December 14, 2009
David Schell
46 Mounds Boulevard
St. Paul MN 55106
RE: Permit 2009-00249 - 2100 Shadywood Road
Chad Johnson recently visited your job site at 2100 Shadywood Road to follow up his letter of
November 13 concerning winter erosion control. He indicates that your silt fence is not fully
functioning. You should re-erect the fence as shown on your building permit survey or MCWD
permit. If you are unable to re-erect the fence you should install equivalent measures. Your job
site will be rechecked early next month and if it remains out of compliance the City will consider
issuing a stop work order.
If you have questions contact Chad at 651-604-4939.
Sincerely,
Evelyn Turner
City Planner
Telephone(952)249-4600 • Fax(952)249-4616
www.ci.orono.mn.us
Evelyn M. Turner
From: Johnson, Chad A[Chad.Johnson@bonestroo.com]
Sent: Thursday, December 10, 2009 6:07 PM
To: Evelyn M. Turner
Cc: Tom Kellogg
Subject: RE: FYI Winterization Letter mailing
Attachments: image001.jpg; Winterization Letter Compliance Summary.pdf
Evelyn,
As requested I stopped by all of the sites you mailed the Winterization Letter to and have attached a summary report of
the things I saw at each of the sites. For the most part all of the projects that should have temporary or permanent
stabilization down for the winter did. The only problems I saw were; one project had no perimeter protection and a few
projects had silt fence that needed to be fixed up and maintained. Please feel free to contact me immediately should you
have questions on any of the sites.
Thanks,
Chad 7ohnson, CPESC, CPSWQ
Direct 651-604-4939
Cel I 651-325-6860
chad.johnsonC�bonestroo.com
� Bonestroo
From: Evelyn M. Turner [mailto:ETurner@ci.orono.mn.us]
Sent: Friday, November 13, 2009 3:23 PM
To: )ohnson, Chad A
Cc: Kellogg, Tom P; Lyle Oman; Melanie Curtis
Subject: FYI Winterization Letter mailing
Chad:
Tom reviewed your letter and indicated it was appropriate to send out to the smaller
projects that you haven't been monitoring. I left your name on it because I didn't think
there was anyone here who could answer technical questions about it. Because of the
delay in sending it out I added a few days to the compliance deadline. These are going out
in today's mail so you can expect phone calls on Monday.
All but two of these are single-family houses under construction on isolated lots. Some
have just commenced, some have been under construction for a while. Crystal Place is a
detached garage on a tiny lot that disturbed most of the lot. (Jasin even removed part of
his house to provide access to the garage.) Cherry Avenue is a major addition between the
lake and a wetland. Tom and Darren reviewed the grading plans for all these permits.
There may be more letters going out next week as I dig more information out of the permit
system.
Evelyn Turner
i
Summary of Erosion and Sediment Control Compliance on
Sites after Receiving the Winterization Letter.
1. 4701 West Branch Road. No functioning perimeter protection on site, all open soil
should be enclosed with perimeter protection.
2. 3127 Casco Circle. Perimeter protection is in place and functioning properly, there
was open soil on site but it is considered active so at this time it does not need to be
stabilized.
3. 3186 North Shore Dr. Silt fence on site needs maintenance and there was open soil on
site but it is considered active so at this time it does not need to be stabilized.
4. 3825 Cherry Ave. Perimeter protection is in place and functioning properly and all of
the open soil has been stabilized for winter.
5. 2933 Casco Point Rd. Silt fence on site needs maintenance and there was open soil on
site but it is considered active so at this time it does not need to be stabilized.
6. 1981 Fagerness Point Rd. Perimeter protection is in place and functioning properly,
there was open soil on site but it is considered active so at this time it does not need to be
stabilized.
7. 3485 Crvstal Place. Perimeter protection is in place and functioning properly, there
was open soil on site but it is considered active so at this time it does not need to be
stabilized.
8. 70 Wear Lane South. Project is complete and all open soil has been stabilized with
sod.
9. 200 Biederwood Dr. Perimeter protection is in place and functioning properly, there
was open soil on site but it is considered active so at this time it does not need to be
stabilized.
10. 2100 Shadvwood Rd. Silt fence on site needs maintenance and there was open soil
on site but it is considered active so at this time it does not need to be stabilized.
. ,r;;0���0�` :
�; �� � ��, Bonestroo
. � ;�� ����: �
:<< � � �
;
�, ,s,:,-��� G�„
`\\��sx�°`'��,
November 13, 2009
David Schell
46 Mounds Boulevard
St. Paul MN 55106
RE: Permit 2009-00249 - 2100 Shadywood Road
The active summer construction season is fast drawing to a close here in the state of winter and
frozen ground. As we move into a new season it is important we take the proper precautions on
our active sites to help eliminate any erosion problems or added expenses that may be incurred
due to winter freeze thaw events and the inevitable spring runoff. As construction continues
throughout the winter in the City of Orono it is important to minimize the amount of open soil by
providing temporary or permanent cover, one of the key elements in preventing soil loss. It is
also required that the appropriate BMPs be maintained on-site by December 1, 2009 as follows:
■ Exposed soil areas must be stabilized with the appropriate seed mix and erosion
control blanket, disc anchored mulch applied at a rate of 2 tons per acre or other
effective means to control erosion.
o Areas requiring stabilization will include but are not limited to small
miscellaneous areas, landscaping areas, sidewalk backfill, non-active
stockpiles, finished grading areas, etc.
o Areas being worked after November 26th must be stabilized weekly until
construction ends.
o In the event that it snows and there are frozen ground conditions,mulch can
be applied effectively over the snow.
■ Seeding must be completed with the appropriate seed mix as indicated below.
Dormant seeding shall be done in the later fall after the soil temperature is
consistently below 50 degrees Fahrenheit. Seeding done before or after the indicated
seed dates may require reseeding if the seed does not take. In the event that it snows
and there are frozen ground conditions, seed can be applied effectively over the snow.
Fall and Dormant Seedin Dates
Seed Mixture Number Fall Dormant Seedin
100 Aug. 1 —Oct. Oct. 20—Dec. 1
1
150, 190 July 20—Oct. Oct. 20 - Dec. 1
20
240,250,260,270 July 20— Oct. 20—Dec. 1
Sept. 20
310, 325,328, 330, Sept. 20— Oct. 20—Dec. 1
340,350 Oct. 20
■ Rock construction entrances to access the construction site and prevent tracking
sediment off site
■ Silt fence or an approved perimeter control device shall be installed to control ,
runoff
■ Soil stockpiles should be eliminated or consolidated to the extent as possible and be �
protected with perimeter control and mulch applied on all stockpiles that will remain
dormant for the winter months.
■ Storm Sewer inlet protection including curb and gutter catch basins, parking
lot/road drains, and backyard drop inlets must be:
o Maintained in a manner where all removal of sediment and debris, repairs as
necessary, and or replacement are completed by November 26�', 2009.
Sediment shall be removed when occupying greater than 1/3 the volume of the
device, placed in an upland area and stabilized.
o All "in-structure" and "on-structure devices shall be removed from the storm
sewer inlets by November 26�', 2009 and re-installed in the storm sewer inlets
by April l, 2010.
BMP installation, such as silt fence,has a tendency to be more costly to install during the winter
months therefore it is recommended that all installation occur prior to the ground freezing on
sites where work is proposed to be done during the winter months. Regular construction site
inspection will occur throughout the winter months, and compliance with the Minnesota
Pollution Control Agency(MPCA) construction site general permit and the City Land
Disturbance Permit will be expected.
If you have any questions regarding these construction site winterization issues, please feel free
to contact me at 651-325-6860. Thank you for your cooperation in preserving the surrounding
natural resources within the City of Orono.
Chad Johnson, CPESC
Te1651-604-4939
Ce11651-325-6860
chad.j ohnson@bonestroo.com