Re: Sewer Installation, 1491 Shoreline Drive
Dear Mr. Gappa:
We have reviewed the sanitary sewer installation for the property located at 1491 Shoreline
Drive. The sewer depth from the street to the home is less than the required depth. The
depth is as shallow as 4 '/z feet, but because the sewer is under hard surface, (see approved
site plan) it will freeze due to frost penetration.
It is our understanding that the sewer connection to the house was completed by Earnie
Mayer and Miller Prybid under contract to the City of Orono.
Please have your contractor, Miller Prybid, install the sanitary sewer in a proper manner at
least 7 '/2 feet below the surface under hardcover. Should you have any questions, please
call.
Sincerely,
F.LK-Kuus�sto, Ltd.
� 1_�... ,
�..
Steven Harvey, P.E.:a�
cc: Richard Krier, Project Manager
Janet Kiernan
City Clerk
Offices: Hibbing • Minnetonka • St. Paul • Twin Ports
(612)933-0972 • 6110 Blue Circle Drive • Suite 100 • Minnetonka, MN 55343-9123 • FAX (612) 933-1153
i �' ' f;
i"� �7! 'k���r,ru�-.����<_�,�ti ; .
� O� .
O ::>. O
�=-��:=��-�� � CITY of ORONO
�`� '��'����' ��� D"
��� t��� �lS� Municipal Offices
`�''� � ,�"'`°',�{:�`� G
.�9 ;;;�����'�4,� Street Address: Mailing Address:
�fEgKO 2750 Kelley Parkway P.O. Box 66
Orono, MN 55356 Crystal Bay, MN 55323-0066
October 28, 1997
Dear Project Area Residents;
Installation of the sanitary sewer lines and lift stations is complete for the Bracketts Pointl Bay Ridge
sanitary sewer project. The system will be operational and available for residential connections as
of Monday,November 3rd. All connections to the system must be completed by a state licensed
plumber. A City permit for connection must be obtained by the licensed plumber who is going to
complete the work. Payment of the Metropolitan Council Environmental Services SAC (Sewer
Availability Charge) must be made when the sewer connection permit is issued. This charge is for
the metropolitan sewer system downstream capacity that has been reserved for new sanitary sewer
connections.
According to Orono City Code, all connections to the sewer system must be made within 16
months of the official date that the system is operational for residential connections. Based on the
availability date of November 3rd 1997, the deadline for connection to the system is March 3rd
1999. Effectively, this means that all connections will need to be completed before the end of the
1998 construction season.
Restoration of the project area is scheduled for this fall with the final surface course of asphalt
pavement scheduled for completion in 1998. Thank you for your assistance in this matter and
patience and understanding during construction of this project. Please contact myself or Tom
Kellog with Boonestro Engineers, Phone 604-4863, should you have any questions or concerns
about the proj ect.