1.PROJECT INFORMATION
Applicant Name Project Name Date of Application
Kuhl Design Build(Dan Murphy) 1025 Springhill Road Application Number
5/18/15 W15-23
(Incomplete)
6/10/15
(Complete)
�Attach site locator map
T e of Decision:
� Wetland Boundary or Type ❑No-Loss ❑ Exemption ❑ Sequencing
❑ Replacement Plan ❑ Banking Plan
Technical Evaluation Panel Findin s and Recommendation if an :
❑Approve ❑Approve with conditions ❑ Deny
Summary(or attach):
2.LOCAL GOVERNMENT UNIT DECISION
Date of Decision: 8/12/15
�Approved ❑Approved with conditions(include below) ❑ Denied
LGU Findings and Conclusions(attach additional sheets as necessary):
BWSR Forms 7-1-10 Page 1
of 3
.
Kuhl Design Build(Dan Murphy) applied for wetland boundary&type confirmation for the
wetlands located at 1025 Springhill Road in the City of Orono, Hennepin County, Minnesota
(PID 2611823430005). Legal description: Section 26, Township 118N, Range 23W.
A wetland delineation was conducted by Svoboda Ecological Resources (SER)on Apri123,
2015. A complete delineation report and WCA application was submitted to MCWD on June
10, 2015. Two wetlands were delineated on site. Wetland 1 was identified as a Type 1,
floodplain forest and Wetland 2 was identified as a Type 2, fresh(wet)meadow transitioning
into a Type 3, shallow marsh. A sliver of Long Lake extends into the southern bounds of the
property and Wetland 2.
MCWD reviewed the boundaries in the field on 7/23.MCWD requested an updated figure depicting
the full extent of the boundaries of Wetland 2,which SER supplied on 8/7/15 after the 60 day
decisionmaking timeline had been extended to allow for the updated figure to be submitted.
MCWD approves the wetland boundaries as documented in the updated figure and the wetland types
as documented in the delineation report.This decision is valid for five years.A future project located
on this property may require a permit from the MCWD.
For Re lacement Plans usin credits from the State Wetland Bank:
Bank Account# Bank Service Area County Credits Approved for
Withdrawal(sq.ft.or nearest
.O 1 acre)
Replacement Plan Approval Conditions. In addition to any conditions specified by the LGU, the
approval of a Wetland Replacement Plan is conditional upon the following:
❑Financial Assurance: For project-specific replacement that is not in-advance,a financial assurance
specified by the LGU must be submitted to the LGU in accordance with MN Rule 8420.0522, Subp. 9
(List amount and type in LGU Findings).
❑Deed Recording:For project-specific replacement,evidence must be provided to the LGU that the
BWSR "Declaration of Restrictions and Covenants" and "Consent to Replacement Wetland" forms
have been filed with the county recorder's office in which the replacement wetland is located.
❑Credit Withdrawal: For replacement consisting of wetland bank credits,confirmation that BWSR
has withdrawn the credits from the state wetland bank as specified in the approved replacement plan.
Wetlands may not be impacted until all applicable conditions have been met!
LGU Authorized Si ature:
Signing and mailing of this completed form to the appropriate recipients in accordance with 8420.0255,
Subp. 5 provides notice that a decision was made by the LGU under the Wetland Conservation Act as
specified above. If additional details on the decision exist,they have been provided to the landowner
and are available from the LGU u on re uest.
Name Title
Beth Brown Permitting Technician
Signature Date Phone Number and E-mail
'��;�,I y� �� 8/12/15 (952)641-4504
'"'1'� ebrown@minnehahacreek.org
THIS DECISION ONLY APPLIES TO THE MINNESOTA WETLAND CONSERVATION ACT
Additional approvals or permits from local, state, and federal agencies may be required. Check with all
appropriate authorities before commencing work in or near wetlands.
BWSR Forms 7-1-10 Page 2
of 3
Applicants proceed at their own risk if wark authorized by this decision is started befare the time period
for appeal (30 days) has expired. If this decision is reversed or revised under appeal, the applicant may be
responsible for restoring or replacing all wetland impacts.
This decision is valid for three years from the date of decision unless a longer period is advised by the TEP
and specified in this notice of decision.
3. APPEAL OF THIS DECISION
Pursuant to MN Rule 8420.0905,any appeal of this decision can only be commenced by mailing a petition
for appeal, including applicable fee,within thirty(30)calendar days of the date ofthe mailing of this Notice
to the following as indicated:
Check one:
� Appeal of an LGU staff decision. Send ❑ Appeal of LGU governing body decision.
petition and $0 fee(if applicable)to: Send petition and $500 filing fee to:
Minnehaha Creek Watershed District Executive Director
15320 Minnetonka Blvd Minnesota Board of Water and Soil Resources
Minnetonka,MN 55345 520 Lafayette Road North
St. Paul, MN 55155
4.LIST OF ADDRESSEES
� S WCD TEP member: Stacey Lijewski—stacey.lijewski@co.hennepin.mn.us
� BWSR TEP member: Ben Meyer—ben.meyer@state.mn.us
❑ LGU TEP member(if different than LGU Contact):
� DNR TEP member: Kate Drewry—kate.drewry@state.mn.us
� DNR Regional Office(if different than DNR TEP member): Brooke Haworth -
brooke.haworth @ state.m n.us
❑ WD or WMO(if applicable):
� Applicant(notice only)and Landowner(if different): Dan Murphy(Kuhl Design Build)—
dan @ kuhldesignbuild.com
� Members of the public who requested notice(notice only): Frank Svoboda(SER)—
franks@gpsinnovations.com,Christine Mattson (City of Orono) —cmattson@ci.orono.mn.us
� Corps of Engineers Project Manager(notice only): Melissa Jenny—
melissa.m jenny@usace.army.mil
❑ BWSR Wetland Bank Coordinatar(wetland bank plan applications only)
5.MAILING INFORMATION
➢For a list of BWSR TEP representatives: www.bwsr.state.mn.us/aboutbwsr/workareas/WCA_areas.pdf
➢For a list of DNR TEP representatives: www.bwsr.state.mn.us/wetlands/wca/DNR TEP_contacts.pdf
➢De artment of Natural Resources Re ional Offices:
NW Re�l�ll: NE Re i�on: Central Re�ion: Southern Reeion:
Reg. Env. Assess.Ecol. Reg. Env. Assess. Ecol. Reg. Env. Assess. Reg. Env. Assess. Ecol.
Div. Ecol. Resources Div. EcoL Resources Ecol. Div. Ecol. Resources
2115 Birchmont Beach Rd. 1201 E. Hwy.2 Div. Ecol. Resources 261 Hwy. 15 South
NE Grand Rapids, MN 1200 Warner Road New Ulm, MN 56073
Bemid'i, MN 56601 55744 St. Paul, MN 55106
For a map of DNR Administrative Regions, see: http://files.dnr.state.mn.us/aboutdnr/dnr re�ions.pdf
➢For a list of Corps of Project Managers: www.mvp.usace.anny.mil/re ul�atorY/default.asp?pa�eid=687
BWSR Forms 7-1-10 Page 3
of 3
or send to:
US Army Corps of Engineers
St. Paul District,ATTN: OP-R
180 Fifth St. East, Suite 700
St. Paul,MN 55101-1678
➢For Wetland Bank Plan applications,also send a copy of the application to:
Minnesota Board of Water and Soil Resources
Wetland Bank Coordinator
520 Lafayette Road North
St. Paul,MN 55155
6.ATTACHMENTS
In addition to the site locator map, list any other attachments:
�Approved wetland boundaries
❑
0
BWSR Forms 7-1-10 Page 4
of 3
�
Project Name and/or Number: SER#2015-007-03—1025 Springhill Road,Orono
PART ONE: Applicant Information
If applicant is an entity(company,government entity, partnership, etc.),an authorized contact person must be identified. If the
applicant is using an agent(consultant, lawyer,or other third party)and has authorized them to act on their behalf,the agent's
contact information must also be provided.
Applicant/Landowner Name: Dan Murphy—Kuhl Design Build
Mailing Address: 1515 5th Street S, Hopkins, MN 55443
Phone: 952-935-9469
E-mail Address: dan@kuhldesignbuild.com
Authorized Contact(do not complete if same as above): Frank Svoboda—Svoboda Ecological Resources
Mailing Address: 22752 Co Rd 7, Hutchinson, MN 55350
Phone: 612-384-7770
E-mail Address: franks@gpsinnovatitons.com
PART TWO: Site Location Information
County: Hennepin City/Township: Orono
Parcel ID and/orAddress: 1025 Spring Hill Rd (PID#2611823430005)
�egal Description(Section,Township, Range): A part of the N '/z SE '/4 SW '/4 SE '/4 of Section 26, T118N,
R23 W, City of Orono, Hennepin County, Minnesota
Lat/Long(decimal degrees): Lat.44.993693(44°59'37.2948"N)/Long.-93.550055(93°33'0.1980"W)
Attach a map showing the location of the site in relation to local s�tjrye�ets,�roqads,qhi8gh`ways.
� „�_ /, �-; .�—;`�I ' �,'`_ .. M 7RRb t�r �lcrr" I�'is C�.. .i..�'.
e� ry�,.r� P � y,!.�
Je �»r�,��``f. s'�,�t �a �.� i�'+%��:�i �� �„ �.Yr�- �.,s.��.'OF'
�.�`'-'� �'�g�FR '� � '.�,�',.�x � .�� ,,� ���'`�,� '�„ . �''.~�
.
'P ` '�ti ����� , �a n�r � �`'�' �f �� ��„�:�r��'Yr Y,� ,g.�:�
wtY ' � J� 4� � �'`� � �ar' ..+a �.d.,. r.Q:7��L
�'E�; f, { ,.y,�..� �G .f�'j i eG =�. �,�.,, ''� �'r1.-, -:.� �►-.+„
ri�`�+ � e +'����5,�� �1,��'� Mr ���+� f� \ r` f � .� 3�
�y sf � ���
d 7�"+ • i' :�' ��� �� ���'�`R.�y�'' �� � ` �
�n " 3 ��:�� '�r =„r.*' 7 r� •N t..
.� '
F ! 4 �:� 7 y�
I�`1 \ � f 9" �
��P���.��!����Y,�e'f �.*r`,.��_ �� .Ik�� � L'�r',�i�� r� ,A+ '"!
���•� ,Jy g }'�j�/�y� Y �r ..1' � �s.��
��� y9�7.f' ��� �_�... ��'��i'J"':`1�4 - y���•q�,. ��� ..�� ��� �_�.7`l1�
�I� .7a� . ^�C+ ��. ..4yy w...Ys a.
L'�2'wir� '4�,5��� � �:.': � - :L�' f�,' �.� �.'�.�`�p����R�,}�.�C
R "i.y. "� �. 1 ,1�, :•. . '�l ����'f�i�;,�'
��M
,a-, � {�cyay ��a.R�(�1
µ/ �t,i, ' � ;, �,T�IiP
.. y�.� ��o-.e�
,�i � }�; .���-... .+'�.ys .
� _ _ - `f.( ` ' . a4s'j
. l� "'���J Y.. . � a 4.+. �'
; � :. �'. .�. � ,, ° f�:���
r � i /1�s��'"��`w�`�" -,
�" �L, ,af '4 _.. - F�n�^�:. f .,t ',�i'�`�
.,.�� c� .• 1/ws i a:-� � .t'� '
� . ,g .,t.v J,��
� �� �s � �7i�1''���•C � ��,.� Y' ��i�.�! �1�
.,,r ' ' _,.1..� � , � 3. �Yt ,p,�#��� yj���I�* • r ���'r� '�
�.• � ♦ t
' � �•��_ y,,`_. �'r��'� �vrl r�111�- •�� .�y� � i �y,7o: � �
�� 1� R� �i� � '�, O.'LA� ��_ ����Mil 1►�t 1►•
�AP�w . 3 Yr���5 ._ _. _'r.�.:�u.:,._�
Approximate size of site(acres)or if a linear project,length(feet): 5.76 Acres
If you know that your proposal will require an individual Permit from the U.S.Army Corps of Engineers,you must provide the
names and addresses of all property owners adjacent to the project site. This information may be provided by attaching a list to
your application or by using block 25 of the Application for Department of the Army permit which can be obtained at:
http://www.mvp.usace.armv.mil/Portals/57/docs/regulatory/Re�ulatorvDocs/engform 4345 2012oct.pdf
Project Name and/or Number: SER#2015-007-03—1025 Springhill Road,Orono
PART THREE: General Project/Site Information
If this application is related to a delineation approval,exemption determination,jurisdictional determination,or other
correspondence submitted prlor to this application then describe that here and provide the Corps of Engineers project number.
Describe the project that is being proposed,the project purpose and need,and schedule for implementation and completion.The
project description must fully describe the nature and scope of the proposed activity including a description of all project elements
that effect aquatic resources(wetland,lake,tributary,etc.)and must also include plans and cross section or profile drawings
showing the location,character,and dimensions of all proposed activities and aquatic resource impacts.
The owner wants to know where the approved edge is located before starting the planning process.As soon as approval is
received they will move forward with their project.
PART FOUR: Aquatic Resource Impact1 Summary
If your proposed project involves a direct or indirect impact to an aquatic resource (wetland, lake, tributary, etc.) identify each
impact in the table below. Inctude all anticipated impacts, including those expected to be temporary. Attach an overhead view
map, aerial photo, and/or drawing showing all of the aquatic resources in the project area and the location(s) of the proposed
impacts.Label each aquatic resource on the map with a reference number or letter and identify the impacts in the following table.
Aquatic Type of Impact Duration of Existing Plant �Ounty,Major
Aquatic Resource Overatl 5ize of Watershed#,
Resource Type (fill,excavate, Impact Z Community
ID(as noted on Size of Impact Aquatic and Bank Servi
(wetland,lake, drain,or remove Permanent(P)or 3 Type(s)in Impa
overhead view) 1 Resource 4 Area#of Impact
tributary etc.) vegetation) Temporary(T) Area 5
Area
'If impacts are temporary;enter the duration of the impacts in days next to the"T". For example,a project with a temporary access fill that would be removed
after 220 days would be entered"T(220)".
=Impacts less than 0.01 acre should be reported in square feet. Impacts 0.01 acre or greater should be reported as acres and rounded to the nearest 0.01 acre.
Tributary impacts must be reported in linear feet of impact and an area of impad by indicating first the li�ear feet of impact along the flowline of the stream
followed by the area impad in parentheses). For example,a project that impads 50 feet of a stream that is 6 feet wide would be reported as 50 ft(300 sq/ft�.
3This is generally only applicable if you are applying for a de minimis exemption under MN Rules 8420.0420 Subp.8,otherwise enter"N/A". '
'Use Wetlond Plants and P/ant Community Types of Minnesota and Wisconsin 3rd Ed.as modified in MN Rules 8420.0405 Subp.2.
SRefer to Major Watershed and Bank Service Area maps in MN Rules 8420.0522 Subp.7.
If any of the above identified impacts have already occurred,identify which impads they are and the circumstances associated
with each:
PART FIVE: Applicant Signature
❑ Check here if you are requesting a pre-application consultation with the Corps and LGU based on the information you have
provided. Regulatory entities will not initiate a formal application review if this box is checked.
By signature below,I attest that the information in this application is complete and accurate. I further attest that I possess the
authority to undertake the work described herein.
Signature: �� �� Date: May 15,2015
I hereby aut orize Svobod cological Resources to act on my behalf as my agent in the processing of this application and to
furnish,up reque ,su�ip emental information in support of this application.
b
I
t� �
1 The ter impact"as in is joint application form is a generic term used for diulosure purposes to identify
activities that may requ appr I from one or more regulatory agencies. For purposes of this form it is not meant to
indicate whether or not those activities may require mitigation/replacement.
Project Name and/or Number: SER#2015-007-03—1025 Springhill Road, Orono
Attachment A
Request for Delineation Review, Wetland Type Determination, or
Jurisdictional Determination
By submission of the enclosed wetland delineation report, I am requesting that the U.S.Army Corps of Engineers,St. Paul District
(Corps)and/or the Wetland Conservation Act Local Government Unit(LGU)provide me with the following(check all that apply):
�Wetland Type Confirmation
�Delineation Concurrence. Concurrence with a delineation is a written notification from the Corps and a decision from the LGU
concurring, not concurring,or commenting on the boundaries of the aquatic resources delineated on the property. Delineation
concurrences are generally valid for five years unless site conditions change. Under this request alone,the Corps will not address
the jurisdictional status of the aquatic resources on the property,only the boundaries of the resources within the review area
(including wetlands,tributaries, lakes,etc.).
�Preliminary Jurisdictional Determination.A preliminary jurisdictional determination(P1D)is a non-binding written indication
from the Corps that waters, including wetlands,identified on a parcel may be waters of the United States. For purposes of
computation of impacts and compensatory mitigation requirements,a permit decision made on the basis of a PJD will treat all
waters and wetlands in the review area as if they are jurisdictional waters of the U.S. PJDs are advisory in nature and may not be
appealed.
❑Approved Jurisdictional Determination.An approved jurisdictional determination (AJD)is an official Corps determination that
jurisdictional waters of the United States are either present or absent on the property.A1Ds can generally be relied upon by the
affected party for five years.An AJD may be appealed through the Corps administrative appeal process.
In order for the Corps and LGU to process your request,the wetland delineation must be prepared in accordance with the 1987
Corps of Engineers Wetland Delineation Manual,any approved Regional Supplements to the 1987 Manual,and the Guidelines for
Submitting Wetland Delineations in Minnesota(2013).
http://www.mvp.usace.armV.mil/Missions/Regulatory/DelineationJDGuidance.aspx