HomeMy WebLinkAbout2016-00999 - escrow fee � - �'
CITY OF ORONO * Z 0 1 6 - 0 0 9 9 9 *
2750 KELLEY PARKWAY DATE ISSUED: 08/18/2016
ORONO,MN 55356-
(952)249-4600 FAX: (952)249-4616
ADDRESS : 345 SPRING HILL RD
PIN : 25-118-23-43-0008
LEGAL DESC : REG.LAND SURVEY NO. 1429
: LOT 000 BLOCK 000
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: THIS$2500 ESCROW IS TIED TO BUILDING PERMIT 2016-00928
APPLICANT ESCROW FEE-BUILDING 2,500.00
RILEY,ROGER TOTAL 2,500.00
345 SPRING HILL RD Payment(s)
WAYZATA,MN 55391- . CHECK 6156 2,500.00
OWNER
RILEY,ROGER
345 SPRING HILL RD
WAYZATA,MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this pertnit is issued shall be perfortned according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for onty the work described and dces
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances goveming this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction suthorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
1'he applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
/ /
Applicant Permitee Signature Date Issued By Signature Date
' �" o, �
ESCROW AGREEMENT
DEMOLITION PERMIT#2016-00928 .
AGREEMENT made this_,�day of 20�, by and between the CITY OF ORONO, a
Minnesota municipal corporation("City")and R er Riley("Owners°).
Recitals
1. An application for a demolition permit has been filed for an in-ground pool located at 345 Spring HIII
Road �("�SJ-�b�'e� Property") legaliy described as
'1'7-0.
, Hennepin County,
Minnesota.
2. In conjunction with the demolition, erosion control measures are required as shown on attached Exhibit
�A"
NOW,THEREOFRE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement,
the Owners shall deposit$2,500 with the City. All acc�ued interest, if any, shall be paid to the City to reimburse the City
for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all
out-of-pocket costs(including planning, engineering, or legal consultant review) the City has incurred to assure that the
erosion control measures are installed and maintained so the property complies with the provisions of Orono City Code
Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with
the work and to repair any damage to public property or infrastructure that is caused by the work. If compliance with the
approved Land Disturbance Permit is not accomplished within the allowable time period, the City may bring the project
into compliance by use of the security.
3. RIGHT OF ENTRY. The Owners hereby grant the City, its agents,employees, officers and contractors
the right to enter the property to perform all work and inspections deemed appropriate by the City in conjunction with the
required erosion control measures, inGuding but not limited to constructing or completing any and all of the agreed upon
improvements should the Owners'contractor not complete those improvements by the date specified herein.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs,the City will in tum send a
bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to
the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse
the City for eligible expenses the City has incurred.
6. CLOSING ESCROW. Any remaining amount of the financial security deposited with the City for faithful
performance of the plans and spec'�fications and any related remedial work will be released after the completion and
inspection of all such measures and the establishment of final stabilization for the Subject Property.City Staff shall review
the terms of this escrow agreement two times per year to determine whether the requirements of the project have been
successfully completed and whether it is appropriate to retum the funds. Owner may also request the release of the
funds, and such funds shall be released upon City Staff receiving the appropriate verification that all requirements of the
project have been successfully completed.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses
incurred by the City exceed the amount in escrow,the City shall have the right to certify the unpaid balance to the subject
property pursuant to Minn. Stat. §§415.01 and 366.012.
CITY: ITY OF RONO OWNERS:
By. � / !
+A�-�cx�t— 1�, Zol b
�ts: � r �—
150784
� � . , �
Hennepin County Property Map
Date: 8/16/2016
1 inch =50 feet
Division in Process Comments:
The displayed parcel undary may not be the actual boundary
because this proper is in the process of being divided
or replatted.
��� � ! ��
C'� `� �L- Q�E..�'(Y101a�'�D
This data(i)is turnished'AS IS'with no
representation as to complefeness or
accuracy;(ii)is fumished with no
warrenty of any kind;and(iii)is notsuifable
for legal,engineering or surveying purposes.
Hennepin County shall not beliable forany
damage,injury or loss resulting from this data.
COPYRIGHT�HENNEPIN
COUNTY 2016