Laserfiche WebLink
;�'__� <br /> / ;�. jO �` �;. <br /> % ' 7' �\ \� <br /> ;/� 0�� <br /> �� ,:: ., �; CITY of OIiUNO� <br /> ;� ,� r ,�• <br /> �` � � �, .1 Municipal Offices <br /> ,��'�"�'' � , �' � ' ti. <br /> � �; � �` �;�� G " Street Address: Mailing Address: <br /> ` ��9xE � p4�' 2750 Kelley Parkway P.O. Box 66 <br /> sK <br /> --.,_ -_�. - Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Cunent Owner of Address � � ��`� �3�3 S �'9� S <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of tlie system is available for most properties at <br /> the Orono City Ha1L <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes,please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identi as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 <br /> December 31,2010 ✓ <br /> Other ' <br /> Septic Tank(s) ump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> /v��'1�U � . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> � <br /> Inspector: � ��tJ��Date of Inspection %� � j <br /> Telephone(952)249-4600 � Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />