Loading...
HomeMy WebLinkAbout2015-00118 - tree removal CITY OF ORONO * z 0 1 5 — 0 0 � 1 e * � 2750 KELLEY PARKWAY DATE ISSUED: OU26/2015 4 ORONO, MN 55356- 952 249-4600 FAX: (952 249-4616 ADDRESS : 1449 SHORELINE DR PIN : 11-117-23-21-0001 LEGAL DESC : UNPLATTED 11 117 23 : LOT 000 BLOCK 000 PERMIT TYPE : TREE REMOVAL WITHIN 0-75' PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : TREE REMOVAL WITHIN 0-75 NOTE: OK TO REMOVE 2 BEAVER DAMAGED TREES TO AT SOUTHERLY TIP OF PROPERTY. APPLICANT TREE REMOVAL 0.00 TOTAL 0.00 (INDNIDUAL) 3250 NORTH SHORE DR WAYZATA, MN 55391- OWNER RLA Family LP 3205 CRYSTAL BAY ROAD WAYZATA, MN 55391- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permi[is for only the work described and does not grant permission for additional or celated work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construc[ion authorized is not commenced within 180 days oY the da[e of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. � �2� � Z �� '� c ��2-� c�:,;-� � Z � I _ - � � Appl cant Permitee Signature ate Issued By Signature Date � � � , City of Orono . • ! Zoning Permit Application Mailing Address: Permit number: �l Jr- b��f�� �Q�O PO Box 66 Crystal Bay, MN 55323-0066 Date received: /� �� Escrow#and Street Address: amount: 2750 Kelley Parkway � y ; Orono, MN 55356 Permit Fee: F G `�kES}-►OR� Fax: 952-249-4616 Approved by: � �o-„r s Main: 952-249-4600 Notes: www.ci orono.rnn.us This application form must be completed in full and all required information must be submitted. (Please print.) Job Site Address: 1��� S�j � � - � � � � �;�� ,� C�ra,� �'"1/1/ 55.s�t CONTRACTOR I APPLICANT IN O MATION: Name: � Phone: - Fax: Address: 2 Cit : �y,� ZIP: ,,5' : y Contact Person: ContacYs phone number d12-Z 2-�/„�� Email �r���y������ �f /Applicant is: Contractor Homeowner (Circle One) `c�� c.om PROPERTY OWNER NFORMA ION: Name: Phone (day): - � - Mailing Address: � ZIP: $ Email and/or Fax rn K Overall Project Description: �' l ' /,� �ol- �� Check TypE OF PERMIT Box COST* Dock, Commercial $50+ engineering review costs Escrow for erosion control and engineerin review costs $2,000 Dock, Residential - Permanent dock on any lake or initial seasonal dock not $50 + engineering review costs on Lake Minnetonka permanent dock requires CUP Hardcover Permit: Driveway, Patio, Sidewalk, etc. (New or Replacement) No charge Also requires is a Minor or Major Land Alteration Permit Land Alteration, Major(grading, filling, or excavating) more 500 cubic yards $50 or more than 10 cubic yards in lakeshore setback (also requires CUP) Escrow for erosion control and engineering review costs As determined b CUP Land Alteration, Minor(grading, filling or excavating)-500 or less cubic $50+ engineering review costs yards outside of lakeshore setback or less than 10 yards in lakeshore setback Escrow for erosion control and engineering review costs $2,000 Retaining Wall measuring under four feet require a zoning permit. $50+ engineering review costs Retaining walls measuring more than four feet (from bottom of footings to top of wall) require a building permit. (Tiered retaining walls are considered one wall unless the walls are separated by twice the height of the lower wall.) Escrow for erosion control and engineering review costs $2,500 Stairway or Lifts to Lake(New or Replacement) $50+ engineering review costs Escrow for erosion control and engineering review costs $2,000 Structure Permit for other structures not requiring a building permit but $50+ engineering review costs regulated by the zoning code (including, but not limited to accessory building of less than 120 square feet, detached deck or platform and sport court) Escrow for erosion control and engineering review costs $2,500 Tree Removal or other ve etation removal in 0 to 75 foot zone No char e. Pre-inspection required. Temporary Construction Office/Trailer(associated with building permit) $30 (over) *Permit fee will be collected when the permit is issued. Updated: January 2015 APPLICANTIOWNER ACKNOWLEDGEMENT: ♦' i . ApplicanUOwner agrees to provide all information required or requested by the Planning Department; � ' _ . Owner agrees to pay the City of Orono for engineering consultant review costs where applicable; � . Applicant/Owner certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Applicant acknowledges the attached Escrow Agreement is completed and signed by Owner; • ApplicanUOwner understands their project may require an initial and as-built survey per City Code Section 86-68. • Some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If ou refuse to su I the information,the a lication ma not be issued. The undersigned certify that the info. ation supplied is true and correct to the best of their knowledge. Applicant's Signature: F � Date: ��' �Z''l J �— Property Owner's Signature: Date: SUBMISSION REQUIREMENTS: Except for tree removal permits, all permits require a completed TYPE OF PERMIT: application form, escrow agreement (signed by the property owner) and escrow check from owner, two copies of all plans, and three copies of all grading plans or surveys/site plans DoCk, Commercial 1. Structural plans for the dock 2. Survey showing the proposed location of the dock 3. Copy of LMCD permit Dock, Residential Seasonal Dock—survey showing proposed dock Permanent Dock—plans as approved by CUP and copy of LMCD permit(if applicable) HardCover Permit 1. All Minor or Major Land Alteration Permit requirements apply as appropriate 2. Hardcover calculations,existing and proposed 3. Survey Land Alteration, Major 1. Survey/grading plan including existing and proposed contours as approved by Conditional Use Permit 2. Erosion control plan. 3. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a buildin permit without information from the MCWD. Land AlteratiOn, Minor 1. Survey/grading plan including existing and proposed contours (LeSs than 10 Cu.yds. 2• Amount of fill to be imported and/or exported and haul route within 75' of lake or less 3. Amount of earth to be moved around on site than 501 cu.yds 4� Erosion control plan. elsewhere.) 5. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a building permit without information from the MCWD. Retaining Wall 1. Plans for wall(s) 2. Unless repair or exact replacement of existing wall,submit an updated survey with grading plan including existing and proposed contours 3. Hardcover calculation worksheets if in shoreland district 4. Erosion control plan 5. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a building permit without information from the MCWD. Stairway or Lifts to 1. Construction plans for stairway or lift,including footings Lake 2. Topographical survey of property with proposed stairs or lift shown 3. Erosion control plan 4. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a building permit without information from the MCWD. Structure Permit 1. Construction plans. 2. Survey of property with proposed structure shown and with setbacks to property lines,other structures on property and the septic system indicated.The general location of any sewer and water services should be shown if applicable. 3. Grading plan if grading is proposed. 4. Hardcover calculation worksheets 5. Erosion control plan. 6. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a building permit without information from the MCWD. Tree Removal Call: 952-249-4600 to schedule a single tree removal inspection. A re-planting plan/erosion control/management plan re uired for clear cuttin ,buckthorn or other intensive ve etation removal. Updated: January 2015 { � � ` LAND USE APPLICATION ESCROW AGREEMENT Application# AGREEMENT made this day of , 20 , by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and [a corporation—optionalJ ("Owners"). Recitals 1. Owners have filed Land Use Application# formally requesting the City to review plans for the property addressed: (the "Subject Property") legally described as 2. Owners request the City to review said plans which requires City approval and may require consulting legal and/or engineering review. 3. The City is willing to commence its review of the application and incur costs associated with said review only if the Owners establish an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$ with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, or legal consultant review) or will incur in meeting with the Owners, reviewing the plans, and preparing agenda packet material for City Council review of Land Use Application # . Eligible expenses shall be consistent with expenses the Owners would be responsible for under a land use application. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall cease all reviews until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when all requirements related to the project are complete. City Staff shall review the terms of this escrow agreement two times per year to determine whether the requirements of the project have been successfully completed and whether it is appropriate to return the funds. Owner may also request the release of the funds, and such funds shall be released upon City Staff receiving the appropriate verification that all requirements of the project have been successfully completed. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: CITY OF ORONO OWNERS: By: By: Its: Its: .� �� .. � ,. ..__ 3,,.., , . . . , .,.r.... � a _ , ,,.. � .. _. _�,. _ _ � �������;, � . �� � . Updated: January 2015 . EMERY'S TREE SERVICE, INC. PO BOX 196 DELANO, MN 55328 PHONE & FAX 952-955-1848 MOBILE 612-685-0120 ESTIMATE January 18, 2015 North Shore Marina 1449 Shoreline Dr Orono, MN Travis Remove three (3) Cottonwood Trees Two of these trees have been damaged by beavers and the third tree hangs over marina docks and boats. This poses a threat to people who rent slips at the marina as well as marina property. For both safety and prevention of property loss I recommend that all three trees come down. Please call lohn if you have any questions. We look forward to working with you. John Emery Sr. ISA Certified Arborist #MN-4228A � .... �' - �� � \ / � ` p/ A� � TIM� CITY OF ORONO CALLED IN INSPECTION NOTICE /SCHEDULED .f��S � PERMIT NO. a� ' � COMPL e�— ADDRESS l OWNER TELEPHONE NO.���aY S�� CONTRACTOR �: DESCRIPTION �e� � lu ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ IAKESHORE%WEfIANDS y Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL� Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q p RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERfCONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: ¢ W a � � O ). � O � W � Q � 2 W � w � J W WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � ❑ ORRECT WORK&PROCEED O ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ PHOTOTAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR �INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cail forthe next inspection 24 ours in a a 2� 249-46�� OwnedConVactor on site: Inspector. White Copyllnspector's File Canary CopyfSite Notice � .����e ��1�0�r'n�- � �' ? �- �lV��'� DATE TIME OF ORONO �N CALLED IN � � INSPECTION NOTICE /� SCHEDULED PERMIT NO...�i"'��^-'/`������ COMPLEfE ADDRESS l �"y `7 � �C��� �C��/�� l��L <� � G��,�� y� OWNER —1 r�'ll.1 11,5 �-�'I �TELEpHONE NO.��?•' Z���;�� CONTRACTOR _,_-�---�" � DESCRIrTION �r�� I�c� ��� ` t��� ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ ❑ DEMO-SITE ❑ PTIC INSTALL J 2 OWNERICONTRACTOR TO MEET YOU: YES_NO _� � COMMENTS: ` -P�n�� -����r�>LT�I �G'i � � `� _ `-� .r� i S i/'1 c-� O � J ",J�, � C ' c,,J�' �, /� '' e,,,�, ,/' 3 � �'�e. 5 c7 � O / J � �(n 1 � _S I�C'. o� �'�J�tr� i I�a!/� I�-. /1G � Q f✓�` W f�� � �✓u �/',�n� T;.� r� . Q � , �t �' �- ,C�?� � N � Gvf�1e� C�c�� /'G�, � - W - � 3• 2e,�,,, s � d e�� � -l'r�e-z� a�s r'S � � ���� � � ��WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLEfE W ❑CORRECT YYORK 3 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITION WITHIN HOURS. ❑pHOTOTAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITA710N ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 2a hours in advance. (952) 249-4600 OwnerlContractor�n�ite: Inspector: lC� - White Copyllnspector's File C�n�ry CopylSNs Notics