Loading...
HomeMy WebLinkAboutsewer info . .� I �r �i � S�l�c�� l�v � �� . o , , � � 0 0 . � CITY of ORONO a� '�` , r��_• �„ �, � `,�r . ; ,� Municipal Oftices '�' , , ; �;`� G � ` ': .� Street Address: Mailing Rddress: `4$'Egg04' 2750 Kelley Parkway P.O. Box 66 - - " Orono, MN 55356 Crystal Bay, MN 55323-0066 I�iarch 13, 2003 Dear Nei�hborhood Residents; The City of Orono has selected a directional boring contractor to complete the pressure sewer installation project in the North Lon� Lake East neiQhborhood. This project consists of di:ectional boring a pressure se�ver line north of the existing houses, and the provision of a se:��ice stub for each house. Directional boring of the se���er should result in minimal disturbance to �-our property. The only excavations required will be at the service stub, and flushing connection stations. These locations are circled on the attached plans. There may- also be minimal disturbance in the areas where the coztractor sets up the directional boring machine. All disturbed areas �vill be restored as par of this project. The project schedule is to have the sewer installed by June 1 st. Connection to the se��-er is not requi�r�d, but the system �r-ill be available for future hookup upon pa�-ment of a connection fee. The current connection fee is $11,000 per unit. This connection fee is updated each year to account for i�flationary increases. In addition to the City connection fee, there is also a Service Availability C�TQe (SAC) fee that is collected by the City then remitted to the Metropolitan Council Environmental Services. This fee covers the capital costs for additional se«-er capacity that is included in the metropolitan interceptor sewers and�vastewater treatment plants for hzture se��-er connections. This is a pressure se«-er system, and each property owner is required to install, operate, and maintain their o�vn private residential grinder pump station. The City will need to acquire a 20-:aot ���ide permanent se��-er easement acro�s your property for the installation and future maintenance of the sewer. We �vould like to obtain a "Right of Entry" to allo�v access on }�our property to complete the project construction. After the sewer is in�talled, the exact pipe location«-ill be surveyed and a leaal description developed for an easement document. � Page 1 of 2 Telephone(9`2)249-4600 • Fax(952)249-4616 Rww.ci.orono.mn.us J . _� Please review the enclosed information and contact me at 952-249-4621 should you have any questions regazding this project. We�will need to have signed "Right of Entry" documents from all of the property owners before construction work can begin on this project Thank you for your assistance in this matter. Sincerely; � �� Greg Gappa Director of Public Services Copy: Tom Kellogg, Bonestroo Engineers Page 2 of 2