Loading...
HomeMy WebLinkAboutRe: sewer info t _ -1 � S. 1 Z� � 1� -���, 1��� � � � � o � � � 0 0 � ` CITY of ORONO ,� �����, � � � �, r ,:�' .°` ' ti Municipal Offices 'C� - ' , j'� '..; Gti' � ' � , Street Address: Mailing kddress: 9�'EggO�' ' 2750 Kelley Parkway P.O. Box 66 , _- _____, --— Orono, MN 55356 Crystal Bay, MN 55323-0066 1�larch li, 2003 Dear Nei�hborhood Residents; The City of Orono has selected a directional boring contractor to complete the pressure sewer installation project in the North Long Lake East neighborhood. This project consists of directional boring a pressure se�ver line north of the existing houses, and the provision of a service stub for each house. Directional boring of the sewer should result in minimal disturbance to your property. The only excavations required will be at the service stub, and flushing connection stations. These locations are circled on the attached plans. There may also be minimal disturbance in the areas where the contractor sets up the directional boring machine. All disturbed areas will bz restored as part of this project. The project schedule is to have the sewer installed by June 1 st. Connection to the se�i-er is not required, but the system will be available for future hookup upon payment of a connection fee. �I'he current connection fee is $11,000 per unit. This connection fee is updated each year to account for inflationary increases. In addition to the City connection fee, there is also a Servicz Availability Ch�rge (SAC) fee that is collected by the City then remitted to the Metropolitan Council Environmental Services. This fee covers the capital costs for additional sewer capacity that is included in the metropolitan interceptor sewers and �vastewater treatment plants for fi.rture se«-er connections. This is a pressure sewer system, and each property owner is required to install, operate, and maintain their own private residential grinder pump station. The City will need to acquire a 20-foot��zde permanent sewer easement acro�s your property for the installation and future maintenance of the sewer. We would like to obtain a "Right of Entry" to allo��-access on }�our property to complete the project construction. After the sewer is installed, the eYact pipe location��ill be sur��ey�ed and a legal description developed for an easement document_ PaQe 1 of 2 Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us �- _ . Please review the enclosed information and contact me at 952-249-4621 should you have aay questions regarding this project. We-will need to have simed "Right of Entry" documents from all of the property owners before construction work can begin on this project. Thank you for your assistance in this matter. Sincerely; Qr� �J � �� Greg Gappa Director of Public Services Copy: Tom Kellogg, Bonestroo Engineers Page 2 of 2