HomeMy WebLinkAbout#6397-variances/CUP-2014 . .
� O�
O �!� � O CITY of ORONO
�t ��
a=-
� �i �- �.-�'; F RESOLUTION OF�T�E�L�Y COUNCIL
�� ` �� .'t�fa �, 0 �
� NO.
��kEsHog'�
A RESOLUTION
GRANTING VARIANCES FROM
MUNICIPAL ZONING CODE
SECTIONS 78-1279, 78-1282 8� 78-1680
AND A CONDITIONAL USE PERMIT
PURSUANT TO MUNICIPAL ZONING CODE
SECTIONS 78-966 & 78-1286
FILE NO. 14-3656
WHEREAS, Thomas M. Randgaard Trust U/A Dated December 19, 2000,
(hereinafter the "Owner") is the owner of the property located at 2765 Shadywood Road within
the City of Orono (hereinafter the "City") and legally described as:
Tracts E, F, G, H, I and J of Registered Land Survey No. 415 files of Registrar of Titles,
County of Hennepin (hereinafter the "Property"); and
WHEREAS, Thomas M. Randgaard, co-trustee of the Thomas M. Randgaard
Trust U/A Dated December 19, 2000, (hereinafter the "Applicant") on behalf of the Owner has
made application to the City of Orono for an after-the-fact variance to Orono Municipal Zoning
Code Section 78-1680 to allow installation of approximately 60 square feet of additional
hardcover for an elevated patio (hereinafter"East Patio");
WHEREAS, there are existing legal non-conforming improvements within the 75-
foot setback on the Property and in accordance with Orono Municipal Code Section 78-71 the
Applicant intends to perform in-kind replacements including the following: a paver sidewalk,
convert a porch (a.k.a. hot tub room) to an above grade patio; reconstruct an at-grade patio and
convert a deck to the East Patio; and
WHEREAS, in conjunction with the in-kind replacement of the East Patio, the
Owner has made application to the City of Orono for an after-the-fact variance to Orono
Municipal Zoning Code Section 78-1279 to permit construction of the East Patio 42 feet from the
OHWL of Lake Minnetonka and approximately 1.5 feet closer to the OHWL than the deck it was
replacing where a 75' lakeshore setback is normally required;
WHEREAS, in conjunction with the in-kind replacement the Applicant has made
application to the City of Orono for a conditional use permit (hereinafter the "CUP") pursuant to
Orono Municipal Zoning Code Section 78-966 and 78-1286 to allow installation of rain gardens
as well as an after-the-fact CUP to address the filling related to the as-constructed elevated
patios within the 75-foot setback on the Property; and
Page 1 of 5
� o�
O �,: O CITY of ORONO
��,.
��r���
� }� ��t � ���
�� ` � RESOLUTION OF THE CITY COUNCIL
'� � �� :�_ �� 6 3 9 �
�� y' ° �G'�' NO.
�k'ESH�4
WHEREAS, after due published notice and mailed notice in accordance with
Minnesota Statutes and the Orono, Minnesota, City Code, a public hearing was held by the
Orono Planning Commission on March 17, 2014 at which times all persons desiring to be heard
concerning this application were given the opportunity to speak thereon.
NOW, THEREFORE BE IT RESOLVED by the City Council of Orono,
Minnesota:
FINDINGS
1. This application was reviewed as Zoning File number 14-3656.
2. The Property is located in the LR-1 B One Family Lakeshore Residential Zoning
District which requires a minimum lot area of 1.0 acre and a minimum lot width of
140'.
3. The Planning Commission reviewed this application at a public hearing held on
March 17, 2014 and voted 6 for and 0 on a motion to approve the CUP and the
hardcover variance based on the following findings of fact:
a. The Property contains 32,622 square feet (0.75 acres) in area.
b. The Property has lakeshore on two sides therefore there are two separate 0-
75' zones. The property has 153' in width at the southern location of the
Ordinary High Water Level (hereinafter the "OHWL") and 184' in width at the
southern 75' from the OHWL; and has 244' in width at the northern OHWL
and 209' in width at the northern 75' from the OHWL.
c. The Applicant's proposed landscape plan has been designed in a way which
offers screening of the improvements with a natural vegetation as viewed
from the lake and from neighboring properties.
d. With a total of 20.54% overall hardcover, the Property will conform to the 25%
hardcover limitations of a Tier 1 lot.
e. Minnesota State Statute 462.357 permits an existing non-conforming
structure to be reconstructed in-kind. The construction of the paver sidewalk
and the conversion of the west porch to an elevated patio and pavers appear
to be in-kind replacements and can be approved administratively.
f. After-the-fact hardcover and lake setback variances are required because
discrepancies between the 2007 and current surveys, and the available
information in applicant's submittals, testimony and City records, are
Page2of5
.� o�,.
Owa��_ O CITY of ORONO
�.�
. ��- .
� � � '�'� �+ RESOLUTION OF THE CITY COUNCIL
��
�'�� Y'' ��s� G��' No. 6 � 9 7
�kESH�g'�
insufficient to confirm whether the East Patio can be considered as a
replacement in kind of the previously existing deck it replaces.
g. The ApplicanYs proposed rain gardens, paver walkway, elevated patios and
landscaping will not alter the essential character of the neighborhood and will
result in minimal or no negative impact on adjacent properties.
h. The ApplicanYs' project will not adversely impact views of the lake currently
enjoyed by the adjacent properties; views of the property from the lake will be
improved with the new stair and landscape screening offered.
i. The ApplicanYs request is in harmony with the purpose and intent of the
ordinance.
j. The Applicant has demonstrated that enforcing the provisions of the Zoning
Ordinance deprives the Applicant of the reasonable use of their Property.
k. The proposed grading within the 75-foot setback area will not have an
adverse impact on surrounding lands. Drainage patterns for runoff leaving the
site will not be significantly altered.
I. The Applicant has provided a landscape plan which will serve to screen and
mitigate views of the retaining walls and stairs from the lake in a natural
manner.
4. The City Council has considered this application including the findings and
recommendation of the Planning Commission, reports by City staff, comments by
the Applicants and the public, and the effect of the proposed variance and CUP
on the health, safety and welfare of the community.
5. The City Council finds that the conditions existing on this Property are peculiar to
it and do not apply generally to other property in this zoning district; that granting
the variance and CUP would not adversely affect traffic conditions, light, air nor
pose a fire hazard or other danger to neighboring property; would not merely
serve as a convenience to the Applicants, but is necessary to alleviate a practical
difficulty; is necessary to preserve a substantial property right of the Applicants;
and would be in keeping with the spirit and intent of the Zoning Code and
Comprehensive Plan of the City.
Page 3 of 5
� ,
� O�
O �, O CITY of ORONO
��,
���`�-._,
+-� � �% -';� D►► RESOLUTION OF TH ITY COUNCIL
"�" f �Y �4• .:�`� ,�,�' 6 �� 7
� G NO.
��kESH�g'�
CONCLUSIONS, ORDER AND CONDITIONS
Based upon one or more of the above findings, the Orono City Council hereby grants the
following:
a) An after-the-fact variance to Orono Municipal Zoning Code Section 78-1680 to
allow installation of approximately 60 square feet of additional hardcover for the
East Patio;
b) An after-the-fact variance to Orono Municipal Zoning Code Section 78-1279 to
permit construction of the East Patio 42 feet from the OHWL;
c) A CUP pursuant to Orono Municipal Zoning Code Section 78-966 and 78-1286 to
allow installation of rain gardens;
d) An after-the-fact CUP to address the filling related to the as-constructed elevated
patios within the 75-foot setback on the Property;
Subject to the following conditions:
1. Council approval is based on the survey, construction and landscape plans submitted by
the Owner and annotated by City staff, attached to this Resolution as Exhibits A, B & C
Any amendments to the approved survey/site plan which are not in conformity with City
codes will require further Planning Commission and City Council review.
2. Proposed hardcover levels are conforming to the Tier 1 standards and shall not increase
above 4,019 square feet or 15.6% within the 0-75' zone and 6,072 square feet or
20.54% overall. Structural coverage limitations will also be met. No variances are
granted for an increase of hardcover or structural coverage.
3. Authorities granted by this resolution run with the Property not with the Owner, but are
permissive only and must be exercised by obtaining administrative building permits for
the patios, paver walkway and rain gardens walls and commencing construction of said
project within one year of the date of Council approval, or the variance and CUP will
expire on that date (April 28, 2015).
4. Upon completion of the project and prior to release of escrow monies the Owner shall
submit an as-built survey and as-built hardcover calculations verifying compliance with
the approved plan.
5. Violation of or non-compliance with any of the terms and conditions of this resolution
shall constitute a violation of the zoning code, shall automatically terminate any authority
granted herein, and shall be punishable as a misdemeanor.
Page 4 of 5
� o�
O �s�� O CITY of ORONO
���..
'��'a�;
�,-
� 7 '`�� � RESOWTION OF TH ITY COUNCIL
� � � 6 �� 7
� r �', ::�`� G,ti,�' NO.
��kESH�g'�
6. The undersigned Owner has read, understands and hereby agrees to the terms of this
resolution and on behalf of the Owner and the Owner's heirs, successors and assigns,
hereby agrees to the recording of this resolution in the chain of title of the Property.
Adopted by the Orono City Council on the 28th day of April, 2014.
ATTEST:
`..��--�-,� ,c�v
Rachel Dod e Cit Clerk L�� Lili Tod McMillan, a or
9 , Y Y
�G�c.���
Michael J. arrett
STATE OF MINNESOTA
COUNTY OF HENNEPIN
This instrument was acknowledged before me this � day of /� , 2014, by
Michael J. Barrett, co-trustee on behalf of the Thomas M. Randgaard Trust U/A Dated
December 19, 2000.
�r�' �
BARBARp►0•S��US
NOiARV PUBLIC`��S�TA
My Commisa�o�Exp�"�^.�1,20ti8
� Notary Public
Page 5 of 5
� .
• z
CERTIFICATE OF SURVEY FOR ���
NELCO LANDSCAPING W ; '
OF TRACTS E, F, G, H, I AND J, RLS N0. 415 �s'• 'F�-'
HENNEPIN COUNTY, MINNESOTA ,ao°ry 3���• ���'�
h�
t ��� ����
�
���
�ti w
� ti3►• oo� �� . z��
cP � p�' a�
z��0 � � � �
i ;
r� � ' � � � �
� , �—
� ;_ � ---- % .t
� — - ,,
+ i ��- ��0�---'� -''- ' ,
s,� ( � /� '�=`���/� '_ J-' � N i v
( � a �� ,- -- IVATE __ -- a
� gOAD
,, N 8�12 14�� g 14'i.__---- a
/���j � �----'--- , __� �� .. � �/
// � a�/ ,� / \ �_� ' i
� �.�� / 55�/ �'/'10� ���'� J .�'� I �__
�/ � ��� ��/6 ,-- _.� e..M.� 1 d,,,...�� � / �y �
�/ i i f°�'/p�;' ✓� � -- ! � � 5 -1
// � � � ,-/-�,st� ;',,_,. �_�� h� i � n-� 3
/ � I i C - �I i �V
/ � i .f J i� h ��••a __�"� � � � EXISTMG HOUSE -m o '
� / � � C a ' � � i �' - i �" �:ms so �o eo �ags �
. / // i � �Z 2�re�o�j?r�+�f�� �.' � ` '� i $ #���
�/ u[ i �
/ /�� � � M 5 C�L E 1 N F E E T
N b 4
�� �, . � /' EXI9TING__---- - 5•- i � , ��3�
�/ „�� � ' G ----"HOU3E ,uz"� ¢ ',
z�es " m,� � �' ��I {
�` ''- „�__ �(�) 'lW�'� Y gL �
. � %i /� £ ",'-�' � ^, (Ewj'm ��__
� �_ Y A . W..' i� Y \`�. _FT� f
�� � �� \�� '(C) i
/ i0 �- `'W___'___� �-{ / ���� � _'- _'
iI � �� �_ -__- YS-- \..
� ` l __
/ ��
, , i `__ `` __---'_�� �6�&2!:-- �` _ ��-- •�\ LEG�L OESCRPfION OF�'
� B -�T��E-''I ��-�� ,�---' i Trmt�E,f.G,H.p wd J of ReqletarM LaM Svvsy No.ti5.
- ,p�6��--'� � ,,- ��� nb.oi rs�d.va �neb..cw�er oi r�.Ko�2
��i � ---�-„�- -- _' -- -?'------' -�-- � \ o m '
\ - ` — - � ' e�ote.: mo.ws
� / ,��----�� �� ,�,�� '_� ---�^ -- I �—���.� ���'� ,
ss wniaa uL =,.f ��`�� (noA)' eswte.edsiFq wo�eierolfon
°m ,�� i � W �i5b.6 J t��� ,�: e.�e..v.000,.a w�t w�cm.,�.�..a N.N aoi�
-� i—�� '�«ruEaS-88"52r66"��� -
���� / �y Ny 1������ --p�p--' dxmtx�cbfinq cmlw fim.m^a^wa bvtl dalum
� sa Is�d Eotun
. /2115 � /�I ��� �— �r dvntm R�4 tonlw Wa.mem•
' / faRt�� Bevi�ge qmrn>s bmad on weurwd dalum.
� % Thh v r i�taM�to M��bavdvM� f lhe�ov�d�seribed
�ar�4.�me ur wwtian or m..r�Mo no�:..ew.wor...i.tt�q
ea.s�,n ma..ro�My•naaeo..,^.ero e:mwae.'a'on.�n'aoo�
� °�o��w�vw�ie�'e�o.'�mr oPriv��°i.o.aoe.oa�mm.�e. � d
LAKE �.E ��.a,o���.a��.�..�.��o��a����,� !
� MINNETONKA �`�"��y���'��.������
, �
' ,�
� K y
C�t ? O
., \O � 'Cr,
� D �
f
STEP STEP � �
WESTON WALLSTONE w/ � W
WESTON WALLSTONE w/ „ ,� �
CAMBRIDGE b" X 9" PAVERS CAMBRIDGE 6 X 9 PAVERS � �
� �
BELGARD CAMBRIDGE
COBBLE PAVING
(PATTERN A)
z
g
SOLDIER COURSE �
6" X9" ;
a
0
a
BUILDING EDGE �
�
a
W
COLUMN 20" X 20" Z
w/ BEDFORD 24" X 24" CAP g
a
V Z ?
W O 0
RECEIVED � ? 3
APR -1 2014 Q z Q
a O N
cmr oF oRONo Z W �
FREESTANDING WESTON WALL ° � �
w/ WESTON CAP UNIT �
a
I 1 I I �� DA7E 3 28 2014
_ � � � DRAWN. MWK
STEPS _ CHECKEO SLG
APPROVE� MWK
WESTON WALLSTONE w/ -� --- � " °R°'E°T"°
CAMBRIDGE b" X 9" PAVERS T_ � L - 107-11-1
EAST PATIO PAVING PIAN -1 �r—�
� SHEET
$�H��= I�-O�� CAMBRIDGE COBBLE L 100
PAVING PATfERN A
m �
c�
� � o
W � �
.o 00 �
-�,
Y
� iJ���l�`�'l � ��
421 OOOMAOVHS S9LZ m��'� Z � O
u � � ��a,Q Nt+ld 1f10A`dl O�ldd 1Sb'3 SNdld NOI1Jf1211SN0��IJ34 213Atld ;Z y o W � �
a�Naaisaa aavv�oNva �awg o o w J ��
<�=a � � � �
ODUQ d
W,^
V
0
'W^
V
Z
�
� (V
m
� N � -
in -�- �IN MN
� - - � - i
I� _ �_` N ��`- �
- - �
___` �
i
C'M
� -
ti �' �
N � _
� 1 = _-
(V �
- - �
t0 -_'- ; ---
� i
M _ _ / Mltt
_� _ / N
� �
�
CO � -
�
M -
� —_
� : - - Z
�� � �
' � F-
(h � 7
� O
a
J
. O 0
~ ��
�N � II
� N �
in a �
T w M
r�
�
W � - �,.
I m �1-1�I �-1 I ��, -
p �j ���I I I I�I I o`�f . o
D ��IIII�I�I ' "
� o���,��,��
o �I I I I�I�^:�:�,, �;.
� 'll II II�II ,°� ;- �
� �II I�I� ,
� ��� II Ii�ll
o I��II�i1= -a
z 'll II�I— �'' �
�I II��I o N
�I II II
��II�II�I -
all�il�ll ^-
��I I�I I I �_ ��i
�I I�I I� r=
_I��� I� =�
I I�I I�I I �i
�II�II�II _ �
�I I I�I I T_ :-�
�I I I� —I I � `I
� I I I 1 I�i;:=� �
I I� I I—T�I =- �
-1I I��f I — == Z
—�f11���I I I �_ D
—�1 I—I I I�I I�—I II -_- rn
I I—'—I I 1�I I�I I—I _�-` ' Uf
I�I�II II :'11!
I�1�I����� � :7
�I I�I�II�'� _— '�
I��I���������� _
��I�II�II�II� �
-ILI�II�II�II�II -=
;1�I I�I�I I�I I� ;= ;�
-IIHI�III�II�I =
�I I I�I�I I��I�I��� ^ =1
�I I 1=1 I I��I I�I I� _-
i�I I�I 1=I I�I I�I I -;:.:
�I I�I I�I I I I�I I�
w1�q�g Y
� ��3�� iJIMY 1 a �3 � �-/
Nl dOOMAO'dHS S9LL $3 N� o � O
���a,Q Nv1d�Nlndd 011b'd 1S3M SN'dld NOIlJfk11SN0��IJ34 M3�0'd ;�w w W � �
a�Naoisaa aavv�aNva w�w a 'o o w J
a�xa rc � x
ooua a
6 9 �
N
�
w
Q
a
J � O�
m ' X
� S X �
U - � �
W C � W m
p Q m � �
W Ifl
(p � � Q J W,^ �
W � V V
Q � O W a 0
� � V � Z �
m
a � W m � a
� j � � W N U
�
ma ° u � 33
-- ------- - -- '---- - � w
, Z �
_ _ _ _ _ — �_ ` �_ _. Q W
— — — - — — — - — — - . d C9
- — — — — - — � z
_-_-_ --_ _. , - X m
- - � __ __ _. _ ._ ' w
- - �- - - _ .-^_. _ ' ' 1
-- '- / �' - - - '_' - ^ _ _ �
_' F- / _ '. �"'_ __ ___' _ _ , �
/ _ _ _ _ ' _ � � ,
- ._ _t _ __ _' _
'- -_-" '`__--;L�_-_---_-`- ._
--_ -, _ "' ' _ __�' -i--� �- ._ - ,
r '_~_ ._ _ ' ` -
__-_ - _�'�__ ..� -�, .-� �-+ -
-+ r w a
_ � Z N Q
] m V
Z Q O N
V
N
N Z X X
. 3 ° � � z
Z 3 � � J
a
� � � �
Q ; O m Z
_� i �—�� w V; Q
`��—'—, I w d
- ' � LL � o
�
- 4— m Q d �
i o� �- ��
V�u W OD
�� �� � �
z
— � �d
�
�
W � �
� rn
' N
II �
D
_ �
o �
r
• � .
�
C
-i
v
Z O
— ,'
N
- - -- - 1
� �
= ---- �
�
--�- �
� �
--' �
c0
,- ---
� I �
� I O
i�
� N
_ �
�
-- �
_ i `
--- �
I
I
��
-- —� , /
� �
OD � � � •
�---
--- — � I
-- i N
�- - --- - -- - �
- - - -- - - j
- -- i
� ,
�J.� �
� ''
� �
= NI�
16 � 9
� � -+ p a=pm
r � o m a F Z RANDGAARD RESIDENCE ����,
� J � mo ` pAVER DECK CONSTRUCTION PLANS WEST PATIO LAYOUT PLAN
O z °';�
� � ° ��x� 27655HADYWOODW ���� C�j��
�
� Y
' � a ��
�������� N1400MAaVHS59LZ ti�N� � �
o �
1 ���� SNOIlt�A313 OIl'dd SN`dld NOIl�f1211SN0��1�30 N3�Vd ^�W w � `�' �
` 3�N341S3b aNVV`JON'd21 �a w a o � w —� r/�
ODUQ LL � N �,
P �
x 397
:�
W
w
m o0o Q
� �v o°� c9
� W 000 W
� 000 �
Z O Z � o D Z
� � � � � �
QQ Q � Q W 00�0 d'
u 3 � a 3 � o00 �
o v z o z � z '
� o°o°o 'v
O �' � � � � � � °o°oo X
1L x N X In d In Q 000 �
Q ' W ' W W W �. 000 Q
mr 3N 3 � 3 c� o00
oao
000
000
ooa
0000 000
aoo 000
0000
000 00
oao° o o°
0000
OODO OOD
000 000
0000 000
000 000
0000 000
000 000
0000 000
o'o°o°o o°o°o°
000 000
000 0°00
0000 000
o°o°o°o o°o°o°
o'o'o' o°o°o
000 000
000 000
oo'o° o00
0000 000
000 000
0000 000
o°o o°o o°o°o°
000 000
0000 000
000 000
0000 000
0000 0°00°
o°o°o°o o°o°o°
000 000
0000 000
• o000 000°
o°o°o°o o°o°o°
0000 000
0 00 000
o°o°o° °o°o 0
0000 000
000 0000
0000 000
000 000
0000 000
000 000
0000 000
o°o o°o o'o'o°
ono 000
0000 000
000 000
0000 000
000 000
0000 000
000 000
0000 000
o°o°o 0 0°0°0°
000 000
0000 000
o°o°o 0 0°0°0°
o°o°o°o o°o°o°
000 000
0000 000
00 0 0°0°0°
0 0°0°0 0 0 0°
o°o 0 0 0°0°0°
000 000
000 000
o°o'o°o o°o°o°
o°o°o 0 0°0°0°
0 0 0 0°0°0°
000 000
0000 000
0 0 0 0°0°0°
000 000
0000 000
000 000
0000 000
000 000
0000 000
OPO 000
0000 000
000 000
0000 000
000 000
0000 000
000 000
0000 000
o°o°o Z o°o°o° Z
O o00 �
aoo
000
jo°o°o° j
J 000� J
W 000 W
000 -
� � o°o°o° � �
� o00
� � o00 � -
H II o0o F 11
fA . 000 ln N
W N OODO Q �
3 � o0o W
000
000
000
aao
00o N� o00
000
Y
'1oS�� ��[�'� N1400MJ.OVHSS9LL o;�� o �
����� Nt/ld`JNI/�b'd �I1VM341S SN'dld NOIl�f1211SN0��1�30 N3AVd m�o°y� = r' O �
3JN301S321 021VV`JaNt+2i w��a p o w J �
OOUQ � � �
6397
:� mW3 _
� - --
� X o �
Z VI^ I
r `� W C
� J v Q
�
Z Q � m m � �
C � ? � C �
<
~ N O W a a �
aa � c� � �
ma
'^ '1� m
V Z W �- � v ' O Z
j � p � � Z U w
Q w > �" �
d w � V m d � d
� �
i m Z
�- I Q j
V d
I
(�
Z
N
X
W N
Q �
W F
N y
O �
Q �
Z U
Q Z
v�i �V
�
Z
� �
N � a
3 o c�
o z o
O � Q,^
LL v V
� = Z
K
� N d
0 Z d
U �
� O
�
_ � N
C Q� O Z
� ,,, 05
�
w Z
� �
vvo
zN � z
J O Z � O
c� z
w W ? d � �
O � x w w �
Z in w v� v� ?
_ i
. �
� u�
� �
L-]
� �
� �
BUIIDING EDGE
STEP
CAMBRIDGE COBBLE b"X 9"GLUED OVER
2 COURSES WESTON WALL STONE
45 MIL HDPM RUBBER POND LINER
ALONG BUILDING ENVELOPE TYP. CAMBRIDGE COBBLE PAVERS
(WRAPPED UNDER BASE PAD) COARSE SAND JOINTS(NO POIYMERS) J
Q
12"COMPACTED BASE PAD BEDDING COURSE Q
GRUSHED CLASS V NO.8 OPEN GRADED STONE(IGNEOUS) Z
BASE COURSE �
N
� NO.57 OPEN GRADED STONE(IGNEOUS) �
GEO-TEXTILE WRAP
MN DOT TYPE II SPEC 3733.1 SUB-BASE COURSE
.�: NO.2 OPEN GRADED STONE(IGNEOUS)
_�,. r _
c`��c , c=�--�_- GEO-TEXTILE WRAP
oc�,c,o " �O_ _'`�°,.c',, ;,;_ UNDISTURBED EARTH MN DOTTYPE II SPEC 3733.1
o^��.o�i c��<r'�„c=,c='.'�c:,._ Z
;o��ro�°nci.`�,tc,c`c�(��':
�,�,o o c a;�c-,'�,�_, c� �c,' UNDISTURBED EARTH v Z 3
n<,c Opr oc'^ .c ,_ .
�OV� O��oUvnODU'p�..,CQ,�
I I I-I I I^I I I.._I I I I-I I I I i I � O O
I—ITI=1 I 1=1 I I_I I 1=1 I I I—I I 1=1 �
- I-1 I I�I I I-1 I 1=1 I I � I I I—I I I—I Q o Q
-fll II — — —
_ _ _ - � � U' U N
� _ _ _ - Z W ^
� � N
�
Q
6
1 STEP TYPICAL SECTION ^ PERMEABLE PAVING TYPICAL SECTION
L DATE 7 8.2013
DRAWN MWK
���_�� O�� �11— �1��„ CHECKED SLG
APPROVED MWK
PROJECTNO
107-11-1
SHEET
L107
o� �
c�s �
�
—,J
_ � 1
�^ �
V �P�
U
WESTON CAP UNI7 y� �
BELGARD WESTON WALL
FREE STANDING PAVE EDGE RESTRAINT
GEO-TEXTILE WRAP
MN DOT TYPE II SPEC 3733.1 CAMBRIDGE COBBLE PAVER
b"X 9"SOLDIER COURSE
N
WESTON CAP UNIT Q
1"SAND BEDDING LAYER �
�
BELGARD WESTON WALL Z
6"COMPACTED BASE PAD �
RETAINING WALL w
CRUSHED CLASS V 0
4"PERFORATED DRAIN TILE 6 �—
--' UNDISTURBED EARTH
9"COMPACTED BASE PAD
CRUSHED CLASS V '�
Z
�; �;I�� ��i I,k.;�;i�. ���;��;�� \� . �u ..� , ._.� ... .._, ,-.., 3
ti {,�6 k��u' a 6. � I� UNDISTURBED EARTH O O O O O O. O � O O O O V Z 3
I I I � �� I I—I I O O O O O O O O O O O O W � o
c ' `' O O O O O O O O O O O O O o .
`i°r?�?��c' ,, % I I I O O O O O O O O O O O O O N G Q
c`�c �
O rc��r^ , ,,�' rri II— I — — — — —;�-1� — I � F � .
�' c�� c [ � I ���� � Z p
I—I ^�o�„�c:!'c c�';^•(-,,•�^�`r. I I I—I I IT I I I—I I I—I I I—1 I I—I I I—I I I—I I I—I I I—I I I—I I I
��� , nC��,����'��'',.,y y-•, ��� ��—��� - -III—T—��������—� °
poC•�,C n�'r •,r�',.r • n I � U 1=n
I�I=4(tOC..00��n6''� •��f��`•' _
I i I�I I I�—I I I�^I—I I�^I I I a W n
OC �
� � W
Q
a
onre �.e.zoi3
DRAWN. MWK
CHECKED SLG
APPROVED• MWK
� RETAINING WALL&FREESTANDING WALL TYPICAL SECTION ^ RETAINING WALL 8�FREESTAN�ING WALL TYPICAL SECTION PROJECTNO
L
�„= �,_a„ 1"= 1,_O., 107-11-1
SHEET
L108
Cr►
c�t
�
� �
� �
� _ _ _ _ _ _ _ _ _ _ _ _ — � Sheet Schedule '
929.40 OHWL �
Loo j � L001-Layout Plan
610 Linear Feet ( �.■' ��� L002-Shoreline Planting Plan(East) -
of Shoreline _� ��,���w�.• � ( L003-Shoreline Planting Plan(West)
r — — — — — — — — — — — � �,• ,• � L004-Shoreline Cross Section
5250 s.f.of � � � .•'�• � •'� L005-Shoreline Specifications+Materials
Native Shoreline � t � f••••� ��.•'� � L006-Foundation Planting Plan
��.
Vegetation ' �oo „. �''�� �.•'� � � L007-Screening Planting Plan
�.�'�� � � L008-Non-Cost Share Material Schedule
� •� S��Mo� r•�''' I L009-Sediment and Erosion Control Plan
00 •' �.��� �
� • •� � ! � _ J
� �.�� I Key Projectlnformation
8-15'Typ.Width � � �.• `„�r �
.• y I � Total Shoreline Restoration Area: 5,250 s.f.
� ��• SpruceEX � Total Shoreline Frontage:610 Linear Feet
3'Turf Strip L ,,,,r _ _ _x— - - � Averege Shoreline Width:–12,
931.5 100 Year � � _ _ /
� Flood Elevation f � �pruce EX � � � _ � , �
� u � � '
mg Oaks /
� , x x �
1 I� ElmFaisung X ' I
1 � I 1 I I
1 1 ' 1 Revdence �
, ' , ' I 11 ' I / o0
L007 � I /
� 1 I , �" I
11 1 L �r, _ _ � � _ _ _ � _ � _ � _ � _ J % .
� 1� �
1 1 / RECEIVED
1 1 1 ,
� APR -1 2014
— � S�o�ellnePbnting �
1 1, — �
4 _r _ ciTv oF oRorvo
1 ___------
_�--
_—-
. �_----
_---
� o� ,o• zo• ao• �� � � �
r
Layout Plan �
1 Scale 1"=30' Thomas Randgaard L��� ������ Q
2765 Shadywood Ln Designer:Samuel Geer
Orono,MN Date:6/19/13 �--�
�
� 3 �
W � O
C
� rt �
. y n �
Notes -—
See Sheet L008 �iled plant schedule 98-Hemerocallis'Bodacious Refurni
and materials Ifst..
'Bodacious Returns'Daylillies
18-Ajuga rep}ans'Chocolafe Chip' •
, 'Chocolate Chip'Bugleweed
36-Hemerocallis'Bodacious Refvrns'
'Bodacious Returns'Daylillies
��__ _ � 4-Ribes alpinum
. �i —
Alpine Currant
%
// • �
.
__---- - f� �-�� • ' • � • •
i
i �'�
. •
. • � • %' 4-Ribes alpinum ,,�`�
---��
� i i
Alpine Corrant
1 -Cornus alternifolio 8-Ribes alpinum 15-Diervilla lonicero y
i' Pagoda Dogwood Alpine Curtant Dwarf Bush Honeysuckle �
!• • 7-Viburnum den�atum'Chrisfom'
• 'Blue Muffin'Viburnum 5-Buxus'Green Mouniain'
i
'Green Mountain'Boxwood
� 1 -Amelanchier x grand�flora:4utumn Brilliance'
'Autumn Brilliance'Serviceberry 9-Cornus sanguinea'Cafo'
'Arctic Sun'Dogwood
.
1 -Viburnum trilobum'Bailey Compact' °
• Highbush Cranberry _
�
� �� s heferolepis 1 2-Sedum spp.'Autumn Joy'
� ;,' "� seed 'Autumn Joy'Sedum
/-� ;�/�- � 14-Sporobolus heterolepis
-' ,� � � 'Autumn Jo '
, �/,,/� � I Prairie Dropseed
edum
�-'j�' , ,���i � '� . � . ' f 4-Forsythia'Courtaneur'
_ � . � . Gold Cluster Forsythia
6-Buxus'Green Mounfain' �
,;"i
Chilton Flagsfone Steppers sef info furfgrass/ _ � . . - �Green Mountain'Boxwood
� �-- ` � ,
p• to' 20' 40' ��� � � O
Shoreline Planting Plan(West)
� ThomasRandgaard Designer:SamuelGeer ���� ���O�Q� O
SCale 1"=10' 2765 Shadywood Ln Date:6/19/13 J
Orono,MN
�, n
W �
� '
�
' � ,� � ,.�,,,;,•..� Notes
\\\\\\�\�`�� See Sheet L008 for detailed plant schedule �
��.\�������,\� and materials list. �
�\`\�
\\�� � , 7
�� ���� b39 �
,\�� 5-Cornus sencea'Isanfi'
� 'Isanti'Dogwood
1 -Hommamelis virginiona
� Witch Hazel
3-Viburnum dentatum'Morfon
� 'MorTon'Arrowwood Viburnum .
��':o.
�o -
� 1 -Hommamelis virgimana _
�
Witch Hazel
�;C
�' -
�'
O .
� �
``�t, ,O; �1
� '
)
�t i�
1�o,0i '; - —
i, _.._��
1
, �, ��J '1
�,�'J • j � �� ,
,�,�. ' �
� y�.�C'� /
1 P � .._-
.T,��`.'7dC�� � V, '— ,
> 5-Comus sericea'Isanti'
4�yY%- 'Isanti'Dogwood
j
2-Exisfing Spruce Trees
Picea:pp.
� � 5-Vibumum dentatum'Morton'
� i 'Morton'Arrowwood Viburnum
140 I.f.-$teel Edgmg
� q , �
%
1093 s.f.-Mulched Bed
��� A
5-Comus sencea'Isanfi'
,�� '; `Isant�Dogwood
� o
1 -Hammamehs virgirnona _
Witch Hazel -
o -
t o _ - -
� . . �
Shoreline Zone _
� • 1 _
. �- -
� _�__—
_ � �
o� ,o� zo� ao� �
,� Screening Ptanting Plan • �
Thomas Randgaard
SCale 1"=10' 2765 Shadywood Ln Designer:Samuel Geer �
Orono,MN Date:6/19/13 J
Foundation and S ng-Notes end Specifications - '
Site Preparation Notes Planting Notes IContinued) Screening Plant(ng Materlal Sthedule
t Contractor shall remove the existing tur(grass in the spxified area using a sod-kicker 3. Contractor shall layout the planc matertals In the specified locations for approval by Material QTY Unit
or a mechanlcal sod cutter.The u�derlying soils shall not be unnecessanly disturbed. landscape designer prior to installation. Edging�Black Plastic:50'roll) 140 If
2. Contractor shal�remove all leaves and loose debris prior to planting. 4. Contractor shall install all plant materials as specified In the relevant plan and cross fdging Spikes 35 each
3 Contractor shall cut and remove all(nvasive trees and shrubs that have been marked by the section detail. Double-Shredded Hardwood Mulch(3"depih� 36 cy
landscape designer,leaving a stump no higherthan 3"above grade The stumps 5. If contatner grown,gently slide plant out of container and scarify any rootbound
shall be brush-treated with undiluted Garlon concentrate immediately after the cut plants without damaging more than 10%of existing root mass.
has been applied 6. Ball and burlap trees and shrubs must have the wire basket removed and the burlap Foundation Planting Material Schedule
sack loosened from the top 12"of root ball to allow for adequate root growth. (ZTy Unit
Erosion Control Notes 7. Contractor shall Install mulch to a depth of 3"on all specified planting beds.Mulch Materlal
shall be installed prior to planting to preveni compaction and raked to a neat and Edging(Black Plastic:50'roll) 320 If
1 All construction shall co�form to local and state rules as required Contractor will even finish upon completion Edging Spikes SO each
take all measures necessary to ensure that no sediment leaves the project site during 8. Contractor assumes respons�bility for replacement of all plant materials that die Double-Shredded Hardwood Mulch�3"dep[h) Z 1 �Y
construction.The specified sediment control devices must be Installed In conjunctlon within one year of inztallation.All replacement plant materfals shall have an Z^Thick Chilton Flagstone S[eppers 2 Tons
with all clearing in a manner as to ensure that sediment and sediment laden water additional one year warranty for replacement.
do not enter the drainage system,roadways,or violate applicable water standards
2 All temporary erosion control devices will require maintenance while they are installed. Sc►eening Plan-Plant LiSt
The Contractor shall routinely check these devices for sediment buildup,vandalism, $IZE SPACING
and general operabiliry.The Contractor is responsible for inspectinq these devices on QTY Botanical Name Common Name
a daily basis and after every rain event.Sediment shall be removed when it
reaches 1/3 the capacity of the device.Maintenance,cieaning,sediment removal, Trees and Shrubs
and final removal of the temporary erosion control device are Incidental expenses 15 Cornus sericea'Isanti' 'Isanti'Dogwood #2 Cont. 48"O.C.
assumed by the contractor. ri2 Cont. 30"O.C.
3. Contractor shall lay not leave any areas of exposed soil unattended for more than 3 Hammamelis virginiana Witch Hazel
48 hours. 8 Viburnum dentatum'Morton' 'Morton'Arrowwood Viburnum #2 Cont. 60"O.C.
4 All work shall be completed using hand tools or Iight mechanical equipment(i.e.
no skid loaders or tracked vehicles The contractor shall get approval from Foundation Plenting Meterial Sthedule
the landscape designer for any questionable equipment.
5 Contractor shall maintain the spxified coir erosion control blanket in place during QTY Botanical Name Common Name SIZE SPAC�NG
planting to prevent soil disturbance and slope failure.Contractor shall cuf the coir
blanket as needed to install plant mater�al as specified.
6 The implementation of erosion control actrvities and the construction,maintenance, ShtubS
replacement,and upgrading of the specified devices is the responsibility of the 1 Amelanch�erx grandifloro 'Autumn Brilliance'Serviceberry #20 Clump
contractor until all construction is completed and approved. 12 Buxus'Green Mountain' 'Green Mountain'Boxwood �12 Cont. 36"O.C.
7 The specified erosion and sediment control devtces shall be inspected daily by the 1 Cornus alternifolia Pagoda Dogwood #10 Clump
contracror and malntained as necessary to ensure their continued(unctlon.All #2 ConL 48"O.C.
disruptlons to their continued function shall be repaired within 24 hours maximum. 9 Cornus sanguinea'Cato' 'Arctic Sun'Dogwood g2 Cont. 30"O.C.
B These plans depict minimum erosion and sediment control BMPs Additional BMPs 15 Dievilla lonicera Owarf Bush Honeysuckle
may be necessary as site or climatic conditions change. 4 Forsythia'Cowtaneur' 'Gold Cluster'Forsythia #2 Cont. 42"O.C.
16 Ribes alpinum Alpine Currant #2 Cont. 42"O.C.
Planting Notes 7 Viburnum den[atum'Chnstom' 'Blue Muffin'Viburnum #2 Cont. 60"O.C.
t. Contractor shall provide the landscape designer with the opportunity to Inspect all 1 V�burnum triolobum'Bailey Compact' Compact Highbu5h Cranbeffy #2 Cont.
specified plant materlals. Advfse landscape designer of source of plant ma[erials.
Plant materlals to be nursery grown stock unless otherwise noted.Plants shall meet perennials
or exceed ANLA specifications appropriate ro the plant type.Landscape designer 18 Ajuga reptans'Chocolate Chip' 'Chocolate Chip'Bugleweed 4" 12"O.C.
reserves the right to reject any provided materfals at the contractor's expense.
2 Plants and pot sizes shall be as specified In the plant Iist If substitutfons are requlred, 134 Hemerocallis'Boadcious Returns' 'Bodatious Returns'Da lillies #1 Pot 18" • •
contractor must get approval from the landscape designer. 18 $edum spp.AutumnJoy' 'Autumn Joy'Sedum kl Pot 18"O.C.
3o Sporobolus heterolepis Prairie Dropseed Nl Pot 18"O.C.
p� to' zo' ao' � � �
��C� o
Non-Cost Share Plantings and Material n�� O
Schedules ThomasRandgaard Designer:SamuelGeer �„A�� ���0�711r1
2765 Shadywood Ln Date:6/19/13 J
Orono,MN
��
W
�
��
Lao� -- � �
La' �feto�ka ��t t � F�`' � `' -
! ' Erosion and Sediment Control Notes
929.400HWL � , �
r{ (_ • 1. All constnxtlon shall conform to laal and state rules as required Contractor wlll
„ . take all measures necessary to ensure that no sediment leaves the projxt site during
610LinearFeet � � constructionThespecifiedsedimentcontmldevicesmustbeinstalledinconjundion
of Shoreli�e � with all clearing in a manner as to ensure that sediment and sediment laden water
� � �\'� .�� donoten[erthedrainagesystem,roadways,orviolateappllcablewaterstandards.
\� ��,\ 2. All temporary eroslon control devices will requlre maintenance while they are installed.
52505.f. ofNative Vegetdtion ,, ,, ,, �' �\�`t. TheContractorshallroutmelycheckthesedevkes(orsedimentbuildup,vandalism,
andGeojuteE.C.Blanket � '� �'! andgeneraloperablbty.TheContractorisresponvWeforinspectingthesedeviceson
a weekly basis and aker every raln event.Sediment shall be removed when It
��\i `\� reaches i/3 the capatity af the device.Mafntenance,deaning,sediment removal,
520L.f.OfSiltFencing �'� ,"`a ' andfinalremovalofthetemporaryerosloncontroldevlcearelncidentalexpenses
\�• � assumed by the mntracror.
to endose planting area � --- � �
3 Contractor shall endeavor to complete the constructlon process at the earl�est possible
(Existing) n Raingarden , tlmeandwillrestorevegetativecmertothesiteassoonasitlsmechanically
�• � _■�� #2 , 4. AIISwork 9hall be completed using hand tools or light mechanlcal equipment(I e.
� i �aingarden#1 ��¢ Thecontractorshallgetapprovallromthecdesignerforanyquestfonableequipment.
' �.� � 5. Contractor shall malntaln the specified coir erosion control blanket In place during
� !„• ; '`` "c ' ��, f plantlng to prevent soil disturbance and slope failure Contractor shall cut the colr
„�''` �a � blanket as needed to Install plant materlal as specified.
4 /� c 6. The Implementation of eroslon control activitles and the constructlon,mainteoance,
931.5 100 YeOf ���'" � ^ � , � o ' replacement,and upgrading of the specified devices is the responslbility of the
Flood Elevation '�P���eEx , ; ) .
r contractor unN all constmctlon is completed and approved.
i / ' � , �� I f 7. The spedfied eraslon and sedlment control devices shall be inspected daily by the
3'Turf Strip mg oaks" � � c contractor and malntained as necessary to ensure their continued funcNon.All
(ExiSting) � z . Kx ' ��' � disruptions to their continued fundion shall be repaired within 24 hours maximum
9 Elny ERist�rig „ z / g, These plans depict minimum erosion and sediment control BMPs.Addrtional BMPs
52ft5tfdwlog5 � J _ maybenecessaryassiteordimaticconditionschange.
to ca ture sediment 9. The contractor or designer shall submit a weekly report to staff regarding the status of
p • ExistingPileof theerosioncontrolpractices
(Prop052cJ) � ees�dence . I Excavated Soil
46 ft Strew Logs � � ,o, Surrounded by
to capture sediment ` � Straw�ogs Erosion and Sediment Control Material Schedule
(PropoSed) ';�, �; � ��+ , Item
Limits of Site Number Materials Description QuanNty Unit
8 ft Straw Lo s x 2 �;� G� � � Disturbance 1 Silt Fencing �oo o �F
to direct flows � � � � / 2 GeoJute Eroswn Con[rol 8lanket 5250 0 SF
i � 0?2 / 3 Biostakes 400 0 CY
(Proposed) � 1� � 4 6'x 6"Diameter Straw Logs 30 0 Units
� I - --
' , � - 5 WoodenStakes 1200 Units
• , _yiw
�htA �_ 1Fl.h;_.
I _
"�r-_ ------ �
184 LF.of Silt Fencin9 � _�.��'�`� _ _� - --- -_ -
(Existing)
, --,, __�
Boulder Armouri�g -� -
(Existing) ,�.,,.�;� :� i_�,uo ___----
r,� _�---
-----
Lake Minnetonka -—�
�_—�--
p- t o' 20' ao' � � � �n �
��
Sediment and Erosion Control Plan � L, \1 �
� Thomas Randgaard Designer:Samuel Geer L��� ���8�� O
Scdle 1"=30' 2765 Shadywood Ln Date:3/17/14 J
Orono,MN
�
�
��
��
- ` �� _
2 EXIStitlg � � � � �1 � Power
.�.�; ���`µ,. pruce ,. — � I sox
:;:�', :;,,, (�
wn,,.;:w:�'�,;,'�x:'�° ��` � i ' +Basin Elv
' �_. . ` ,y`=9321 lt Elv 932.1 +��. � � �� �_��� ;'�
� � � Overflow Elv � — — '`�'�' '' '
-----` ------`--���32•� / ` ` ' /
,---� �---�"
�- � • � � /
i� �� Basin Elv ' `,''„ ` ,�'„i
�� �utlet Elv �'932 3 + ,, , ; ,�� � / � / '
Z�-'�—-__� �_ , utl�t'�I 356 S.F Rain Garden � ��. � �
� --�:3 `! 251 S.F.Basin Area � /
/ � ---I - , `
1 I / ,
I 1 /
— � - � /
� � '��, �I
� 3%Pi e � 2.5%Pipe �': �� ;
p Slope �; I
Slope � I
\ �
� \ + idewalk Elv !�
934 � �i�33.8 �� �
' /1 Sidewalk Elv P33.0 utle i I
� 934.6 �
� VC Inlet Iv � I Grading Symbols
1 3�/oW —� 33.1 —__ � - - Proposed4"PerforatedDrainTile
� �, �
_-:���`�"���-��Q 2 / ,�y' �� � Proposed 4"PVC Rigid Pipe
:�" /
, 2%Siope� Si ew� Elv � '1%Slope~ ,� j� Existing Contour
� 93 il ir� � � ;
M i n �_,_-----� : .�'�. ! ?"r �
�-,..= —r'�'- �f ``' � - asin ,----� Basin Elv
i � � �-, tch Basin —�— Surface/ImertElevatlon
� � �• I�.,J,, 5��a,de'.��'"�' .2 Grade 932.1
vert
�Sump Pump , �� -������2� ExistingSiteElevation
��'' ' ���
Downspout Catch Basin Notes
935.1 Grade
934.6 Invert }.Z- See Sheet L004 for detailed materials list and notes.
o- ,o� �o� � 40� �C�� � � N
Rain Garden Grading Plan �
� ThomasRandgaard LA�� ������ �
SCdle 1"=10' 2765 Shadywood Ln Designer:Samuel Geer J
Orono,MN Date:7/10/13
�
`� n
.� �
�
. �
STATE OF MINNESOTA )
) ss
COUNTY OF HENNEPIN )
The undersigned, being duly qualified and appointed City Clerk of the City of
Orono, Minnesota, certifies that I compared the foregoing resolution adopted at the
meeting of the Orono City Council on April 28, 2014,with the original thereof on file in
my office, and the same is a correct transcription thereof.
WITN�SS my hand officially as such City Clerk and the corporate seal of the
City this�day of , 2014.
,,
, , , L��--���� �0l�(�.
�:
. t �„ City Clerk
, :.
, �,;
" < , � - '�° ; �..
� y; q r ,
� +1 A L.Y. ..
.,a' ,��� . ... � .
.�::� ! yF� .. ..
; 5 �, ,
. �r _ ri.y`� . .
� ��b+"'t`t a � . . .
.7
R
. a7�os .S�,adY�� �
� Doc No T05175189
Certified, filed and/or recorded on
Jun 4, 2014 10:00 AM
Office of the Registrar of Titles
Hennepin County, Minnesota
Martin McCormick, Registrar of Titles
Mark Chapin, County Auditor and Treasurer
Deputy 30 Pkg ID 1116719M
Doc Name: Resolution
Document Recording Fee $46.00
Documenf Total $46.00
Existing Certs New Certs
1072265
This cover sheet is now a permanent part of the recorded document.