Laserfiche WebLink
_ ... ' � <br /> - O I <br /> � � � <br /> O ;� � �0 <br /> �:���--=� , C Y of ORONO <br /> � � .� � � <br /> r��, �" � ',�-� �,F�r Municipal Offices <br /> Y � <br /> � � <br /> G SVeet Address: Mailin� Addross: <br /> �9$EgHOg'� 2150 Kelley P �kway P.O. Box 66 <br /> Orono, MN 5 356 Crystal Bay, MN 55323•0066 <br /> Apri128, 1998 <br /> Dear Project Area;Residents; <br /> The City of Oro�o has scheduled a Neighborhoo Informational Meeting to obtain resident <br /> comments on a p�oposed sanitary sewer project to serve the Webber Hills Neighborhood. A <br /> project area map is included with this notice. This N ighborhood Meeting will be held at 7:00 <br /> P.M. Tuesday, May 19th at the Orono City Cou il Chambers. <br /> Introduction <br /> This area was incly�ded in the recent MUSA expansi n for sanitary sewer installation because of <br /> the smaller lot sizas and older septic systems with 1' 'ted replacement sites available. Installation <br /> of new code compliant septic systems will be diffic lt on some of the lots in this neighborhood <br /> and system replacements will result in the loss of erous trees. Approximately 75% of the <br /> existing septic systems in this neighborhood are n -conforming with several systems in near <br /> failing condition. This area is one of ten neighborho s included in the recent MUSA expansion. <br /> Sewer projects ha�re already been completed in four eas with an additional two areas scheduled <br /> for completion thi� summer. We are beginning the lanning process for possible 1999 projects. <br /> At this time, interest rates are low providing for mo e affordable projects. <br /> Project Assessments and Costs <br /> A feasibility study has been completed with an es imated project cost of $961,000 in 1998 <br /> dollars. This results in a proposed project assessme of$26,000 per unit payable over a fifteen <br /> year period. Optimns for prepayment of the assess nt are available. Based on several projects <br /> recently completec�, the estimated interest rate is 6.2 %. Based on a 15-year assessment at 6.25% <br /> interest, the annua� assessment payments will be ap oximately $2,700. These project costs and <br /> assessment payments may vary dependent on future construction costs and interest rates. <br /> Telephone (612) 473-7357 « FAX 473-0510 <br />