My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer info
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1405 Sixth Ave N - 35-118-23-22-0006
>
Correspondence
>
Re: sewer info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:17 PM
Creation date
1/10/2019 1:25:15 PM
Metadata
Fields
Template:
x Address Old
House Number
755
Street Name
Long Bridge
Street Type
Lane
Address
755 Long Bridge Lane
Document Type
Correspondence
PIN
3511823220006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �� � l �' � S S��--��,� . � � <br /> , � -O �,,� <br /> �� e �� <br /> � �' \� <br /> O O .. <br /> , :r;�.. CITY of ORONO <br /> � <br /> ��,', r ;G' ' ti ' hiunicipal Offices <br /> ,, ` + <br /> �� � � � �'�G~' Street Address: Mailing kddress: <br /> ��=`�1fEggOg'% 2750 Kelley Parkway P.O. Box 66 <br /> \ - - Orono, MN 55356 Crystal Bay, MN 55323-4066 <br /> I�larch 13, 2003 <br /> Dear Nei�hborhood Residents; <br /> The City of Orono has selected a directional boring contractor to complete the pressure sewer <br /> installation project in the North Long Lake East neighborhood. This project consists of <br /> directional boring a pressure sewer line north of the existing houses, and the provision of a <br /> service stub for each house. Directional boring of the sewer should result in minimal disturbance <br /> to your property. The only excavations required will be at the service stub, and flushing <br /> connection stations. These locations are circled on the attached plans. There mati- also be minimal <br /> disturbance in the areas where the contractor sets up the directional boring machine. All <br /> disturbed areas �vill be restored as part of this project. The project schedule is to have the sewer <br /> installed by June 1 st. <br /> Connection to the sewer is not required, but the system �vill be available for future hookup upon <br /> payment of a connection fee. I'he current connection fee is $11,000 per unit. This connection fee <br /> is updated each year to account for inflationary increases. In addition to the City connection fee, <br /> there is also a Service Availability Charge (SAC) fee that is collected by the City then remitted to <br /> the Metropolitan Council Environmental Services. This fee co�-ers the capital costs for additional <br /> sewer capacity that is included in the metropolitan interceptor sewers and wastewater treatment <br /> plants for fi.iture se�ver connections. This is a pressure sewer s�-stem, and each property owner is <br /> required to install, operate, and maintain their own private residential grinder pump station. <br /> The City will need to acquire a 20-:oot ��•ide permanent sewer easement acro�s your property for <br /> the installation and future maintenance of the sewer. We would like to obtain a "Right of Entry" <br /> to allow access on your property to complete the project construction. After the sewer is <br /> installed, the exact pipe location«ill be surveyed and a legal description developed for an <br /> easement document. <br /> Paae 1 of 2 <br /> Telephone(952)249-4600 • Fax(952)2A9-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.