HomeMy WebLinkAbout2011-00974 - detached garage CITY OF ORONO PERMIT NO.: 2011-00974
., � 2750 KELLEY PARKWAY
ORONO,MN 55356- DATE ISSUED: 09/13/2011
952 249-4600 FAX: 952 249-4616
ADDRESS : 1978 SHADYWOOD RD
PIN : 17-117-23-24-0026
LEGAL DESC : SHADY-WOOD
: LOT 000 BLOCK 000
PERMIT TYPE : ACCESSORY STRUCTURE
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : GARAGE-DETACHED
ACTIVITY : 438-ADDNS OF RES GARAGES&CARPORTS
VALUATION : $ 10,000.00
NOTE: SEPERATE PERMITS REQUIRED:ELECTRICAL(STATE)
ADV.PLAN REVIEW PD 8/3U11 2011-00973$124.64
* FINISHED GRADES SHOULD LOSELY MATCH EXISTING AFTER HARDCOVER REMOVALS
* AS-BUILT REQUIRED.�(INITIAL)
APPLICANT pERMIT FEE SCHEDULE 191.75
PETERS,BRIAN STATE SURCHARGE(VALUATION) 5.00
1978 SHADYWOOD ROAD TOTAL 196.75
WAYZATA,MN 55391-
OWNER
PETERS,BRIAN
1978 SHADYWOOD ROAD
WAYZATA,MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires sepazate
permits. All provisions of laws and ordinances goveming this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections aze
requested in conforman � the State Building Code.This permit may be
revok y time f d ause.
� .r�- �y` 9 i ��3 i i� i i
Applicant Permitee Signature Date Iss d By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
, � z� l
� � .��
City of Orono � ��
�
Building Permit Application
for New Structures or Additions
MailingAddress: Permitnumber: ad//� a097y
�g,O�. PO Box 66
r�0 y � Crystal Bay,MN 55323-0066 Date received: �'✓�/� /1
�I �'"� ' � Received b G�S
` �"7 a,, StreetAddress:' y� r�� `�
\�'�c, ,�k� G� / 2750 Kelley Parkway Plan review fee: �ZT l0 T G�
\L9g�H�g�� Orono,MN 55356
, ,�p//— 00973
�-
STRUCTURE INFORMATION:
1.Structure Dlmensions 1.Structure Dimensions(continued) 2.Type of Construction
a.Length(ft.)= o� 1 Number of bedrooms= ❑Wood/Frame
❑Masonry
b.Width(ft.)= �� Number of garage stalls: ❑Metal
Attached= ❑Pole Bldg.
Areas in sauare feet Detached= ❑ICF
❑On-site Prefab
c.Basement= '--' ❑Off-site Prefab
d. 1"Story = �(�d�0 ❑OtF►er(please specify):
e.2nd Story= ^
f. '/:Story = �
g.Total Area= �v�
REQUIRED SUBMITTALS:
All of the information must be submitted in order for our a plication to be rocessed:
Not
Enclosed licable
❑ Permit lication
,�. ❑ Pro d Buildin Plans
❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form
�- ❑ Surve meetin all re uirements
❑ ❑ Stormwater Pollution Prevention Plan
� ❑ Hardcover Calculation s
❑ ❑ Se tic S stem Site EvaluaUon Re ort
❑ ❑ Access Permit
❑ ❑ Wetland Buffer Im rovement Plan
❑ ❑ En ineered Plans for Retainin Walls 4 feet or above
�1.. ❑ Plan Review Fee
❑ O Other
APPLICANT ACKNOWLEDGEMENT:
. Agrees to provide all information required or requested by the Building Department;
• Agrees to pay the City of Orono for engineering consultant revfew costs In excess of E500;
• Certifies that the information supplied is true and correct to the best of hislher knowledge. The applicant recognizes that they
are solely responsible for submitting a complete application being aware that upon failure to do so,the staff has no altemative
but to reject it urttil it is complete;
• Acknowledges the Escrow Agreement is completed and signed;
• Understands some or all of the informaUon that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject
of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our
purpose and intended use of this infortnation is to annually update our records and records of other govemmental agencies
required by law. If you refuse to supply the information,the application may not be issued.
• Agrees that in the eve�that weather or other conditions prevent the completion of an as-built survey at the time the
Certificate of Occupancy is requested,a temporary Certificate of Occupancy may be issued upon receipt of a 510,000
escrow to ensure completion of the as-built survey and all site improvements.
` //ApplicanYs Signature: 'G'� Date: '�� ��
, . � Plan Review Checklist for New Structures / Additions
Address/ PID/ Legai: t g Z � ��(,�u �� �Q�Q (�.O�4�
Description of work: ��`7'�C.bi-t,� ��}�2r� 6(_,
Septic review by: �'V�/4 Date Approved:
:Zoning review by: /�1 L � Date Approved: � '/Z- / �
Buifding review by: Date Approved: a ' 1 2. ' / �
Grading review by: Date Approved: 9 - /2- / �
Zoning File#: � 1 - 3 S 1ti1 Resolufion#: ����(C�� � Resoluti . el` ti���t UV��.G� �•`�1� �
��� � � ��
Zonin District Fire Department Post Office ' School is rict
Zoning: Lot Area: l 3, L9� SF/AC Width: Depth:
Survey Submitted: �''S'es 0 No Date of Survey:�--�- ��, o�i
Proposed Setbacks:
Front�{Lake) -Reaf(Street) ( � S E W ) ( N � E W ) Other Buildings Wettand
Side Side
� ' 9 .-1 �o ` �.�' I � ' N (A
Building Defined Height: b •�`- Building Peak Height: (9 .�� #of Stories Ok?: � YES
FOR A BUILDING WITH-A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION:
START WITH the distance betweenthebasement floor/crawl START the distance between the slab and the highest
space floor and the highest roof peak,the top of WITH roof peak,the top of the cornice of a ftat roof,
the cornice of a flat roof;the deck line of a • the deck line of a mansard roof, or the
mansard roof, or the uppermost point on a round uppermost point on a round or other arch-type
or other arch-t e roof roof
SUBTRACT half the distance between the highest window and SUBTRACT half the distance between the highest window
hi hest roof eak of a itched roof and hi hest roof eak of a itched roof
SUBTRACT the distance between the basement floor/crawl ADD the distance between the slab and the highest
space floor and the highest exisfing grade within existin rade within the foundation
the foundation or 10 feet,whichever is less. EQUALS Defined buildin hei ht
EQUALS Defined buildin hei ht
Lot Coverage: 2y q { SF i'� %
Shoreland District MCWD Permit Received Avera e Lakeshore Setback Bluff
❑ Yes ❑ No N/A � Yes No
�Yes ❑ No � Yes 0 No ���A Setback:
Permit Number:
HardcoverZones Existin Proposed Variance Required CUP Required
0-75' 2`'I o • � bs Yes ❑ No ❑ Yes �No
75-250' S<-ld �Zb TYPe(S)� S�r/3r�u� TYPe�s��
250-500' � �� �' N"'��'°''�"
- f.��r Co,,.o"�rzS�
500-1000' ,� �
REMARKS (rn-house):
Updated: 09/11/2009
z:lformslplan review checktist.docx
Fees to be Charged YES NO ' •
!`��'Srl9�l�{�A�*'e�fR���Y..:.k 't��hV.f�j��r�.VCX1ir '`���An:'.s�.;'r_�f..R,L l'�-vl n - �Po��m$ � i��R}�P��F.�?�,7
'Y#
Ptan Review v
,. .
��S�taxe�SSua�rc�a �e �"��"���`�`�� ��� . .� k. �.� , , ��� ,#����� ����� ��
�
�.�� s�°I,�� »�u�� w�.�E�a '� �:a �.�:. ����r�c��t._ F,r_�a���t��r "'�n�'a
Investigation Fee
'SAC-'�N�urn�ber�of�SAC>U;nits. . _ ��°�� ,:��5� '� �, ��,�
,
, ,...,: ..., ,.o-�:�,,� k�..,r. �.
,- _.,a., ..,:.,.,.�.
Sewer Connection
,Water�Gornnsction , i �a,.� '� °'_� ���;�;��,�
-�s � ,� ,.,.
Park Fee
;'��`A�����5 .P.�V.�pAll � u,�4��r- --t;'+.'�,#�" ,,ra ��r �i•S��p��`�E h7 ��FY r,
'.a,*����,.=..y.u9��r,r�r ���i'FE'7.�� ;:�n ���F�i� ��•��`[��,t�T f F�°�� r `- i
_. rw v , .. ..... , a�, ...,.,��r ..
Other(specify)
�I�Sii'�iy���W�,Yw7 �r�i.�7 '� �`[t1��� 3 . � ' V .4 . }�� .� .+� a.•5: yL�.1:�;�,•,'�
ti ,: , � ��":k�^�.��..��.,wbd'�epFY.. �+)�������. � .. �.. �,'r��+�"Tz���
.n..i,L,+�eWYwA'�+T�1:fa4lYk.bf.e."�, .YSk.L���nf�
Caiculated By:
Square Foota e $ per Square Foota e
Basement X = �
1 S' Floor X = $
2nd Floo� X = �
Garage X = $
Estimated Construction Value: � I 0,(��n °6
Orono Inspections Required Work Requiring Separate Permits Required State Permits
� Site � Plumbing ❑ Grading/ Filling � Well
❑ Hardcover Removal 0 IVlechanical ❑ Fire Efectrical
Footing ❑ Septic D `Water Connection
0 oured Wall 0 Fireplace ❑ Sewer Connection
Foundation Survey 0 Masonry ❑ Lawn Irrigation
0 Radon Rock Bed � Mfg.
Framing ❑ Other(specify)
D.�n�ulation
; 'I�^� s-Built Survey
��%� �Final
� Other(specify)
REMARKS (in-house):
Other Review: Reviewed by: Date Approved:
Access:Existing: � YES ❑ NO New: 0 YES � NO
� , ' ;' � �� 'i � � ` :", . G PERMIT) ,_
� I , Y PERSON PULLIN
�d�,�' :� ==�+ ''� .�' � ;r � � �l y r �. r:--s ,�-�, �a�,a �-�-,>/' � � -�-� �.,,�
B NOTED ON PERMIT AND INITIALLED B
'�—�'� - >.•� � , ,, .R �„ - � [ � �; � ,v �
•t Y li' :•�•` '✓ �.^'C�' f-�f�4 �(v= •�-^'
� � � �
� ,g�" � `,`�"� �
Updated: 09/11/2009
z:\formslplan review checklist.docx
�'� � � � D� TIME v
CITY OF VI'SIJNO CALLED IN '
INSPECTION NOTICE SCHEDULED / �
PERMIT NO. � �� COMPLETED
ADDRESS �
OWNER (�l A � �"-S TELEPHON NO. - -5a7'Z
CONTRACTOR
>; DESCRIPTION vL < �����
�
ly ❑ FOOTING ❑ PLUMBING FINAL ❑ EXC / ADING/FILLING
� ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
�
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
C
�
J
O
�
�
O �,; ,' i--
W I�_� �' ` i�.
� '
Q
�
Z
W
�
W
�
�
d
W ❑INORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
� ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WlLL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
� INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
OwnerlContractor pn site: �
Inspector. 't t.`� �� i , 5`i-��\'
�
White Copyllnspector's File Canary CopylSite Notice
�r ATE TIME ✓
CITY OF ONO �� � �
INSPECTION NOTIC CHEDULED �J �'�
PERMIT NO�G/� O�� COMPLETED
ADDRESS �
OWNER � LL HO NO.� - �
CONTRACTOR G�!/�- �C.?�`� '�'
>; DESCRIPTION
�
� ❑ FOOTING ❑ PLUMBING FINAL EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHOREM/ETLANDS
� ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Z
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU�YES_NO
� COMMENTS: /
�
W
�
� ,��l 5 L� A (�e A d � ���� � -�ec�
0
�
� �
0
� �- �/� �� n s o �
W
�
Q
ti
Z
W
�
W
�
�
� �RKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑ INSPECTtON REQUIRED.CALLTO ARRANGE ACCESS.
Call forthe next inspection 24 hours in advance. (g52) 249-46��
OwnerlContractor on site:
Inspector. �
White Copyllnspector's File Canary Copy/Site Notice
�_ � �cr� // A //�y TIME
CITY OF ORONO CALLED IN
� �� ��f
INSPECTION NOTICE �CHEDULED I � �
PERMIT NO.a�l � ��7 COMPLETED
ADDRESS
OWNER TELEPHONE N . � — — �
CONTRACTOR � — ��
� DESCRIPTION �Lj�� ��'�`�X�-�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPtAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACT TO MEET YOU:_YES_NO
� COMMENTS: LS C/[�l� �/�UG� �'�
a �/Pit- ���
�
J
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
�
a �
W� ❑WORK SATISFACTORY:PROCEED 'Q�PROJECT COMPLETE
- �
W ❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETURN
❑ CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Cail for the next inspection 24 hours in advance. (J52� 249-4600
OwnerlContractor on site:
Inspector. �-,,TP
White Copyllnspector's File Canary CopylSite Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE m SCHEDULED J L'Zk� l I
PERMIT NO. 7�I(—'O�+'l,� COMPLETED
ADDRESS ��� ���WOO� �(�
OWNER TELEPHONE NO.
CONTRACTOR
>; DESCRIPTION ���� ���
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOILOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
�
J
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
j
d
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
� ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
0 ❑CORRECT WORK,CAIL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952� 249-4600
OwnerlContractor on site•
Inspector. l��
White Copyllnspector's File Canary CopylSite Notice
t ,
• • • �
� ' • . 1
emo
To: Finance Department
From: Christine Mattson, Planning Assistant /
� ��
CC: Street File
Date: 1/3/2012
G/L: 101-22205
Re: Building Permit Escrow Refund
Building Permit #2011-00974 pertaining to construction of a detached garage at
1978 Shadywood Road is complete. The Applicant, Brian Peters, has requested a refund of
his $2,500 escrow.
The following is attached:
• Email from Bonestroo indicating $164 of unbilled WIP on this project. The unbilled
amount does not exceed the ailowed $500 credit.
• Email from Campbell Knutson indicating no unbilled WIP on this project
• Original signed escrow agreement
• Copy of cash register receipt showing escrow amount received
PLEASE CK TO BE PICKED UP BY:
an P te s 2� I;ti�-�j�L�
U
e i t
t
� 1
w:\street files\shadywood road\1978\escrow refund memo 2011-00974.doc
Christine Mattson
From: Darren Amundsen [Darren.Amundsen@bonestroo.com]
Sent: Wednesday, November 30, 2011 3:43 PM
To: Melanie Curtis
Cc: Christine Mattson
Subject: 2011-00974 (11-3514) 1978 Shadywood Rd 11-30-11 asbuilt
Attachments: 2011-00974 Shadywood Rd 11-30-11 as-built.pdf
I'll have $164 in WIP Chris. $82 from Sept and $82 now.
Darren Amundsen, PE
Associate
Stantec, formerly Bonestroo
Tel 651-604-4894
Cell 651-775-5623
da rren.amundsenCa�stantec.com
stantec.com
Bonestroo has joined Stantec. a professional services consulting firm recognized for its leadership in
sustainability, depth and diversity of talent, and technical expertise.
The content of this email is the confidential property of Stantec and should not be copied, modified,
retransmitted,or used for any purpose except with Stantec's written authorization. If you are not the
intended recipient, please delete all copies and notify us immediately.
� Please consider the environment before printing this email.
1
Christine Mattson
From: Sherry Charboneau [SCharboneau@ck-law.com]
Sent: Friday, December 02, 2011 1:55 PM
To: Christine Mattson
Subject: RE: Unbilled WIP
Hey Christine:
No unbilled WIP for us.
Happy Friday!
Sherry L. Charboneau
Legal Assistant
CAMPBELL KNUTSON P.A.
1380 Corporate Center Curve•Suite 317• Eagan,MN 55121
S'(651)234-6230•Fax:(651)452-5550
�scharboneauCalck-law.com•www.ck-law.com
From: Christine Mattson jmailto:CMattson@ci.orono.mn.us�
Sent: Friday, December 02, 2011 11:26 AM
To: Sherry Charboneau
Subject: Unbilled WIP
Sherry,
Do you have any unbilled WIP for:
Building permit#2011-01182 3510 Bayside Road Gregg Larsen
Building permit#2011-00974 1978 Shadywood Road Brian Peters
Thank you and have a great weekend!
Christine Mattson
Planning Assistant
City of Orono
2750 Kelly Parkway ' Orono MN ; 55356(physical addressJ
PO Box 66 ; Crystal Bay ?, MN : 55323-0066(mailing addressJ
'�' 952.249.4620 j 6 952.249.4616
� cmattson@ci.orono.mn.us ! ; www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
OUR OFFICE W/LL BE CLOSED: Monday, December 16, 2011 (in observance of ChristmasJ and
Monday,January 2, 2012 (in observance of New YearsJ
1
BUILDING PERMIT ESCROW AGREEMENT
Orono Building Permit#2011-00974 and
Zoning Application 11-3514
�
AGREEMENT made this /✓ day of .�:e 20L, by and between the CITY OF ORONO,
a Minnesota municipal corporation("City") and Brian Peters("Owners").
Recitals
1. A building permit application has been filed for a detached garage located at 1978 Shadywood
Road the("Subject Property"}, legally described as Lots 38 and 39, Shady-Wood, Hennepin County Minnesota.
2. Ovmers request the City to reviewthis application.
3. The City will commence its review of the application and incur costs associated with said review
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
,�qreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to
reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal
consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the
Owners would be responsible for under a building permit application. The escrow will also guarantee
reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in
accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79.
The financial security may also be used by the City to eliminate any hazardous conditions associated with the
work and to repair any damage to public property or infrastructure that is caused by the work (including planning,
engineering, or legal consultant review) associated with building permit #2011-00974 and zoning application
#11�514 if compliance with the approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment
to the Ciry within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to
reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Batance on deposit in the escrow, if any, shall be returned to the
Owners when the review has been completed and written notification is received from the Owners requesting the
funds.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses
incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the
subject property pursuant to Minn. Stat. §§415.01 and 366.012.
CITY: CITY OF ORONO OWNER:
By: e�� �• U-� ��� �
�ts: �;]�i (/!C r-l�—
.i ;.;:.;:.;:.;t::x:�,:;:.:;<:;►....;,:�:::>�>::>::>::»::»><:;<.::;::>::»>�....::..:.�:::.::::::.::.:::..}.�:::.:::::::::.:::::::::.�,}...,.:�..::::::::. .::::..::::::::::::.:::::..:.:.:::::::::::::.:�::::........:::...:..:.....................:.
,q :.j y..j.rt...w..:J.i::(,.,�.:.P .iY.�. .../.�.:::<:>:::>;>:<:::>::::>��.>:y.A. ... .. :::....}�.....Y:...., ...�.y:::<:::>::::::»;�:�': :'<:�:�'�e�::�'��
If1��Ri�1::V+��::�iftil'.�::i::::i::::i::;i'i:i;`:::::::::::::ilA::�!!;;1Y�f,.1P[I;.;lM.:�::}N3x13��i:::::::::::.:::f�k:W,FI��.�:���t!�544�.�iiF......................��............................
..................................�.....................
APPLICATION ESCROW AGREEMENT
Zoning Application# I� - �
AGREEMENT made this_�day of _)i,1�1� , 20 I � , by and between the CITY OF
ORONO, a Minnesota municipal corporation ("City")and�rillVl �� C�l"-S
[a corporation—optionalJ ("Applicant").
Recitals
1. Applicant has filed Zoning Application#�� - �� formally requesting the City to
review plans for Ck
located at i
the"Subject Property")as more ully shown and described on Exhibit"A"attached hereto.
2. Applicant requests the City to review said plans which requires City approval including
3. The City is willing to commence its review of the application and incur costs associated with said
review only if the Applicant establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Applicant shall deposit $ 2�.56� with the City. All accrued interest, if any, shall be paid to
the City to reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, or legal consultant review) or will
incur in meeting with the Applicant, revie ,ing the plans, and preparing agenda packet material for City Council
review of application#�� - �f� Eligible expenses shall be consistent with expenses the
Applicant would be responsible for under a zoning and subdivision application.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Applicant. Applicant shall be responsible for payment to the City within 30 days of the
ApplicanYs receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Applicant does not make
payment to the City within the timeframe outlined in#3 above, the City may draw from the escrow account without
further approval of the Applicant to reimburse the City for eligible expenses the City has incurred. The City shall
notify the Applicant of such draw and the nature of the expense for which the reimbursement is being made. If
the Escrow amount falls below 75% of the original escrow amount the Applicant shall deposit additional sums as
directed by the City, or the City shall discontinue all review.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the
Applicant when the review has been completed.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Applicant, or if the eligible
expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid
balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012.
CITY: CITY OF APPLICA WNE .
r , , „ 7
By: �By: ` �- �-
ItS: , ', " �c ItS: �w�G.c.-
r fj �,
I� ; �
- 10- - '_;�a
;
4
i - __
i �s
�f¢�i' 0�� T"p-�i'1S?
� .C/.�7L1 �C.a.zs�m" i�l, .
, Si''tJ�iG p�t,t ��c=y`�KWd�
� r�
7J��.,`1,�tr
�:i`��P.J.''��. �''���I;�
*�y �G; �S�(Kdij7C,�^
� ;iY,;ar •ILYS C'��M C(t9;
�+�:"i?�.'y .
���3!?l1YYi�t �}�� :+r y
! �i_,7r14 d'::��.�3��;MIC'r?L7 }�
i
; sf►1•-i�.' Ti'rtl.fl(J
; t�
' �arz�ra�s�"t'a�rar�e��-i��;• r��
i� W"i�� � ir.�ar.;�
� taiG �t'id�Vw��+.'ti�
����.��.,.,�: � =.'�'�1�'at:�.
�c. ;
+ `'�.F�r�a`n�f Re�+-"
%evezn��sk �i�r�>:,i r
���a 1 t -�._.� _.,.
. LPj�.�' � _d.:LL�.�..t#f`
F�"^� P1'L7: j�;�-�, ........... __..r
�� �i�t
_ �`�ar, fi :t�:fe�,r,
� � . L�`�t Y.r_ ,
�x0�t. ��1�^�. �}
7'j.3�i+;.
, i'.f �.!�:�'+r��i 1
.It3Y'at1;` 1`�`}n��}'.���e ^`—.._...._. ......
.l?�)
.. •�-�'�"`''�/�<t (jG:�� .�..�.,.a