I�larch 13, 2003
Dear Nei�hborhood Residents;
The City of Orono has selected a directional boring contractor to complete the pressure sewer
installation project in the North Long Lake East neighborhood. This project consists of
directional boring a pressure sewer line north of the existing houses, and the provision of a
service stub for each house. Directional boring of the sewer should result in minimal disturbance
to your property. The only excavations required will be at the service stub, and flushing
connection stations. These locations are circled on the attached plans. There mati- also be minimal
disturbance in the areas where the contractor sets up the directional boring machine. All
disturbed areas �vill be restored as part of this project. The project schedule is to have the sewer
installed by June 1 st.
Connection to the sewer is not required, but the system �vill be available for future hookup upon
payment of a connection fee. I'he current connection fee is $11,000 per unit. This connection fee
is updated each year to account for inflationary increases. In addition to the City connection fee,
there is also a Service Availability Charge (SAC) fee that is collected by the City then remitted to
the Metropolitan Council Environmental Services. This fee co�-ers the capital costs for additional
sewer capacity that is included in the metropolitan interceptor sewers and wastewater treatment
plants for fi.iture se�ver connections. This is a pressure sewer s�-stem, and each property owner is
required to install, operate, and maintain their own private residential grinder pump station.
The City will need to acquire a 20-:oot ��•ide permanent sewer easement acro�s your property for
the installation and future maintenance of the sewer. We would like to obtain a "Right of Entry"
to allow access on your property to complete the project construction. After the sewer is
installed, the exact pipe location«ill be surveyed and a legal description developed for an
easement document.
Paae 1 of 2
Telephone(952)249-4600 • Fax(952)2A9-4616
www.ci.orono.mn.us
f �
Please review the enclosed information and contact me at 952-249-4621 should you have any
questions regazding this project. We�w�l need to have signed "Right of Entry" documents&om
all of the property owners before cons�uction work can begin on this project. Thank you for
your assistance in this matter.
Sincerely;
U ���
Greg Gappa
Director of Public Services
Copy: Tom Kellogg, Bonestroo Engineers
Page 2 of 2