My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00903 - roofing
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
4220 Sixth Ave N- 31-118-23-12-0015
>
Permits/Inspections
>
2010-00903 - roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:52 PM
Creation date
2/13/2019 12:31:35 PM
Metadata
Fields
Template:
x Address Old
House Number
4220
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
4220 6th Avenue North
Document Type
Permits/Inspections
PIN
3111823120015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO PERMIT NO.: 2010-00903 <br /> � ,.� 2750 KELLEY PARKWAY ., <br /> ORONO,MN 55356- DATE ISSUEn: 09/27/2010 <br /> 952 249-4600 FAX: 952 249-4616 <br /> ADDRESS : 4220 SIXTH AVE N <br /> PIN � : 31-118-23-12-0015 <br /> LEGAL DESC : WINTERS PLENTYWOOD <br /> : LOT 001 BLOCK 001 <br /> PERMIT TYPE : MINOR ALTERATIONS <br /> PROPERTY TYPE : RESIDENTIAL <br /> CONSTRUCTION TYPE : ROOFING-ASPHALT <br /> ACTIVITY : O/S BUILDING-LJNDEFINED <br /> VALUATION : $ 3,800.00 <br /> NOTE: TEAR OFF REROOF <br /> APPLICANT pERMIT FEE SCHEDULE 103.25 <br /> VERDE RESTORATIONS STATE SURCHARGE(VALUATION) 5.00 <br /> 553 S. ROBERT ST <br /> ST. PAUL,MN 55155- MISC FEE 0.00 <br /> (651)290-2222 TOTAL 108.25 <br /> OWNER <br /> HANNING,ROBERT&JULIE <br /> 4220 SIXTH AVE N <br /> LONG LAKE,MN 55356 <br /> AGREEMENT AND SWORN STATEMENT <br /> The work for which this permit is issued shall be performed according to <br /> the approved plans and specifications,applicable City approvals,and the <br /> State Building Code. This permit is for only the work described and does <br /> not grant permission for additional or related work which requires separate <br /> permits. All provisions of laws and ordinances goveming this type of work <br /> shall be compied with whether or not specified herein.This permit will <br /> expire and become null and void if construction authorized is not <br /> commenced within 180 days of the date of issuance,or if construction is <br /> suspended for a period of 180 days at any time after work has commenced. <br /> The applicant is responsible for assuring all required inspections aze <br /> reques d in conformance w' Building Code.This pe it may be <br /> oke at any tim or du cause. <br /> ' � 9� �7� io <br /> Applic t Permitee Signature te Iss d By Signature Date <br /> SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.