My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: city sewer
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2060 Sixth Ave N - 27-118-23-31-0002
>
Correspondence
>
Re: city sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:34 PM
Creation date
1/16/2019 2:22:46 PM
Metadata
Fields
Template:
x Address Old
House Number
2060
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
2060 6th Avenue North
Document Type
Correspondence
PIN
2711823310002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w ' � s ' � 6 � Sl>C�l� l�U P f�h <br /> . C� <br /> ��,:. <br /> ,� � °� � � �, � . <br /> , ����,, . <br /> �� O��_ - O ,,, <br /> �, ,� �;:;��:��� ,� ;,��� CITY of ORONO <br /> � �,. �: ��.-�-___�- �,, <br /> �� Fr.'��-' .'� 1 ,�, i; MllIIIG� ��}10ES <br /> ._�;;��:.,�, G ;,, <br /> �9` � . : g� Street Address: Mailing Address: <br /> kE$fI0 % 2150 Kelley Parkway P.O. Bax 66 <br /> Omna, MN 55356 Crystal Bay, MN 55323•0066 <br /> October 21, 2003 <br /> Dear Nei�hborhood Residents; <br /> A pressure se«-er system is currently bei.na installed in your neighborhood. This sewer system is <br /> available for hookup by neiahborhood residents on a voluntary basis at this time. You can continue <br /> to use your eYisting septic system until the s�-stem fails or is required to be replaced because of it's <br /> nonconformina status. The present deadline for the replacement of non conforming septic systems <br /> is 2010. A conforming septic system can continue to be used until it either fails or is rendered <br /> nonconfonning b�- future septic regulations_ <br /> The se«-er connection fee is currently 58,�00 and will be adjusted for inflation on an annual basis. <br /> This connection fee can either be paid before connection to the sewer system or be assessed over a <br /> 1�-y-ear time period at a 6.2�%annual interest rate.A signed assessment waiver will be required if <br /> you request to be assessed for the connection fee. <br /> In addition to the connection fee,there is a onz rime SAC fee of$1,27�.This SAC fee increases on <br /> an annual basis and is payment for the addiuonal costs of the future downstream capacity in the <br /> Metropolitan Council Sewer System. <br /> This pressure se�s-er system requires that each property owner install and maintain their own <br /> indi�•idual�rinder pump station. A"proQressiz-e cavity"grinder pump will be required,and the City <br /> needs to approi-e the pump that will be install� to ensure compatibilit}�with the sewer system. The <br /> estimated propem- owner costs for the grindzr pump station, service connection, and septic tank <br /> abandonment can range from 57,000 to 512,000 depending on the lenath of the service connection <br /> required. The Cit�•'s current flat rate user chaTIIe for residential sew-er is approximately $90.00 per <br /> quarter. <br /> Paae 1 <br /> Telephone(952)?.-�9—�600 • Fax(952)249-4616 <br /> ww�.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.