HomeMy WebLinkAbout2010-00656 - sport court CITY OF ORONO PERMIT NO.: 2010-00656
2750 KELLEY PARKWAY
1 ORONO, MN 55356- �ATE IssuEn: 08/30/2010
` (952) 249-4600 FAX: (952) 249-4616
ADDRESS : 3060 SIXTH AVE N
PI�1 : 28-118-23-32-0014
LEGAL DESC : LESLIE ADDN
: LOT 001 BLOCK 001
PERMIT TYPE : ZONING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : SPORTS COURT(DON'T USE< 120 SQ FT
NO"1'F,: ESCROW PERMI"I'#:2010-00657 $2500.00 YD BY CI IECK ULTIMATG RGSTORATION
ESCROW FEE FOR:EROSION CON1'ROL&ENGINF,ERING RF,VIEW COSTS
SITE INSPGCTION TO BE DONE BF,FORE WORK STARTS
LOCATION OF SPORTCOURT SHOULD BE STAKED WITtI CUT&FILL INDICATED AND EROSION CONTROL MEASURES IN PLACE
APPLICANT STRUCTURE PERMIT 50.00
SPORT COURT OF MINNEAPOLIS TOTAL 50.00
1301 E. CLIFF ROAD SUITE 104
BURNSVILLE, MN 55337-
OWNER
KOSEK, CHRISTOPHER& HEATHER
3060 SIXTH AVE N
LONG LAKE, MN 55356
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be perlormed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires scparate
perm' . II provisions of laws and ordinances governing this type of work
sh be c mpied with w et er or not specified herein.This permit will �
e ire an become null n void if construction authorized is not
mmen d within 18 a of the date of issuance,or if construction is
uspend for a perio f 0 days at any time atter work has commenced.
he app can[is resp ib for assuring all required inspections arc
request d confor ce ith the State Building Code.This permit may be �G�%
revoke t a y time o d e cause. ����J�/
> �
�- / / �� ', r.�:,, / /
App �cant Permitee Signature Date �� ��"� '"�?����`�
Issued By Si ature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
�- ��� �
�I�O
� City of Orono ��
�
~ Zoning Permit Application
MailingAddress: Permitnumber: a0/D-�(o r7 (�
�v�,�\ PO Box 66
� .�;;.;,�„ 0
Crystal Bay, MN 55323-0066 Date received: � �j J �
a � s, StreetAddress: Escrowamount: D0,00 aO►p-DD �
,� ,�;t";,
� ���Gti�' 2750 Kelley Parkway Permit Fee: � ^T�Q _
�9kEsxo4`' Orono, MN 55356
Received by: �
Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us
This application form must be completed in full and all required information must be submitted. /ease print.)
GENERAL INFORMATION:
Job Site Address: �D�a Cou n-!`'u ��� � , DI'bno� m� ,Su�3.�
CONTRACTOR/APPLICANT INFORMATION:I
Name: S��* Cou+^f
Phone: Fax:
Address: ,� E� C i v' �� Cit : �.� �� �lll-C, ZIP:S�, , r)
Contact Person: �i��in � a.,�- ContacYs phone number �'oZ- 7S/� - tfS�/,�
Email Kevi� a� s�z✓f'ec�rf��„�, Applicant is: Contractor Homeowner (Circle One)
�o m
PROPERTY OWNER INFORMATION:
Name: C�rr'r p� y�e�- karcl�
Phone (day): ��a.- a8a- 43c�
Mailing Address: �U a ¢ o�( G pro r,o r? ZI P: $'
Email and/or Fax �hy�;� � � �j n , �Jr-�,-�
Overall Project Description:
Z�o/ 1� �{4 ' s��- Qo�✓�- � Y� tQXI CQ.
Check TYPE OF PERMIT COST
Box
Residential Dock- Permanent dock on any lake or initial seasonal dock not on $30 +engineering review
Lake Minnetonka ermanent dock re uires CUP costs
Commercial Dock $50+ engineering review
costs
Escrow for erosion control and engineerin review costs $2,000
Minor Land Alteration (grading, filling or excavating)-500 or less cubic yards $50+ engineering review
outside of lakeshore setback or less than 10 yards in lakeshore setback costs
Escrow for erosion control and en ineerin review costs $2,000
Major Land Alteration (grading, filling, or excavating) more 500 cubic yards or $30
more than 10 cubic yards in lakeshore setback (also requires CUP)
Escrow for erosion control and en ineerin review costs As determined b CUP
Stairway to Lake $50+ engineering review
costs
Escrow for erosion control and en ineering review costs $2,000
Retaining Wall not requiring a building permit (A building permit is required for any $50+engineering review
retaining wall that measures more than four feet from bottom of footings to top of costs
wall. Tiered retaining walls are considered one wall unless the walls are separated
by twice the height of the lower wall.)
Escrow for erosion control and en ineerin review costs $2,500
Tree Removal or intensive vegetation removal in 0 to 75 foot zone No char e.
Structure Permit for other structures not requiring a building permit but regulated $50+engineering review
� by the zoning code (including, but not limited to accessory building of less than 120 costs
square feet, detached deck or platform and sport court)
Escrow for erosion control and engineering review costs $2,500
(over)
APPLICAI�T/OWNER ACKNOWLEDGEMENT:
• Agrees to provide all information required or requested by the Planning Department;
� Owner agrees to pay the City of Orono for engineering consultant review costs where applicable;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant
recognizes that they are solely responsible for submitting a complete application being aware that upon failure to
do so, the staff has no alternative but to reject it until it is complete;
• Acknowledges the attached Escrow Agreement is completed and signed by Owner;
• Some or all of the information that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to
the subject of the data. Confidential data is information which generally cannot be given to either the public or the
subject of the data. Our purpose and intended use of this information is to annually update our records and records
of other governmental agencies required by law. If you refuse to supply the information, the application may not be
issued.
The undersigned certify that the information supplied is true and correct to the best of their knowledge.
Applicant's Signature: � '' Date: �'�' �D//�
Property Owner's Signature: �''� Date: j� 3���l v
TYPE OF PERMIT: SUBMISSION REQUIREMENTS:
Except for tree removal permits, all permits require a completed application
form, escrow agreement(signed by the property owner)and escrow check
from owner,two copies of all plans, and three copies of all grading plans or
surveys/site plans
Residential Dock Seasonal Dock—survey showing proposed dock
Permanent Dock-plans as approved by CUP and copy of LMCD permit
Commercial Dock 1. Structural plans for the dock
2. Survey showing the proposed location of the dock
3. Copy of LMCD permit
Minor Land Alteration 1. Grading plan including existing and proposed contours
(Less than 10 cu.yds. within 75'of lake 2. Amount of fill to be imported and/or exported and haul route
or less than 501 cu.yds elsewhere.) 3. Amount of earth to be moved around on site
4. Erosion control plan or copy of MCWD Erosion Control Permit
Major Land Alteration 1. Plans as approved by Conditional Use Permit
2. Erosion control plan or copy of MCWD Erosion Control Permit
Stairway to Lake 1. Construction plans for stairway
2. Topographical survey of property with proposed stairs drawn in.
3. Erosion control plan or copy of MCWD Erosion Control Permit
Retaining Wall 1. Plans for wall(s)
2. Unless repair or exact replacement of existing wall, grading plan including
existing and proposed contours
3. Hardcover calculation worksheets if in shoreland district
4. Erosion control plan or copy of MCWD Erosion Control Permit
Tree Removal Call 952-249-4600 to schedule inspection.
Structure Permit 1. Plans for structure.
2. Survey of property with proposed structure drawn in and with setbacks to
property lines, other structures on property and the septic system indicated
.The general location of any sewer and water services should be shown if
applicable.
3. Grading plan if grading is required
4. Hardcover calculation worksheets if in shoreland district
5. Erosion control lan or co of MCWD Erosion Control Permit
Last Updated: July,2010
. Plan Review Checklist for New Structures / Additions
Address/ PID/ Legal: � lp� s �� .
Description of work: (/!' �(
Septic review by: V"v Date Approved: ���
Zoning review by: �� Date Approved: �
Building review by: /�/a Date Approved:
Grading review by: S�G !'ilrt?�1��' Date Approved:
Zoning File#: Resolution#: Resolution Date:
Zonin District Fire Department Post Office School District
r 1 /.J
Zoning: Lot Area: � • 1 14 SF/AC Width: 27� � Depth: 5���
Survey Submitted: [�es 0 No Date of Survey: �6�;�j
Pro osed Setbacks:
Front(.l.�ka- Rear(Street) ( N S � W ) ( N S E � Other Buildings Wetland
Si e Side
b�.hi� � l � /� � !OD _ YI,q- 84 r�n.
Building Defined Height: Building Peak Height: #of Stories Ok?: [� YES
FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUND .
STA the distance between the basement floor/crawl START the dista etween the slab and the highest
oor and the highest roof peak,the top of WITH r eak,the top of the cornice of a flat roof,
the cornice at roof, the deck line of a the deck line of a mansard roof, or the
mansard roof, or the ost point on a round uppermost point on a round or other arch-type
or other arch-t e roof roof
SUBTRACT half the distance between the highest in SUBTRACT half the distance between the highest window
hi hest roof eak of a itched roof and hi hest roof eak of a itched roof
SUBTRACT the distance between the ment floor/crawl ADD the distance between the slab and the highest
space floor and th est existing grade within ' � rade within the foundation
the founda � or 10 feet, whichever is less. EQUALS Defined hei ht
EQUALS De buildin hei ht
Lot Co ge: SF %
Shoreland District MCWD Permit Received Avera e Lakeshore Se7back Bluff
� Yes 0 No N/A 0 Yes ❑ No
� Yes q/I�lo � Yes 0 No 0 N/A
Permit Number: Setback:
Hardcover Zones Existin Proposed Variance Required CUP Required
0-75' 0 Yes 0 No 0 Yes ❑ No
75-250' Type(s): Type(s):
250-500'
500-1000'
REMARKS (in-house): G V t � [�� �i�l t��`1�l�'�'1C�. � � � Cc�'1" � I � �,I�
F'10 bou�c�,p,�S (�,y � Y�1 C� �
Updated: 09/11/2009
z:\forms\plan review checklist.docx
Fees to be Charged YES NO
Permit '
Plan Review ,
State Surcharge
Investigation Fee
SAC— Number of SAC Units
Sewer Connection
Water Connection
�ark Fee
Site Inspection
Other(specify)
Miscellaneous Fees
Calculated By:
Square Foota e $ per Square Foota e
Basement X = $
1St Floor X = $
2nd FlOor X = $
Garage X = $
Estimated Construction Value: $
Orono Inspections Required Work Requiring Separate Permits Required State Permits
Site �g� 0 Plumbing 0 Grading / Filling � Well
� Hardcover Removal 0 Mechanical � Fire 0 Electrical
� Footing � Septic � Water Connection
❑ Poured Wall � Fireplace � Sewer Connection
� Foundation Survey 0 Masonry 0 Lawn Irrigation
� Radon Rock Bed 0 Mfg.
0 Framing � Other(specify)
0 sulation
s-Built Survey
�Final
� Other(specify)
REMARKS (in-house):
Other Review: Reviewed by: Date Approved:
Access:Existing: 0 YES 0 NO New: � YES 0 NO
REMARKS (TO BE NOTED ON PERMIT AND INITIALLED BY P RSON PULLING PERMIT)
s t-� ��s �c h c�, (o-e.� c�c�c_ �e. c�.x�k ��(
�o c�l�cr�, o� �-cov✓� 1�1r,,, I�. �-K1kQ w► � �-�� i n d i c�
-� Av�el �ros cc�, c.r.�,hro l r��we.� �K pc,�c�
Updated: 09/11/2009
z:\forms\plan review checklist.docx
. �� �
� � ,� ; ,�`•,�. 1 1 � � � � � I 1 �....
I ` �
� �1 � �s...' , , , •,
�I�.. � � '��._.;�'�, � i � � 1 } i ��400.4, i, `\ r ` � `� i�-.
, -- -_... � a i � ' ,�, ,
� ----� =----`---'---�---r--=---�--- ---------------------`-�c-------�-----`*'-1 1
-� a � '..f--� : , r
3 i � 3 i ',11 i � I � � ' ' ��
I � 1�n'nrr�r� _ ; I
i �i !! � ' � � � -�.•�yrY� 1
l
� � �., � p;' ;� i ; %�3 a� ; '+k
r• i�, ♦� � i � � '��/ �
� a �i�� S� e.�`�'. i :�1 i i � i't I
� �'�. � i j � � �
� � � > � �` �� ��� � � i 1 ���`� '.�� � � � ' �i
, �. �'�. � �' � : ; i � � �/' }� i ' � �
i i j I '.
a ��, � '� '� �' �I � d'
....... • �' '
�
�
l .
.
9 i i �` i � �7�' � `I � ' I � + }i ���1
I >
■ \ ' . i.�W.
� I I ` � r �� � j I. ;''
i � i � i ( � i
�I � � � j \��:•��4�.\\,���• 11�` ���', ����'•' � � ; \ I � �� � - _"_� -�� '� �i �:-
♦\\ � �
i �\ . � I 1 '� �;' ;� j , �� ' 1 ' a, � '
i � a � a �`��4 .i.\\� ' � ��{y ' I � :f
•,.�1�. ,',�,�. � ' �lgS �� \�1 yy;, � ` j �'', �I
, � ���,.��` '. °►Y G� � �,y •,� ' � ; �`� l
�
a � � ��,� _,j• � ��\'s-.., �•,) �\ � ���1 � �',, ' ; � i:
> >'.._.j � ♦ � � � � r � ����
a > s i � � ��'\` `.' �� ��� 1. , -�••�':-,•-,�i .;�i
� � ��� � 3���t•.` ���� ��� w��``.� ; � '��'� �i ��1
� � r � \> > 1 > `'' . \ '.'.. . �', `', `' %1:' �
• ,` � ` �\\ ! Y ,p�. +�� ' � � ' � _
j � � i f . ., _ ./���• ." i I I
� �y �''.c.�� � ��. � '��9 ��� i
� -� j �� a i i i `�. . Q y�.`'�,, ., .\1�`�,�',. ^� _ ' i '��F�� � I
i � -rm+oua- > � � ��-=---?�c�-- ���^=�•w..�i�w�' --' -- -'_-�-„-� �--�-�
--�_^"__ *:
i � i i � s a � � , s � . . . . . . .�.mP�.W M'. �. . . , � . . . , � ■
�_
i i � i i 9 � � � e�
� � � � � � � . 4
� � � � i
j I i �
dd6d eG d � dddd�d � d �E
.1t�irir if � = Sl#�'21'A'$ i� SI' �
� �_�� � � � �����F � �
� o !
� �
� �
° � � � � � �
� �� � � � 4� = � �
���� � � �1 � � ° �
� � x �� � � � �
�� ���� �� �.,�� � �
�� � 'B �i �'�� � �j
�g � � ��� ��� ��` � � �
r �' ��' �9 �'�a]�� a P ai
�� � }$�7 ;�i��p��i .�� � �� �
� � }(( �
�! � � �� 1b�� b�� �j � :
� "' ���� �e�i����� a� � ��� �. i
r �� w � ��,� ����g'�� e� � ��� .
,� , �. � �� 6a� ; ;! � �. -
� � � � ���� ��I°���;$b�; ���
y� � � € � �
� � i��.g " ��t � u�� $ j�� .
� V,� . z� � p�7 ��. �a�g��� � g � a
n �� � � �����,� ��� Li� d ��� �
� j b� , i= �.�5 �
� �� s �r��,������������ ��
e r
� •
• • ♦ � •
/ • �
emo
To: Finance Department
From: Christine Mattson, Planning Assistant
CC: Street Fite
Date: 8/10/2011
Re: Building Permit Escrow Refund
Building Perrnit #2010-00656 pertaining to 30360 Sixth Avenue North is complete. The
Applicant, Christopher& Heather Kosek, has requested a refund of the$2,500 escrow.
The following is attached:
• Escrow Refund Request
• Email from Bonestroo indicating no unbilled WIP on this project
• Email from Campbell Knutson indicating no unbilled WIP on this project
• Original signed escrow agreement
• Copy of cash register receipt showing escrow amount received
Check should be mailed to:
Christopher&Heather Kosek
3060 Sixth Avenue North
Long Lake, MN 55356
w:�street files�sixth avenue�3060�escrow refund memo 2010-00656.doc
August 2, 2011
City of Orono
Planning and Zoning R�`C�/v
Attn: Chris Mattson �`�
PO Box 66 A(/�, 0 �
Crystal Bay, MN 55323 C� Z�J�
RE: Return of escrow funds ��F�R4N
O
Balance due $2,500
Dear Chris Mattson:
Last fall Sport Court of MN put in a Sport Court at our property 3060 County Road 6,Orono,
MIV 55356. Permit number2010-00657, I am requesfing the escrow funds of$2,500 now be
refunded to me. If you have any questions please feel free to contact me at 612-282-9934 or at
952-476-6006.
Your prompt attention to this matter will be appreciated.
Thank you,
Christopher Kosek
3060 County Road 6
Orono, MN 55356
chrisk(a�urimn.com
1
Christine Mattson
From: Darren Amundsen [Darren.Amundsen@bonestroo.com]
Sent: Thursday, August 04, 2011 2:50 PM
To: Christine Mattson
Subject: RE: Unbilled WIP
None here
Darren Amundsen, PE
Associate
Direct 651-604-4894
Cell 651-775-5623
darren.amundsenC�lbonestroo.com
.�''�3t?�`1�5tf 00
From: Christine Mattson jmaiito:CMattsonCa�ci.orono.mn.us]
Sent: Thursday, August 04, 2011 1:58 PM
To: Darren Amundsen; 'Sherry Charboneau'
Subject: Unbilled WIP
Hello
Any unbilled WIP for 3060 Sixth Ave North; building permit 2010-00656, Christopher Kosek?
Thanks!
Christine Mattson
Planning Assistant
City of Orono
2750 Kelly Parkway i Orono � MN ; 55356 (physical addressJ
PO Box 66 � Crystal Bay ; MN i 55323-0066 (mailing addressJ
`r? 952.249.4620 � g 952.249.4616
� cmattson@ci.orono.mn.us ; �www.ci.orono.mn.us
Office Hours(Monday, May 23rd to Friday,September 2nd):
Monday-Thursday 7:30 am to 5:00 pm
Friday 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday,September 5,2011
1
Christine Mattson
From: Sherry Charboneau [SCharboneau@ck-law.com]
Sent: Thursday, August 04, 2011 2:07 PM
To: Christine Mattson
Subject: RE: Unbilled WIP
Nothing for Campbell Knutson.
Sherry L. Charboneau
Legal Assistant
CAMPBELL KNUTSON P.A.
1380 Corporate Center Curve•Suite 317• Eagan,MN 55121
'� (651)234-6230•Fax:(651)452-5550
�scharboneauCalck-law.com•www.ck-law.com
From: Christine Mattson jmailto:CMattson@ci.orono.mn.usl
Sent: Thursday, August 04, 2011 1:58 PM
To: Darren Amundsen (darren.AmundsenCa�bonestroo.com); Sherry Charboneau
Subject: Unbilled WIP
Hello
Any unbilled WIP for 3060 Sixth Ave North; building permit 2010-00656, Christopher Kosek?
Thanks!
Christine Mattson
Planning Assistant
City of Orono
2750 Kelly Parkway � Orono ', MN � 55356 (physical address)
PO Box 66 ; Crystal Bay ; MN 55323-0066 (mailing addressJ
`I�' 952.249.4620 '. 6 952.249.4616
� cmattson@ci.orono.mn.us !, ;www.ci.orono.mn.us
Office Hours(Monday,May 23rd to Friday,September 2nd):
Monday-Thursday 7:30 am to 5:00 pm
Friday 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday,September 5,2011
1
/
� , ZONING PERMIT ESCROW AGREEMENT
` Orono Zoning Permit# '�p�0—�e�oS lo
AGREEMENT made this 3 day of f�u u-�' , 20�D, by and betwe n the CITY OF ORONO,
a Minnesota municipal corporation ("City")and � r.�s �''- �l/$„�����s�� ("Owners").
Recitals
1. A building permit application has been filed for a zoning permit for a property located at
_3d�a �fzj�[ (o the ("Subject Property"), legally described as �.���C,I��� (.�S(; ���;,n ,
Hennepin ounty Minnesota.
2. Owner requests the City to review this application.
3. The City will commence its review of the application and incur costs associated with said review
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit $o?�Soo•°� with the City. All accrued interest, if any, shall be paid to the
City to reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering or legal consultant review) or will
incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible
for under a zoning permit application. The escrow will also guarantee reimbursement to the City for all out-of-
pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater
Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be
used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to
public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant
review) associated with zoning permit # if compliance with the approved zoning permit is not
accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bilL
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make
payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay
all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval of the
Owners to reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the
Owners when the review has been completed and written notification is received from the Owners requesting the
funds.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the efigible expenses
incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the
subje operty pursuant to Minn. Stat. §§415.01 and 366.012.
CITY:� CI OWNER:
—_
By. r � ��
its:
1
i . " i � � . . . . �
Gi�}� G� UY"'?Ytt� I
! [���°�) ������ !-�d°rHtse;r ?
�Ct'i�i'sG �'roi �w:?� '�;;,•"•--c'���—�f�t�; ;
; Ne�'��.f)�: f�C� � ::'•.4"''��'.; �:j�,Q r,t ,r,a�'
I � �i:jO�r. . � .. . � . �i
7
I
i Y`E'tE��1L �, ,
i cl�i�+ thU���;� �.�b4 ..i11(�. ,�it i_„�t;Ue��'
�. fi, i
:�Jt-�2u�
�l2fet�%^EtS Rei�—,�!�c�c•jra�F=4' i1t���G�a�u
i,.tt;d1: -�._.:�,`:i3t`"t,i}1} i
tfr�Cit -- ___wc._� � '
�� , nz � � �
u1���:r, l�L�; c�tL�., �„5(.i(:,�(+
� ���'��n ' ;
a.i��zt�ae� R��ar�;�ion i��icpk 1
�l}4rii. �g���1�'�: �',,.tJ'v.;��
i.;ia-t��r ie:�ierec: __,�__...__.__��,_
r�%;�.a'�.n �4:�;7f��?
! i
,
Checklist for Refunding Building Permit Escrows
Building Permit # �l� - 6�(v5�p
Street Address ��p� �Si �'1., �- IJ
Applicant Name: I�`
� Escrow req uest received Date: �'�'� ��
(to be comp/eted by arb)�
Are all inspections completed? Yes No
If not, list what is outstanding:
Was there a Temporary Certificate of Occupancy issued? Yes No Date:
Was there a Final Certificate of Occupancy issued? Yes No Date:
�6� V�e►o C� (� CO�u� �
�� � �
Email CK & Bonestroo to see if there is any unbilled WIP. Date email sent: �•�{' ( �
❑ Prepare memo for Finance Department
❑ Note amount refunded in program.
z:�forms�zoning standard forms\checklist for refunding building permit escrows.doc
December 23,2010