Loading...
HomeMy WebLinkAboutRe: barn addition To: Lyle Oman, Building Official Willie Gibbs, Septic Systems Inspector From: Mike Gaffron, Planning Director Date: May 15, 2006 Subject: 355 Stubbs Bay Road - Barn Addition The proposed barn is an Oversize Accessory Structure (2800 sf proposed, 3000 s.f maximum allowed for this 9.95 acre site) and is subject to the standard Oversize Accessory Structure Covenant - copy for signatures is attached, pending Matt Brokl's OK for format. The proposed barn includes a bathroom (toilet, lavatory, shower) that has been crossed off the plans, with a note from Kevin Kamerud indicating this will not be constructed now. The plans also include service sink, water heater and washer/dryer. Installation of the sink and washer requires that the property owners execute a Limited Wastewater in Accessory Building Covenant - copy for signatures is attached, pending Matt Brokl's OK for format. The initially proposed fixtures, and the future fixtures, will require connection to a conforming wastewater treatment system. Willie, please review the existing system and contact the builider/owner to determine how they plan on treating this waste, given that the existing house with recent additions has a system designed for 3 bedrooms, a house layout that could easily grow to 4-5 bedrooms, and now the addition of waste from the barn.