Loading...
HomeMy WebLinkAboutRe: remodel � DESIGN STRUCTURAL ENGINEERING 1409 S. 7th St. HOPKINS, MN 55343 935-5550 20�4 06 1� Jae & Sandv R.auschendorfer �895 Shoreline Drive Orono_ Minnesota 55391 Att: Sandy Rauschendorfer 952-471-9230 w:952-472-6882 Re: Residence Remodel Str-uctural !�natysis for Bsmt. Beam { V4'R# 298-2} �' As requested, we met yesterday at your home. We observed the new triple 13" Larninated tieneer Lumber (LvL)beam in the living room, spanning 16' supportirzg the upper level bedroom & a portion of the roof, as weIl as tY�e large beams installed in a 1930 remodel. The major concern u�as the relocated column load on the Masement beam. We measured the structural members & floor areas for later analysis, as welt as discussed likely constructi�n requirements. �H�LYSIS Using code prescribed live loads of 40 pounds per square foot (psfl and observable dead loads we performed a structural analysis of the loading line 8 feet in frotn the South side of the house ( where the stacked LvL's were installed}. The new triple 13" LvL can safely support superimposed loads, being stressed to 82°ro of capacity� and a mazunum live load defl�etion ratio of span divided by 350 (= La'350). A historical live load deflection ratio of LJ3601imits plaster cracking. This remodel onl_y slightly exceeds this limit. The e�stin�Basement Beam consisted of 8 laminations af 1 3/4"x 16" LvL. The 8-16"LvL beam can safely support superimposed loads, bzing stressed to 75°ro of capacity and a ma�mum live load deflection rario of L�350. Continuing the vertical load path: the center basement column is stressed to less than(an acceptable) 30(}psi; and the center footing is loadi� the soil with 3300 psf(no different than before the latest remodel}. ��a��n��to�xs The new triple LvL Living room beaxn must have the end bearing areas rebuilt with the exclusion of flat lumber ( plates & plywood} from LvL beam to Basement LvL Beam. Shore the beam one end at a time, remove minimal amount of plate and floor, install bearing siuds, block adjacent to bearing studs {under king studs) thru floor thickness. The East�all with 3- 2x4 (SPF#1+2) direct bearing studs, w�th 2x4 king stud each side is adequate to suppart the load. The W est wall with 2- 2�6 (SPF#I+2) direct bearing studs is adequate to support the load. Solid block 3-2x6 thru floor over Basement beam. The e�istin� southern 8 foot living room eatension ceiling has a few butt spliced 2x8 joist. These must be doubled with new lumber. �%e believe this should address vour immediate needs. If you have any additional concerns, or questions on our , please call to discuss them. Thank you for the opportunih�to assist you . � S' cerely `� �``� � - , , _._,__ _.. _.. _ ,._ V,,: C�� ..;�` t�'arren T�r. Rutledge Y.E. �`��r�3e �'R Design Structural Engineering 1409 South Seventh Street Hopl:ins, Mimiesota 55343-7894 [mso\_d ata`.295-2msc-ip't.doc]