HomeMy WebLinkAbout2016 with permit 2016-00840 + erosion control plan0 r4ur The Gregory Group, Inc.
d.b.a.
LOT SURVEYS COMPANY
Established in 1962
LAND SURVEYORS
REGISTERED UNDER THE LAWS OF STATE OF MINNESOTA
7601 73rd Avenue North (763)560-3093
Minneapolis, Minnesota 55428 Fax No. 560-3522
�ururIurs C�Prtifira P
Existing Conditions Survey For:
Property located in Section
10, Township 117, Range 23,
Hennepin County, Minnesota
Property Address: 2040 Spates Avenue
Orono, MN
947.4
948.3
3
\ O
\
\ \ I
947.6
w /
Property Zoned LR -1A
Lakeshore Residential bit
947.29
Setbacks
Front - 50
Side - 30
Rear - 50
Hardcover
Lot area =
27,624.5q ft
Dullding =
044.5q ft
Front Porch =
307-5q ft
Pear Porch =
l l 9 -5q ft
Deck =
45 sq ft
Rear Walk =
54 .5q ft
Garage =
584 5q ft
Gravel Drlvemay =
2,974 5q ft
Total =
4,927 sq ft
Percentage =
l 7, 64 %
,5" my cmp
946.29
i
INVOICE NO. 85093
F.B.NO. 1085-75
SCALE: 1" = 20'
• Denotes Found Iron Monument
O Denotes Iron Monument
E] Denotes Wood Hub Set for
excavation only
Denotes Existing Contours
Denotes Proposed Contours
/ ^ J
8' my cmp x000.0 Denotes Existing Elevation
947.6 9�6.63 000.0 Denotes Proposed Elevation
/ 94.8
T- Basis for � Denotes Surface Drainage
bearings is
/ -O i assumed
950.3 - �
g52 RECEIVED
/ ?40 95/ O '/
o JUL 6 2016
-'S / N 6 S Garage ,' °0 ,
6" t n p' `� 76" Garage CITY OF ORONO
'3f��.• Co ost F2
95/.6
1.2 24 12
/ 9" e 0 / .0 p a aS
P 9s1.5 /
Z \
951.3 I
O Q�
�� 11 953. l 48 k\x N Spbt Rad
// �0 Fence
947.6 ��� ^� j / \�\ 953.3 1 x xV0000'
3 �Sp // 952.9 c c r \X\
® ete 953.3 X\
84 .7//(p I ��Well
� \ 1 B 953.2
A Po \x
l / 1 U'/ 953.1 h \x 14-16"
9 9.8 9 twin maple
943.6
I /
J \
�.9 s � S�
the pile rd
a 952.7 / 949.5
/20 5 e 0
Itr ad/d1seased No. .2 / �95'
940, _ Gr cT 2-J�" -F me /
9 ucl / i z
Ga er tab N l i
953.3
rc�d�ad/dis ased �c 30.2 � - /
0 94 9 \\ ° C, / Block i
Wall
�_ 0 J52. l 952. ' \l4"s�5ce // 946.5 - -
40- 4 birch ''ch
947.3 \\ 02 951.7
9 / S /
946.8 ,o No. l 990
/ � 947.1
.0 tob
Power w �17-,,mentol O _ \ / 35 /
Pole \w 9 J/ 30 / 946.6 ffe
w 948 l dmaple 947.6
^' ��oQ
w o9
b -- lt+grvl c - - -- - - _ 0
946.30 w _ - - - - - - CBuned \ 4le ���jryCb. 946.2,
\w� - Telephone - 0 ' 946.5
T2
\ ° cable Buried s 3.3'
\\ 01" \\ 94 ? Gas '-_ �� X947.2
\ bit w �� 6 `-----9k8 l
\ 945.16 \�. �0
11 20-07
� 0a��J� ?i 945.9
`Sib�7
bit
L�Los 944.20 gf
Pow \ \ 942.2
5 J bit \Gq •
943.13� 942.2 �G\w 9q4 cp�yo s �w
Gqs Timber Wall
2 943.1
942 _\ 2 h \
GqS\ \ \
bit w
,941.26 cis \\w \ \
GqS\\ \ \
Lots 16, 17, 18 and 19, ORA PARK ON LAKE MINNETONKA GqS
Hennepin County, Minnesota
The only easements shown are from plats of record or information
provided by client.
I certify that this plan, specification, or report was prepared by me
or under my direct supervision and that I am a duly Licensed land
Surveyor under the laws of the State of Minnesota.
Surveyed this 3rd day of May 2016.
tev Drawn Bycv Ui�ti
File Name
op-16-19fb108575inv85093. dwg
04,4
oRa
Signed
Gregoo. Pr sch, Minn. Reg. No. 24992
201(c - 00
�ro3lm (avyol pWI,
LEGAL DESCRIPTION
y y LOTS 16, 17, 18, AND 19,
ORA PARK ON LAKE MINNETONKA,
Gaulle HENNEPIN COUNTY, MINNESOTA
PROJECT LOCATION
PART OF SECTION 10,
TOWNSHIP 117, RANGE 23,
HENNEPIN COUNTY, MINNESOTA.
l
'r:;vCIrlp
41
J 3>.f3.
97.=
r � rS rf
SILT FENCE f
� r
24.
03,
C ter, ♦♦♦- 0 �.-
♦ I ,=-
STOCKPILE ♦\ y ,�;
SILT FENCE ♦� ',t
SILT FENCE--► j' J ♦� ;st
IX 95t. TEMPORARY i♦� .,
/ !jam 952- �;t STOCKPILE ♦♦♦�" rlrn,r
/ ( �� X ♦`
952.954 N.
o� 1 I
J // "� c ..~ / i6 Er�`X� �nyi� : it ♦.! j .
I a f r `i�'� "953.<.. ♦ f_
J�♦ X i �- 9'
.
rb
1 '�. x SILT FENCE
t
Proposed
945,3 J
t ! ,
t' \
r /
A"
\
SILT FENCE-
r1 9 i%.F ',` ♦ ! X950_ \\ \. q.'0�
t \ i
.r .
ROCK
v --------CONSTRUCTION' I '
ENTRANCE _���■f
co .,� J�
/• ' �,
1 IU L WHJtiCU Rut,n
NOTES:
ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1
OR CA -2 COURSE AGGREGATE. (WASHED)
A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT
MIGRATION OF THE UNDERLYING SOIL INTO THE STONE.
ROCK CONSTRUCTION ENTRANCE DETAIL
2" x 2" WOOD POSTS FILTER FABRIC S y' _
' (MIRAFI-ENVIRO FENCE
4.0O.C.
Zlt APPROVED EQUAL)
MIN. 30" -MAX 36"
ABOVE GRADE
DIRECTION OF
DRAINAGECG-23 HK*I-FLOW
BACKFILL 6" x 6- TRENT INLET l6ERT
ILII
UNDISTURBED SOL
N �•
PLATE
O
ASSEMBLY
G,J5 Meter � �
tr7� 4
f,> . 953..3 '
♦l21
OVERFLOW #2 -
TOP OF CURB BOX
OVERFLOW #1 -
CENTER OF FILTER
ASSEMBLY
FABRIC
SILT FENCE NOTES:
1. SILT FENCE SHALL BE BLACK IN COLOR. NOTES:
2. DIG A 6'X6" TRENCH ALONG THE INTENDED FENCE LINE. OR MAC}iL SIS TO 6' DEPTH- 1) CONTRACTOR OPTION TO USE WIMCO INLET
3. DRIVE ALL POSTS INTO THE GROUND AT THE DONF&IlL SIDE OF [HE TRt
4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LIE. AND FILL PROTECTION INSERT OR EQUAL.
5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE
6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED.
SILT FENCE DETAIL
INLET PROTECTION DETAIL
t _t._ , 5"
9466
SILT FENCE -/
•!/ 94x6.6
L
vy
9 CO
:ob
94?. f
547.6
1, 1490 -LL amFLAr mat Fm www M
t IY DVAK t FUR foot fMd ff fotlt® OM
aol(IO-I�IV .RP71t � Iet01R'
TEMPORARY DEWATERING DISCHARGE DETAIL
SITE LEGEND:
EROSION CONTROL NOTES
1. All devices necessary to control erosion and sediment (I.E.
perimeter silt fence, rock construction entrances, swales,
ponds, berms, ETC.) shall be installed prior to any other
construction operations.
2. Temporary erosion control soil stabilization shall be completed
within 72 hours of disturbed areas that are to remain fallow
and in an unfinished temporary condition. Temporary
stabilization to be completed in compliance with MnDOT 2575
specifications.
3. After completion of final grading, exposed soils must be
permanently stabilized within 72 hours. Stabilization shall
consist of disc -anchored seed & mulch or sod as allowed by
City, or as proposed on City approved landscape plan for the
project.
4. The site must be kept in a well drained condition at all
times. The contractor shall be responsible for temporary
ditches, or other means necessary to ensure proper drainage.
The building pad must be provided with a positive outflow.
% This work shall be incidental to the grading contract.
�. 5. Entering/exiting of the site shall occur only at rock
construction entrance to reduce tracking of dirt onto paved
streets. Sediment tracked onto streets during working hours
must be reclaimed via street scraping and sweeping at the
end of each working day.
6. Temporary dewatering pump out to be discharged to
constructed Temporary
Dewatering n9 Discharge per detail this
c- _ folie- - ---_ - --_-
non-woven filter fabric, to provide' silt and sediment removal
from storwater prior to discharge to appropriate drainage
area.
POLLUTION PREVENTION NOTES
1. Solid waste: collected sediment, asphalt and concrete millings,
floating debris, paper, plastic, fabric, construction debris and
other wastes must be disposed of properly off-site and must
comply with MPCA requirements.
2. Hazardous materials: oils, gasoline, paint, and any hazardous
substance must be properly stored, including secondary
containment, to prevent spills, leaks or other discharge.
Restricted access to storage areas must be provided to prevent
vandalism. Storage and disposal must be in compliance with
MPCA regulations.
3. External washing of trucks or other construction vehicles is not
allowed on site. No engine degreasing is allowed on site.
4. No concrete washouts are allowed on site.
VEG/TAT/ON GROUND COVER SCHEDULE
1. Permanent turf ground cover shall include all disturbed areas be
covered with a minimum 4" topsoil and sodded or seeded as
allowed by City, or as proposed on City approved landscape
plan for the project.
2. Temporary ground cover shall be MnDOT seed mix 150 shall be
applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied
at 2 tons/ac and disc anchored in areas not covered by sod
or erosion blanket.
3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200
lbs/ac. Disc fertilizer into top 3" of soil. Specification
reference is MnDOT 2575.
4. Dormant seed mix shall be used after November 1 or when
temperatures do not exceed 40' F, using some rates specified
above. No seed shall be placed on snow or ice greater than
2" in depth.
5. Any seeded areas that do not become established with
vegetation shall be reseeded at Contractor's expense.
6. Erosion blanket shall be installed in seed areas with ground
surface slopes of 5H:1 V or steeper.
RECEIVED
JUL 26 2016
CITY OF ORONO
0 20 40 60
GRAPHIC SCALE IN FEET
Survey Data By:
Lot Surveys Company
7601 73rd Avenue North
Minneapolis, MN 55428
763-560-3093
GENERAL GRADING NOTES:
1. Specifications applicable for this project: Current standard
specifications for the City of Orono; the latest Minnesota Department
of Transportation Specifications for Highway Construction; and all
NPDES requirements except where modified by these documents.
2. OSHA requirements shall be followed for all work on this project.
3. The Contractor shall notify "Gopher State One Call" 48 hours prior to
any excavation (1-800-252-1166.)
4. The Grading Contractor shall verify all locations and elevations of
underground utilities with utility companies prior to any construction,
and immediately notify the Engineer of any conflicts.
5. Final Plat shall govern for easements and lot dimensions.
6. Any erosion control items necessary to protect adjacent properties shall
be constructed prior to the start of excavation or grading work.
7. Erosion control maintenance shall be performed by the Grading
Contractor, and removed -as per the, Contract Documents or as
directed by the Owner, followed by all necessary restoration of
disturbed area.
8. The Grading contractor shall provide positive drainage on the site at all
times. Grading tolerances shall be 0.10' for hard surface areas.
Grading tolerances for the remainder of the site shall be 0.25'.
9. The Grading Contractor shall keep public streets, parking lots, and
travel ways clear of soil and debris. Daily cleaning at the
construction entrance shall be performed, especially at the end of
each day's work.
EROSION CONTROL. INSTALLAT ON SCHEDULE
1. Silt fence shall be inslalled or restored prior to any construction- Silt fence
shall be located as shown to intercept runoff. The area located beyond the'
perimeter silt fence shall not be disturbed during construction.
2. Rock Construction Entrance shall be installed prior to grading operations.
3. All storm sewer inlets shall have inlet protection inserts installed.
Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter"
inlet protection devices as manufactured by WIMCO (or approved equal)
and installed per manufacture's recommendations.
4. All erosion control installations shall remain in place and be maintained in
good condition by the contractor- until the site has been re -vegetated, at
which time it shall be removed by the contractor. For proposed paved surface
areas, the contractor may remove necessary silt fencing to construct roadway,
while maintaining adequate erosion control in adjacent areas.
5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil
for disturbed areas to be re -vegetated.
6. The contractor shall schedule site grading, utility installation and site
construction so that the general site can be mulched and sodded or
re -seeded as soon as possible soon after disturbance. Areas that will not be
subject to construction traffic shall be seed and mulched or sodded within 72
hours of final grading.
EROSION CONTROL MAINTENANCE SCHEDULE
1. Erosion control measures shall be inspected by the contractor's representative
and maintained by the contractor every Friday and within 24 hours after any
rainfall event larger than 1/2" until the project is completed. Maintenance
requirements are as follows: silt fence - 1/3 height of fence or damaged,
remove sediment and/or repair fence within 24 hours; rock entrance -
refresh as necessary to conform to detail; inlet protection inserts - remove
sediment after each rain event, clean or replace filter when clogged; surface
water - drain and stabilize, within 72 hours of discovery; street sweeping -
remove all sediment tracked onto paved surfaces within 24 hours or as
directed by City Eng'neer.
2. Replacement - Fabr'c shall be replaced promptly when it decomposes or
becomes ineffective before the barrier is no longer necessary.
3. Any sediment remaining in place after silt fence is no longer required shall be
dressed to conformw` h the existing grade, prepared, and seeded with
appropriate seed mix, s directed by the engineer.
4. Removal of the silt f ce- Silt fences shall be removed when they have
served their useful p ose, but not before the upward sloping area has been
permanent'.' :-zed
zed
RESPONSIBLE PARTY
Contact information for tr responsible party for erosion
control is:
CITY DESIGN + BUILD, LL - General Contractor
Erich Hostreiter - Project oordinator
612-886-3560 phone
erichOcityhom esll c. com
CLIENT:
Existing Property Line
............................... -....................
Existing Adjacent Property Line
-------### ---- -
Existing Contour w/Elev. Text
------### -----
Proposed Contour w/Elev. Text
Proposed Building
■■N■■■ENN■N■■
Proposed Silt Fence
;111D
Proposed Inlet Protection
EROSION CONTROL NOTES
1. All devices necessary to control erosion and sediment (I.E.
perimeter silt fence, rock construction entrances, swales,
ponds, berms, ETC.) shall be installed prior to any other
construction operations.
2. Temporary erosion control soil stabilization shall be completed
within 72 hours of disturbed areas that are to remain fallow
and in an unfinished temporary condition. Temporary
stabilization to be completed in compliance with MnDOT 2575
specifications.
3. After completion of final grading, exposed soils must be
permanently stabilized within 72 hours. Stabilization shall
consist of disc -anchored seed & mulch or sod as allowed by
City, or as proposed on City approved landscape plan for the
project.
4. The site must be kept in a well drained condition at all
times. The contractor shall be responsible for temporary
ditches, or other means necessary to ensure proper drainage.
The building pad must be provided with a positive outflow.
% This work shall be incidental to the grading contract.
�. 5. Entering/exiting of the site shall occur only at rock
construction entrance to reduce tracking of dirt onto paved
streets. Sediment tracked onto streets during working hours
must be reclaimed via street scraping and sweeping at the
end of each working day.
6. Temporary dewatering pump out to be discharged to
constructed Temporary
Dewatering n9 Discharge per detail this
c- _ folie- - ---_ - --_-
non-woven filter fabric, to provide' silt and sediment removal
from storwater prior to discharge to appropriate drainage
area.
POLLUTION PREVENTION NOTES
1. Solid waste: collected sediment, asphalt and concrete millings,
floating debris, paper, plastic, fabric, construction debris and
other wastes must be disposed of properly off-site and must
comply with MPCA requirements.
2. Hazardous materials: oils, gasoline, paint, and any hazardous
substance must be properly stored, including secondary
containment, to prevent spills, leaks or other discharge.
Restricted access to storage areas must be provided to prevent
vandalism. Storage and disposal must be in compliance with
MPCA regulations.
3. External washing of trucks or other construction vehicles is not
allowed on site. No engine degreasing is allowed on site.
4. No concrete washouts are allowed on site.
VEG/TAT/ON GROUND COVER SCHEDULE
1. Permanent turf ground cover shall include all disturbed areas be
covered with a minimum 4" topsoil and sodded or seeded as
allowed by City, or as proposed on City approved landscape
plan for the project.
2. Temporary ground cover shall be MnDOT seed mix 150 shall be
applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied
at 2 tons/ac and disc anchored in areas not covered by sod
or erosion blanket.
3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200
lbs/ac. Disc fertilizer into top 3" of soil. Specification
reference is MnDOT 2575.
4. Dormant seed mix shall be used after November 1 or when
temperatures do not exceed 40' F, using some rates specified
above. No seed shall be placed on snow or ice greater than
2" in depth.
5. Any seeded areas that do not become established with
vegetation shall be reseeded at Contractor's expense.
6. Erosion blanket shall be installed in seed areas with ground
surface slopes of 5H:1 V or steeper.
RECEIVED
JUL 26 2016
CITY OF ORONO
0 20 40 60
GRAPHIC SCALE IN FEET
Survey Data By:
Lot Surveys Company
7601 73rd Avenue North
Minneapolis, MN 55428
763-560-3093
GENERAL GRADING NOTES:
1. Specifications applicable for this project: Current standard
specifications for the City of Orono; the latest Minnesota Department
of Transportation Specifications for Highway Construction; and all
NPDES requirements except where modified by these documents.
2. OSHA requirements shall be followed for all work on this project.
3. The Contractor shall notify "Gopher State One Call" 48 hours prior to
any excavation (1-800-252-1166.)
4. The Grading Contractor shall verify all locations and elevations of
underground utilities with utility companies prior to any construction,
and immediately notify the Engineer of any conflicts.
5. Final Plat shall govern for easements and lot dimensions.
6. Any erosion control items necessary to protect adjacent properties shall
be constructed prior to the start of excavation or grading work.
7. Erosion control maintenance shall be performed by the Grading
Contractor, and removed -as per the, Contract Documents or as
directed by the Owner, followed by all necessary restoration of
disturbed area.
8. The Grading contractor shall provide positive drainage on the site at all
times. Grading tolerances shall be 0.10' for hard surface areas.
Grading tolerances for the remainder of the site shall be 0.25'.
9. The Grading Contractor shall keep public streets, parking lots, and
travel ways clear of soil and debris. Daily cleaning at the
construction entrance shall be performed, especially at the end of
each day's work.
EROSION CONTROL. INSTALLAT ON SCHEDULE
1. Silt fence shall be inslalled or restored prior to any construction- Silt fence
shall be located as shown to intercept runoff. The area located beyond the'
perimeter silt fence shall not be disturbed during construction.
2. Rock Construction Entrance shall be installed prior to grading operations.
3. All storm sewer inlets shall have inlet protection inserts installed.
Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter"
inlet protection devices as manufactured by WIMCO (or approved equal)
and installed per manufacture's recommendations.
4. All erosion control installations shall remain in place and be maintained in
good condition by the contractor- until the site has been re -vegetated, at
which time it shall be removed by the contractor. For proposed paved surface
areas, the contractor may remove necessary silt fencing to construct roadway,
while maintaining adequate erosion control in adjacent areas.
5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil
for disturbed areas to be re -vegetated.
6. The contractor shall schedule site grading, utility installation and site
construction so that the general site can be mulched and sodded or
re -seeded as soon as possible soon after disturbance. Areas that will not be
subject to construction traffic shall be seed and mulched or sodded within 72
hours of final grading.
EROSION CONTROL MAINTENANCE SCHEDULE
1. Erosion control measures shall be inspected by the contractor's representative
and maintained by the contractor every Friday and within 24 hours after any
rainfall event larger than 1/2" until the project is completed. Maintenance
requirements are as follows: silt fence - 1/3 height of fence or damaged,
remove sediment and/or repair fence within 24 hours; rock entrance -
refresh as necessary to conform to detail; inlet protection inserts - remove
sediment after each rain event, clean or replace filter when clogged; surface
water - drain and stabilize, within 72 hours of discovery; street sweeping -
remove all sediment tracked onto paved surfaces within 24 hours or as
directed by City Eng'neer.
2. Replacement - Fabr'c shall be replaced promptly when it decomposes or
becomes ineffective before the barrier is no longer necessary.
3. Any sediment remaining in place after silt fence is no longer required shall be
dressed to conformw` h the existing grade, prepared, and seeded with
appropriate seed mix, s directed by the engineer.
4. Removal of the silt f ce- Silt fences shall be removed when they have
served their useful p ose, but not before the upward sloping area has been
permanent'.' :-zed
zed
RESPONSIBLE PARTY
Contact information for tr responsible party for erosion
control is:
CITY DESIGN + BUILD, LL - General Contractor
Erich Hostreiter - Project oordinator
612-886-3560 phone
erichOcityhom esll c. com
CLIENT:
CITY
HOMES
DESIGN + BUILD, LLC
4220 Crocker Ave
Edina, MN 55416
952-920-8250
Z
6 Ca
Q
> 0
a
Q
C4
J
C0
cc
CX
U
(J)
O
O
O
O
_/
O �
O
w
N00
o
aqi
14
N 0)
cC,o,
�i�IQ ��E
° 4c
GLS �coU I o
�
o
�' V' A In
Imo
� W I �m 0�`U
c
o�� +
W[�Ilao� 3
�~ WW�ai3
Q j
C� Jr�l
Cp o f
`° Lr�
o
O J
_
w
rJ
m
4-- o o a)
p°
a
J
U
co
Q II
U
,c
Q)
0
U
Ul
o
W
Q x
p N
0
Q N x
ti
ai
"
o II U,
Z
I
N
�P�l
_��
oc
O
co
C)
C�
4
m
m
o
m
W
a
Lij
�
Z
v
LLJ
O
O
O
U
FILE NO.
00606
Erosion
Control Plon
rpous top,