February 5, 2014
Travis & Lisa Winkey
2103 Sugarwood Drive
Long Lake, MN 55356
RE: Building Permit#2012-00632
Hello,
In the process of closing out completed building permit project files, it was noted we have not
received an as-built survey and hardcover calculations for the swimming pool addition at your
property. We continue to hold an escrow of$2,500 pertaining to the project.
Once the weather permits, please have an as-built survey and hardcover calculations, prepared
by a surveyor and submitted to us. Once our engineer determines the property conforms to the
approved building permit plans, approved grading plan, etc. your escrow can be refunded.
Please see the attached code section regarding our survey requirements.
I can be reached at 952-249-4620 or at cmattson@ci.orono.mn.us if you have any questions.
Sincerely,
CITY OF ORNO
`
Yp �
Christine Mattson
Planning Assistant
Attachments
� N �
February 5, 2014
2103 Sugarwood Drive
Page 2 of 2
Sec. 86-68. Permit appiication; information required.
(a) The application for a construction permit shall include such information as may be required by the
city, which may vary between types of construction projects.
(b) Surveys required:
(1) Initial survey. Any building or general permit application for construction of a new structure or
expansion of an existing structure shall be accompanied by a certificate of survey prepared
by a Minnesota Registered Land Surveyor unless the building official determines the
construction project is exempt from this section. The certificate of survey shall conform to the
standards on file in the office of the building official.
(2) Foundation survey. A foundation survey shall be submitted to the city for review and
approval, unless exempted by the building official, upon completion of the foundation work for
all buildings and all additions to buildings. The foundation survey, prepared by a Minnesota
Registered Land Surveyor, shall certify the lot dimensions; front, side, rear, lakeshore, and
wetland setbacks; and foundation elevation. A foundation survey must be submitted before
proceeding with framing or further construction. In lieu of a sunrey a letter prepared by a
Minnesota Registered Land Surveyor containing the same information as a foundation survey
may be submitted.
(3) As-built survey. An as-built survey, prepared by a Minnesota Registered Land Surveyor, shall
be submitted to the city for review and approval upon the completion of all buildings and all
additions to buildings, unless exempted by the building official. The as-built survey shall
certify the final topography of the site; verify drainage pattems; and provide hardcover
calculations for lots in the Shoreland Overlay District. An as-built survey must be approved
before the issuance of a certificate of occupancy. In the event that weather or other
conditions prevent the completion of an as-built survey at the time the Certificate of
Occupancy is requested, applicant shall provide a sufficient financial guarantee and establish
an escrow agreement to ensure completion of the as-built sunrey.
(Code 1984, § 12.02; Ord. No. 49 3rd series, § 1, 9-8-2008)