HomeMy WebLinkAboutReport of project testing services 1 , AMERICAN ���`���� � CONV RONMENTAL � E�GINEERING � � �O� • GEOTECHNICAL TESTING� INC. P�G w\o • MATERIALS � �� O� ORO`v • FORENSICS �� REPORT OF PROJECT TESTING SERVICES PROJECT: REPORTED TO: TRINITY LUTHERAN CHURCH ADD]TIONS ARCHITECTS REGO & YOUNGQUIST 2060— 6T'' AVENUE NORTH 7601 WAY"LATA BOULEVARD LONG LAKE, MINNESOTA SUITE 200 ST. LOUIS PARK, MN 55426 � � a 5�� ATTI�1: MR. LOREN MORSCHEI�' AET PROJECT NO: 20-06374 (;� ��� CC: JAMES STEELE CONSTRUCTION ATTN: TlM SACK CITY OF ORONO DATE: AUGUST 9. 2007 ATTN: W]LI.IE GIBBS INTRODUCTION This report summanzes the results of the project testing services we have conducted for the referenced project in Long Lake, Minnesota for the time period of August 24, 2006 tllrough July 25, 2007. Our services were performed as authonzed on September l, 2006, by Loren Morschen of�Architects Itego & Youngquist, Inc. Our services were conducted on a will-call basis. The scope of our work included the following: • Observing the soils present in the mass excavation for the building addition. • Performing compaction tests in fill placed in the building addition. • Observing the reinforcing steel placed in the structura] foundation elements of the building addition. • Performing on-site testing of plastic concrete. • Performing compressive strength testing of concrete cylinders. • Observing the construction of portions of the masonry walls for the building addition. • Performing compressive strength testing of masonry corefill grout "prisms". • Observing welded and bolted connections for the structura] steel frame and roof decking. � SummapZln�h15YRScOr�f�h��attn2fl�eQeZSfodG��ekL"epfin�[iil,�.�'ii�ho��}'�tSM1"a[SpTd"iaQdf7imerican Engineering Tes6ng,lnc. 550 Cleveland Avenue North• St. Paul, MN 55114 Phone 651-659-9001 •Toll Free 800-972-6364• Fax 651-659-1379•www.amengtest.com Offices throughoul Florida,Minnesota,South Dakota 8 Wisconsin AN AFFIRMATIVE ACTION AND EQUAL OPPORTUNITY EMPLOYER AET Project No. 20-06374 — Page 2 of 8 PROJECT INFORMATION The addition was constructed to the north and east sides of the existing Trinity Lutheran Church building. lt is a two story structure covering a footprint of about l 1,500 square feet, with floor elevations matching the existing building. The addition is supported on conventional spread footings designed using an allowable soil bearing pressure of 2,500 pounds per square foot (ps�. The addition is constructed with masonry bearing walls, structural steel framing, and with steel or wood roofing systems. The site work consisted of new bituminous pavement south and east of the existing building. We understand the bui]ding addition was constructed according to applicable building code requirements. BACKGROUND INFORMATION A geotechnical exploration program and analysis was performed for this project by AET. The results were presented in our Report of Subsurface Exploration and Geotechnical Review, dated January 6, 2006 (AET Project No. 01-02675). ]t was recommended in the repori that, after proper site preparation, the proposed building be supported by conventional spread footings designed for a maximum net allowable bearing pressure of 2,500 psf. AET recommended in the report that site preparation for the entire addition footprint consist of excavation of all existing fill and topsoil. lt was recommended in the report that fill required to achieve design grades beneath footing and slab areas be granular soil. Refer to the Report Subsurface Exploration and Geotechnical Review for more detailed information about the soil conditions and the recommendations for building support. AET Project No. 20-06374 — Page 3 of 8 SOIL OBSERVATIONS AND TESTING Excavation Observation and Results Personnel from AET performed observations and testing of the soils in the mass excavation bottoms for the entire building addition footprint. The results of these services were provided in ' our Report of Excavation Observations and Compaction Testing, dated September 27, 2006. Briefly, that report states that the soils observed in the bottoms of these excavations should � provide adequate suppori of the fil] and structural loads. Reference should be made to that report for more details about the soil conditions; our observation techniques, and the results of our , observations. Compaction TestinQ Results AET personnel have performed compaction tests in fill placed during building addition construction. The results of these field density tests were compared to the laboratory Standard Proctor maximum dry densities (ASTM: D698) far different soil types to calculate the compaction levels for each test. The results of our compaction tests were presented previously in our Report of Excavation Observations and Compaction Testing, dated September 27, 2006. In summary, the soils at the locations and elevations tested were compacted to levels that should adequately support the structural building loads REINFORCING STEEL OBSERVATIONS Prior to placement of concrete, AET personnel observed the reinforcing steel present in the footings for the building addition. Our observations were performed on a will-cal] basis, when requested by the contractor. During our observations, we judged the following items for confonnance to the most current structural drawings available at the project site: AET Project No. 20-06374— Page 4 of 8 • The conditions and dimensions of the various formwork. • That the proper number, size, spacing, and lap of the reinforcing steel were provided. • That proper concrete cover and support was provided between the reinforcing steel and the formwork and/or the ground surface. • That the reinforcing steel was substantially free of rust, scale, dirt, ice or other deleterious materials which will reduce adhesion with the concrete. Based on the results of our observations, it is our opinion that the reinforcing steel placed in the observed structural elements was in substantial compliance with the current structural drawings present at the site. AET does not perfonn surveying services, therefore, our observations of the reinforcing steel were based on the positioning of the formwork by the contractor. We are not responsib]e for the exact locations of the formwork. CONCRETE TESTING We performed testing of the plastic concrete as it was being placed in some of the structural elements of the building. These services were performed on a will-call basis between the dates of September 26, 2006 and April 19, 2007. Our services included the following: • Measuring the slump of the plastic concrete. • Measuring the percentage of entrained and entrapped air of the plastic concrete. • Measuring the temperature of the plastic concrete. • Casting compression test cylinders. A]1 testing was performed in general accordance with current ASTM procedures. The results of the on-site testing were presented in our Reports of Plastic Concrete Testing, which were issued under separate cover. The results of our tests generally satisfied the project specifications. AET Project No. 20-06374 — Page 5 of 8 We performed compressive strength testing of 1 ] sets of test cylinders cast by AET personnel. The results of these tests were presented in our Reports of Compressive Strength of Cylindrical Concrete Specimens. Copies of these were previously submitted under separate cover. The test results exceeded the specified 28-day design compressive strength. MASONRY OBSERVATIONS AND TESTING During construction of the masonry bearing walls, AET personnel made periodic visits to the site to perform observations. These services were performed on a will-call basis between the dates of October 9 and November 3, 2006. Our services included the following: • Observing that the proper units were used, and that the units were clean and dry. • Observing that the masonry bearing surfaces were clean before the mortar and masonry units were placed. • Observing that the spaces to receive the grout were clean before grout corefill was placed. • Observing the vertical reinforcement, including placement and alignment of bars and dowels, measuring the bar sizes and lengths of bar lap splices, and observing the clearance between bars and clearance from masonry units. • Observing the general construction practices required by the project specifications. Based on our observations, it appeared that those portions of the masonry wall which we observed during our visits to the site were being constructed in general conformance with the approved project plans and specifications. We observed several deficiencies on October 9, 2006 with the reinforcing steel placement within the masonry wall. The deficiencies observed were corrected and re-observed the same day. We also performed compressive strength testing of grout corefil] "prisms" cast during masonry wall construction observed by AET personnel. The results of these tests were presented in our Reports of Compressive Strength of Grout Specimens. Copies of these reports were previously AET Project No. 20-06374 — Page 6 of 8 submitted under separate cover. The test results exceeded the 28-day design compressive strength. OBSERVATIONS OF WELDED AND BOLTED CONNECTIONS NDT technicians from our firm observed field we]ded and bolted connections for the building on a will-call basis between the dates of February l3 and June 29, 2007. The scope of our services during these observations included the following: • Performing observations and nondestructive testing, as required, on in-process and completed field welding of structura] steel and welded attachments to the structure. This included monitoring that proper equipment, methods and materials were used for the existing conditions. � Performing visual we]d observations in accordance with the requirements of Section 6 of the AWS D1.1 Structural Welding Code (steel), Section 6 of the AWS D1.3 Structural Welding Code (sheet stee]) and/or applicable contract documents. lndividual welds were judged for quality, size and length. • Observing bolted connections for compliance with Section 9a of the "Specification for Structura] Joints using ASTM: A325 or ASTM: A490 Bolts" approved by the Research Counci] on Structural Connections. This included observing bolted connections for appropriate bolt length, washer installation and ply contact of joint; and observing that the splined end of the Tension Control Bolt (TCB) was sheared off after tensioning. • Observing stee] decking, including performing observations and testing, as required, on puddle welds attaching steel deck to the structural steel and observing that proper span, spacing, adequate support and fasteners are provided, when required. Our observations indicated that the completed field welds for the structural connections satisfied the requirements of the referenced codes and applicable project plans and specifications. AET Project No. 20-06374 — Page 7 of 8 Our observations of the bolted connections indicated that the plies of the observed connections were in intimate contact and satisfied the requirements of the referenced codes and applicable project plans and specifications. Our observations of the deck welds and mechanical fasteners satisfied the referenced codes and applicable project plans and specifications. BITUMINOUS PAVEMENT SUBGRADE We observed test-rolls performed on the subgrade for the bituminous drive and parking areas south and east of the building between July 20 and Ju1y 25, 2007. The test-rolls were conducted with a loaded tandem axle dump truck. We observed the reaction of the subgrade soils below the wheels as the vehicle made passes over the pavement areas. The results of these services were presented in our letter dated July 26, 2007. Briefly, that report states that we observed six areas of the subgrade that exhibited excessive deflection and/or rutting. We recommend subcutting the subgrade 4" or ]2", placing geotextile fabric, and placing additional class 5 aggregate base in these six areas. We did not observe the recommended corrections. CLOSURE To protect the client, the public and American Engineering Testing, Inc., this report (and all supporting information) is provided for the addressee's own use. No representations are made to parties other than the addressee. Our services on this project have been conducted to those standards considered norma] for services of this type at this time and location. Other than this, no warranty, either express or implied, is intended. AET Project No. 20-06374 — Page 8 of 8 SIGNATURES Report Prepared By: Report Reviewed By: American Engineering Testing, Inc. American Engineering Testing, Inc. Phillip C. Berg, PE Rob� . nger Staff Engineer Staff Engineer MN License No. 44978