My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: grading plan
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2100 Shadywood Road - 17-117-23-31-0041
>
Correspondence
>
Re: grading plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:36:25 PM
Creation date
9/19/2018 9:48:58 AM
Metadata
Fields
Template:
x Address Old
House Number
2100
Street Name
Shadywood
Street Type
Road
Address
2100 Shadywood Road
Document Type
Correspondence
PIN
1711723310041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � <br /> 2335 Highway 36 W <br /> St.Paul,MN 55113 <br /> Tel 651-636-4600 <br /> Fax 651-636-1311 <br /> www.bonestroo.com <br /> ]une 12, 2009 �Bonestroo <br /> Ms. Melanie Curtis <br /> Planning and Zoning Coordinator <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: 2100 Shadywood Road <br /> File No. 000139-09000-2 <br /> Plat No. 2009-00249 <br /> Dear Melanie: <br /> We reviewed the grading plan dated 6-4-09 for the proposed new home construction at <br /> 2100 Shadywood Road. We reviewed the plan for compliance with Chapter 79 of <br /> Orono's Land Use Code. We have the following comments with regards to engineering <br /> matters: <br /> • The grading plan is acceptable from an engineering standpoint. <br /> • The applicable code section is 79-7(c)(1) for individual residential lots disturbing <br /> less than 1 acre of land and fill or excavation of less than 100 cubic yards. <br /> • All submittal requirements have been met except 79-7(c)(1)(h) regarding <br /> appropriate best management practices listed in Section 79-9. <br /> • To bring this submittal in to compliance with the ordinance, the following <br /> information should be provided separately or on the grading plan. <br /> o A statement indicating the plan to handle waste and material disposal. <br /> o A statement indicating the plan to handle hazardous materials. <br /> o A statement indicating the plan to handle liquid waste. <br /> o Show that adequate sanitary facilities will be provided for site workers. <br /> o A statement indicating that any sediment tracked on to a public road will <br /> be removed by street cleaning before the end of each workday. <br /> o Identify and show drain inlet protection for storm sewer on the project <br /> site and along haul or delivery routes. <br /> o A plan indicating the erosion and sediment control inspection and <br /> maintenance requirements as stated in Section 79-9(g)(1),(2),(3),(4) <br /> • The $2,000 financial guarantee identified in Section 79-7(b)(2) should be <br /> sufficient for this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.