Repair or Replace Existing System $50 . 00 $0.50 State surcharge added to above permit fees SEE FEE SCHEDULE FOR NON-RESIDENTIAL PERMIT FEES DO NOT MAIL PAYMENT~ WITH THIS APPLICATION *************************************************************************** NOTE: Applicant must initial all spaces. Fill in all appropriate blanks, check all appropriate boxes. Initial 1. I have received a copy of the system design including the City of Orono Septic System Approval Cover Sheet. 2 . I will be installing the following: A. Tanks: (— Precast Concrete c--, Other Manufacturer Tank Capacities : 1) l 4 Z gal. 2 ) (u'ro gal. 3 ) 0-44 gal. B. Pump Station (if required) Pump make & model 1-A 7 d Y-0 1.4 (attach pump curve & literature) ; system design requires gpm at feet of head. High water alarm make & model l I] ,^° Outside electrical work to be completed (by installer _electrician _other . Inside electrical work must be completed by electrician. C. Treatment System: Trenches: s.f. Mound Depth of rock below pipe 7, Rock bed dimensions t 0 'x S Si Drop Boxes Sand bed dimensions 3s, 'xyr' Distribution Box Pressure Dist. Pipe Diam. ,, Manifold Pipe Diam. " D. Final Cover/Topsoil to be: £' borrowed from site (show location on site plan) trucked in *************************************************************************** The undersigned hereby applies to the City of Orono for issuance of a septic system installation permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. Signature of Applicant: a000'u.`. G __ Date: D MPCA Certification No. : It cl 1 9 . s CITY OF ORONO Permit SEPTIC SYSTEM APPROVAL Pee $----------------- Entered By • The General Contractor will be given a copy of this report and is responsible for its distribution ESSub_C SHEETtISsATTAECHEDC SYSTEM p AS APPROVED DESIGN IS NOT CONSIDERED • 1C— LOCATION: r s PHONE: GENERAL CONTRACTOR PHONE: SEPTIC CONTRACTOR: PHONE: OWNER: /_/ , IVS APPROVED (Note Changes Below) 0 CONDITIONALLY APPROVED: COMMENTS: lor „ eJ - 11721 Aik- ilepee• a# ...› he ol S%fit' /'_ i I am, '4.4 veI ♦ /` c` d Vi-.#*. o /' ,.t lt� '' "' / �' Pim jags a .0.41J A�` • - Sl �` `l✓ J/�Y a� G -l " I NOTICE TO INSTALLERS: TAny ha to the 357). Call for approved ns plans and spensadvancmuste ave prior approval of the Inspecto ( - NOTICE TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUSTlbe protected Timor to and after system installation to avoid compaction of . - MUST BE FENCED OFF prior to building site excavation and fencing must ALL placeDRAINFIELD AREASgrading. Approval to pour footings will not be granted remainnin nuntil finalesite until the Inspections Department has verified that primary and alternate sites are adequatel protected. N. 'VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' of tested drainfield sites eal l a efo eat Lotsre or af tor You system constr c liable This applies to the lot you are working on and damaging sites on neighboring lots. VESICULARbe cause for revocation of building permits. TRAFFIC CAN CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UNUSABLE. Evidence of traffic on drainfield sites may Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. e.,(7/9-7,› / Q , / i Date Approved By F 1ty of Orono 1y 1 d • • � 9 1 KATYDID LANE -- p7°Ir. mak: 7�4 '..' ,CHAEL, MN 55376 k � 497-3566 spa ' �1 .� LJSt en B. SChirmers July 19 , 1989 Nina Wildman Property Lot 3 , Blk . 3 , Fox Bend Orono , Henn. Co. , MN This system is Designed for a Type 1, four bedroom home and in accordance with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances . The soils on this site are typical of SCS soils mapped - LrB - Lester loam. A seasonally high water table was located at 18" , 20" , 22" , 24" , 26" & 30" , (mottled soil ) . Due to the seasonally high water table, a pressurized mound system will need to be installed. The bottom of the , rock bed must be located at least 3 ' above the seasonally high water table . The soils at a depth of 18" have a percolation rate averaging 13 . 8 min/inch and are adequate for. treating septic effluent . A pumping chamber will need to be installed to lift the effluent to the treatment area . The manifold and supply line pipe must have back drainage to the pumping chamber . The distribution pipes shall have their ends capped . Be sure the rock and sand fill material are clean. The sod layer below the entire mounded area must be turned over , just break up the sod, be sure not to over work. The power supply and switches must be located outside the manhole and pumping chamber in a weather proof enclosure . A warning device must be installed with a light and sound device, this is in case of a pump failure. (Mercury floats are a good method) . All neighboring wells are located more than 100 ' away from the proposed treatment area . Keep all heavy equipment off of the proposed treatment area before and after construction as much as possible . The treatment area should be marked off before construction . With proper installation . and maintenance, this system should have no problem in treating septic effluent effectively. Recommend to pump .the septic tank every year if there is only 1 tank & every 2 years if there are 2 tanks . _ Soil and Percolation Tests • S---C _- 2 • Septic System Design Steven B. Schirmers IDS SBS/cls I \ _______c___pz.-----___—. \ § A& ____— . y._ - - "') ..... 3j] 1� 1 • E �� _ � , Fes' , - `._ A. I _ 1 > ;; �. ",1;$ 4 -------/ ret/ !s TnP �F P IS /=�4- cT 1 7L' S. %1L,7',',/ 7� . I i eFrN,t sc. PR�PfXYi!- NzTR/,5- , I- - 1 ,; .:�0 - LOT 47.. 973-.! r ' 2 s u...1 -N__\.._ • i �_ r 1 ?` , m ��r o / G 1 c_.. � 1 tI. KE�P ASL /(E,SV? EQt/lPM �1T OFF OF �_, ..'" — 1 • is-- A T"i,'E• TaEf+T -„17-./.ru/ts 6-E.5cR y ' -, '� -�"� . 1 �� �/ C( ,<A1,0 AFTE2 C4NSTRUG7ieN �- o i l' I'-' ':_'; -_i," `7,. '-'1,- S I \ rrf, ri. J . '611g 6-b- t :--,1 - : 1-1- "7- 7; 1 I < *''''' ' _-- -- i .17-) ill/))' - I- I .r. i_ • 4 -,-.1‘.2.-.7,,m 7Z/1 1 �f 3 ........ ). 1ri /fit,Vr- 2-0), --72).z. . I .J t? \ 4• —f ?%-irn?1,-st, 6 Per cdot:on Tess Scote: /"=s'4' 1 L1�RYnQC-? XSoil 80rings i ��`\ 0 B h Mork I _ • �� Note= This s;sty.r is to be ccx�s'lucted to m i I ril�1�t 872.2; \,. the M;nneso'o Pooh ' I g72s-} rx.-r--rr-1f:to)..1 q 3.6 u on Cor ra A;�hry f s`�-�Pos Chapter 7080 & Local Ordinance 4 j 1}�S=T1 --,J (,'- )S A 1 j ° • �'<<5- _ Check all underground utilities 97r. �qii• 9�Z�— — -�,7z 2i — 97z,! —o„3 I 972 z } tt - t- f-- �i �c \ �� x i FCDERTY OF: wo�an-.C,�.\ Y-c-,e ;t-1_ 1 ( � 97z- I \ ��1 !1-'-; 1 c7r.7 I 97/ G , •,...., , 472-1 c41,..., 97z.yN H Hri S-P TEST/N� !`/ , + — -, + y�' I s4' —'�' 7_ s; d Br7C�.1--- �� .-v — _ 'i� >t� s9' 30 Sy' � Coe: / 1 P1-1.6:2 -497-3566 —-,, i — ir N 0.1 I IS —. id ") /o',. S S. c.c-c_r- 4...e:-c. ' v� ' i S}ET- KS ' z ,�HOUSE , - - . _ c., _.gym must lie • �� . - TOnk 2Q `ram property !ir.eS X - ����1C?� ---i'. '•i ...).r.,_‘,--._ 1vS1�__.-__-• - - ?� from b'Cgs. 1-.0),.4.�C- (t t--I1--4..;CT L. :CO ' "' Tr- c ..er,t Oreo IrarTl is es , streams NOTE: F�.4J su ' end wrlches rn.ni be located in a �E.{>. �u t Treatment ore° 2,..Q.1 from property lines , pp y f f f=•�1.,.=u...) �^G>'N.��cS .,r;x.e,"-1z" _��'Pram wells �•cet ter proof era' s,re o 's de the p:np ng c!�mbcr and min fo.e CAC>'FIc a_1 f rom bdgs. __ 1— —, _,r--k. Q !rem trees — . SOIL BORNG NG ELE`A IONS r� _, I _..doS tYPP_e_ -- - — _2 -9'1 :5 1 Tcnk ! — ,roe % TH. L. Tank TH"3 EL.-�t1.. -----:. , Dro_p_!o Tank L tu "i PRESSURE D!STRI�'JTION MOUND SYSTEM TH.- EL.-92 .? Min. It1 to 8' - rH'5 EL.-`�0D,� tt �1 p `,�/ `, Pump,ng ' max.111 to 41 K._ C •�F^ F' Y.J s 1-�A\._k_-n Chamber ELEVATION at PROPOSED PLMP!NG 4 to 6 dia.pipe CHAVbER-c103-c A\''c'• -c.K --co'? o-= \--,-- 9 1 L.O SYSTEM DESIGN -MOUND SLr',�� c L.. c'‘co SS.O TYPE—=, 4_ BEDROOM , Averoge percolation rote 13-`min./inch (design.83 sq.ft treatment area per go!. of daily sewuge flow) (-moo go!./day x.83sq.ft/go!.4-)rc sq.ft.of treatment area +10% =54') sq.ft. (= 10fl.width=SS ft.tength of bed area +side slope run..to I x?_� height= 3(-,, ft.x ?I ft.town-area needed) Clean rock needed— ,1i') sq.ft.treatment area x l.a c' depth of rock=,C1-)LA cu.ft--27= 1 cu.yds,(3/4"io 21/''dia. ,includes 2"ofrock above pipe) Clean sand fill below rock needed11-I cu.yds. opprox. , sandy loam bock fill a-S w-yds.opprox., topsoil 6" ``•1 cu.yd. _Ao •itis—__��—Via__► -2_ Number of tanks required a 1st tonkloagot. 2nd1ankIcc (�rc.oMr-�E.09 �o c,00 a co"..., -co -z oFsc,"�` \Fg 1.-.-1�1ag suc_ (oS c_Yo.�(-cc,)I q , gal.minirt ns R.Q.. Fu.,,nP1►.>>, et��•,r.:,c.� Pumping chamber capacity- 25% of doily sewage flow of Lea gal.=1 SO gal.+reserve storage of 15 0C2.1/B1:#.. ° gal.+pipe bock droinoge— of 1 Y gal-/100 Iin.ft.of d .dia. supply pipe, lin.ft.needed /o r 15 at.+ manifold 1 PROPERTY OF ln/tt tiM A?lOP�=�'r`� , g `�gal./IOO lirlft of "dia.pipe,tn. 7 go!. Z T 3 v 1..�Z �_, )- E>,o. . Calot capacity needed 'Th I I. go (plus area for Pump) 1..1--_.r__ r.t,n, Joo c a,,.-1.°.,\°, c yz Y1 . 1 t,pp _ (C) , Distribution pipe.L�."dia. , /.SG_Iin.ft., 1/Li "dia. perforations 3C-."oport _ Pump size1/ hp. (pumpoble copocity 1') 1 gal.4 cycles/day) u t_GI v ' 1-1 c- - �e-Es 01�.�u I. enc- -t C"..`,`-'' u 1- 1/m,r-, • S—P -. ' - � N . Note : When constructing bed -- , this oreo should be shoped Note: Distance from treatment orea io neighboring Yetis— I to divert run-off from entering treatment area. La' -c-7.- '�F - - � � - la. 1 O o ' Designed 9y= � ✓--6� ... /TEST/NG / • I Dote :_Q/�/f., , PH. 612-497-3566 �� CE..RTIF'ICATION # 00627 . Logs of Soil Borin • Location or Project Wildman Property, Lot3, FdX' Bend , Orono Borings made by S-P Testing, Inc . Steve Schirmers _ Date 6-21-89 Classifiction System: AASHO ; USDA-SCS X ; Unified ; Other Auger used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring number 1 Depth , Boring number 2 in 971 . 7 in 972 . 5 feet Surface elevation feet Surface elevation 0 Topsoil dark brown loam 0 Topsoil dark brown loam 0 - 8" 0 - 10" lBrown clay loam 1 - Brown loam 8" - 2 ' -MOTTLING 2 2-1/ 2 ' -MOTTLING 2 - 2 , _ 2 , 4„ OliYoabrown 10" - 2 ' 8" Olive br wn cla�� Rusty olive brown 3 - 2 , 8u - 3 , 2" loam 3 - clay loam 2 ' 4" - 3 ' 411 Rusty olive brown loam 4 - 3 ' 2" - 4 ' 2." 4 Rusty olive brown loam Olive brown loam 5 - 5 - 4 ' 2" - 6 ' 3 ' 4" - 6 ' 6 - 6 - 7 - 7 - 8 - 8 - End of boring at 6 ' feet. End of boring at 6 ' feet. Standing water table : Standing water table : present at feet of depth, present at feet of depth, hours 'after boring . - hours after boring. Not present in hole. X Not present in hole X Mottled soil :. Mottled soil : Observed at 2-1/2fee t; of depth. Observed at 2 ' feet of depth. Not present in hole. • Not present in hole Comments : • Comments : 'CERTIFICATION # 00627 Logs of Soil Borings _ Location or Project Wildman Property, Lot � ,i3 ox Bend, Orono Borings made by S-P Testing , Inc . Steve Schirmers Date 6-21-89 Classifiction System: AASHU ; USDA-SCS X ; Unified ; Other _ Auger used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring number . 3 Depth , Boring number 4 in in feet Surface elevation 972 . 5 feet Surface elevation 972 . 2 0 - 0 Topsoil dark brown Topsoil dark brown 0 - 10'.' loam 0 - 1 loam 1 - - Brown loam 1 Brown loam 10" - 1 ' 8"-MOTTLING 1 ' - 1 ' 10"-MOTTLING • 2 . - Gray brown loam 2 - Olive brown loam 1 ' 8" 2 ' 4" 1 , 10" - 2-1/2 ' 3 - Rusty .gray brown 3 - Rusty olive brown loam 2-1/2 ' - 3 ' 4" loam Rusty olive gray • 4 - 2 ' 4 - 4 ' 2" 4 - silty loam 314" - 4 ' 4" 5 - Rusty gray loam 5 - Very loamy gray • 6 - 4 ' 2" - 6 ' 6 - 4 ' 4" - 6 ' • 7 - 7 - • 8 8 - End of boring at 6 ' feet. End of boring at 6 ' feet. Standing water table : Standing water table : present at feet of depth , present at feet of depth, hours •after.. boring . hours after boring . Not present in hole X Not present in hole X • Mottled soil : Mottled soil : Observed at 1 '8" feet of depth. Observed at 1 ' 10" feet of depth. Not present in hole Not present in hole Comments : Comments : :cERTIFICAT'ION # 00627 Logs of Soil Borings Location or Project Wildman Property, Lot � , Fox Bend, Orono Borings made by S-P Testing` Inc . Steve Schirmers _ Date 6-21-89 Classifiction System: AASHO ; USDA-SCS X ; Unified ; Other Auger used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring number ' 5 Depth, Boring number 6 in in feet Surface elevation 972 . 6 feet Surface elevation 972 . 2 0 0 Topsoil dark brown Topsoil dark brown loam 0 - 10" loam 0 - 8" 1 - Brown loam . 1 - Brown clay loam 10" - 1 ' 4 8" - 1-1/2 ' -MOTTLING Brown clay loam Olive brown clay loam 2 1 ' 4" - 2 ' 2"-MOTTLING 2 _ 1-1/2 ' - 2 ' 4" Olive 2 ' 2" - 2_1/2 ' b °aynlo:m 3 - Olive brown loam 3 - Very rusty gray silty loam 2-1/2 ' - 3' 8" 4 Rusty' gray loam 4 2 ' 4" - 4-1/2 ' Rusty gray sandy loam 5 - _ 4-1/ 2 ' - 5 ' 3 ' 8" - 5 ' 2" 5 Rusty medium sand Rusty gray silty loam. 5 ' - 5-1/ 2 ' Rusty gray loam 6 - � 5 ' 2" - 6 ' 6 - 5-1/2 ' - 6 ' • 7 - 7 - 8 - 8 - • End of boring at 6 ' feet. End of boring at 6 ' feet. Standing water table : Standing water table : present at .feet of depth , present at feet of depth, hours after' boring . hours after boring. Not present in hole X Not present in hole X Mottled soil : Mottled soil : Observed at 2 ' 2-" feet of depth . Observed at 1-1/2 ' feet of depth. Not present in hole • Not present in hole Comments : Comments : CERT. #00627 ' PERCOLATION TEST DATA SHEET ; S—P Testing , Inc . on 6--22-89 starting 10 : 36 m Percolation test readings made 3 b" P (dale) Lot 5, �ox Bend, Orono 1 6-21-89 Test hole location , Hole number ,Date hole was prepared • Depth of hole bottom 18 inches, Diameter of hole 6 inches ' Soil data from test hole: Depth, inches Soil texture 0 — 10" Topsoil dark brown loam 10" 18" Brown clay loam • Method of scratching sidewall Knife 2 Depth of gravel in bottom of hole inches ' 6-21-89 10 : 00am 12 Date and hour of initial water filling Depth of initial water filling inches above hole bottom _ Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon 6 '4 �. ,Maximum water depth above hole bottom during test inches Time Percolation , Time interval, Measurement, Drop in water rate, Remarks minutes inches level, inches minutes per inch 10 :23 prefill 6 10 : 36 11 : 06 2-1/ 8 r 14 . 1 30 min 11 : 09 ~ 11 : 39 II 2 15 . 0 I " 11 : 40 12 : 10 , c, 1-15/16 15 . 5 ii " — •• I 14 . 9 . Percolation rate = minutes per inch. . - • CERT. #00627 PERCOLATION TEST DATA SHEET • Percolation test readings made {lv S—P Testing , Inc . on 6-22-89 starting at 10 : 37 p.m. Test hole location •Lot , Fox Bend, Orono Hole number 2 , Date hole was prepared6-21 • —89 Depth of hole bottom 18 inches, Diameter of hole 6 inches Soil data from test hole: • Depth, inches Soil texture 0 - 8" Topsoil dark brown loam 8" - 18" .. Brown loam Method of scratching sidewall' Knife 2 Depth of gravel in bottom of hole inches 6-21-89 10 : 00am 12 Date and hour of initial water filling , Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon , Maximum water depth above hole bottom during test 6 inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level, inches minutes per inch 10 : 23 prefill ; 6 10 : 37 11 : 07 2-13/16 ; 10 . 7 j 30 min 11 : 08 j 11 : 38 2-11/16 ; 11 . 2 IIt " 11 : 41 12 : 11 . f- II 2-5/8 j 11. 4 • " � I t 1 I i I I � I 7 t � I A .. 11 Percolation rate = . 1 minutes per inch.. CERT. #00627 PERCOLATION TEST DATA SHEET S—P• Testing, Inc . 6-22-89 10 : 38 411131, Percolation test readings made by on starting at p.m. Test hole location Lot . (3 Fox Bend, Orono, Hole number 3 Date hole was prepared 6-21-89 • Depth of hole bottom__ 18 inches,'Diameter of hole 6 inches • Soil data from test hole: Depth, inches • Soil texture 0 — 10" Topsoil dark brown loam 10" — 18" Brown loam Method of scratching sidewall Knife, Depth of gravel in bottom of hole 2 inches • 10-21-89 10 : 00am 12 Date and hour of initial water filling ,Depth of initial water tilling inches above hole bottom Automatic siphon • Method used to maintain at least 12 inches of water depth in hole for at least 4 hours 6 _. , Maximum water depth above hole bottom during test inches 1 Time Percolation Time I interval, Measurement, Drop in water rate, Remarks minutes • inches level, inches minutes per inch 10 : 23 prefill i 6 10 : 38 10 : 48 3-3/4 2 . 7 10 min 10 : 51 11 : 01 ' " It " " II 11 : 02 11 : 12 it 11 11• • Percolation rate = 2 • 7 minutes per inch. CERT. #00627 • PERCOLATION TEST DATA SHEET • Percolation test readings made by —P Testing, Inc . on 6-22-89 starting at10 : 39 g II:, IJair) Lot , FOX Bend, Oron 4 6-21-89 Test hole location ,dole number , Date hole was prepared 18 6 Depth of hole bottom inches, Diameter of hole inches Soil data from test hole: • Depth, inches Soil texture 0 - 12" Topsoil dark brown loam 12" - 18" • Brown loam Method of scratching sidewall Knife • • • Depth of gravel in bottom of hole - 2 inches ' 6-21-89 10 : 00am 12 Date and hour of initial water filling' ,Depth of initial water tilling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon • , Maximum water depth above hole bottom during test 6 inches ) Time • Percolation Time interval, • Measurement, Drop in water rate, Remarks minutes inches level, inches minutes per inch 10 : 23 . prefill I 6 10 : 39 1 10 : 49 2-3/4 3 . 6 10 min 10 : 50 1 11 : 00 • " " " II I/ 11 : 03 11 : 13 If " II II • I I I � � l Percolation rate = 3 • 6 minutes per inch. • CERT. #00627 PERCOLATION TEST DATA SHEET Percolation test readings made b S—P Testing, Inc . on 6-22-89 starting at 10 : 40 p Lot3, Fo Test hole location , x Bend, Orono Hole number 5 6-21-89, Date hole was prepared P P� Depth of hole bottom 18 inches, Diameter of holt 6 inches Soil data from test hole: • Depth, inches Soil texture 0 - 10" • Topsoil dark brown loam • 10" - 16" Brown loam 16" - 18" Brown clay loam • Method of•scratching sidewall Knife 2 Depth of gravel in bottom of hole inches 6-21-89 10 : 0Q.am12 Date and hour of initial water filling epth o initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon 6 , Maximum water depth above hole bottom during test inches • Time • Percolation Time interval, • Measurement, Drop in water rate, Remarks minutes inches level, inches minutes per inch 10 : 23 prefill 6 10 : 40 11: 10 1-9/16 19 . 2 30 min 11 : 14 11 : 44 • tl 1-7/ 16 20 .19 " � l 11 : 47 I 12 : 17 1-3/8 21 . 8 " • • • i w 20 Percolation rate =_, . 6 minutes per inch. . ' i CERT. #00627 . • PERCOLATION TEST DATA SHEET 1 .I Percolation test readings made by S—P Testing, Inc. un_ 6—2 2—8 9 starting at 10 : 41 63 1 , ,Jule, Test hole location Loth, Fox : Bend, Orono !tole number 6 , Date hole was prepared_6-21-89 • Depth of hole bottom 18 inches, Diameter of hole• 6 inches Soil data from test hole: • Depth, inches Soil texture 0 — 8" • Topsoil dark brown loam 8" — 18" ' . Brown clay loam Method of scratching sidewall Knife • Depth of gravel in bottom of hole 2 inches 6-21-89 10 : 00am 12 Date and hour of initial water filling , Depth of initial water filling inches above hole bottom Automatic siphon Method used to maintain at least 12 inches of water depth in hole for at least 4 hours 6 ....... , Maximum water depth above hole bottom during test inches Time I I Percolation Time interval, Measurement, Drop in water rate, I Remarks minutes inches level, inches • minutes per • inch 10 : 23 prefill 6 10 : 41 11 : 11 1 30 . 0 30 min 11 : 15 11 : 45 1 " 11 : 46 12 : 16 F I " 1 1 1 I . p • 30 . 0 • Percolation rate = minutes per inch.