Loading...
HomeMy WebLinkAboutseptic info CITY OF ORONO �O� Municipal Offices O O Post Office Box 66 Crystal Bay, MN 55323-0066 � � ON—SITE SEWA(;S T.REA'1'l�I�1't' INSPECTION REPORT ti ti ��9k o4�p EsH Owner: �///CA /�/l�l�� Address:��� I�1Pi �ri , Permit �'s: Dates: %��� Contractors: LA i' City ordinance nunber 100 requires that each on-s,ite sewage treatment system in Orono be inspected on a r sis. The on-site sewage treatment system at the above address has been inspected and appears to fall into the cetegory checked below. (7his is ,� an existi� system [ ] new construction) SYSTEM CONFORMITY C1-3): 1 "CODE SYSTEM"-A system which meets all the location, design, and construction standards of the current City Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input without discharging any pollutants into ground or surface waters. 2 "CONfORMING SYSTEM"-A system wh�ch does not meet all the location, design, and construction standards of the current City Codes, but was installed according to the code in effect at the time of installation, and which is opereting satisfactorily by treating and disposing of the entire current sewage input without discharging any pollutants into ground or surface uaters. 3 "NON-C�IFORMING SYSTEM"-A prohibited system; a system located within a designated 100-year floodplain; eny system which may or may not meet all the location, design, and construction standards of the current City Codes and which is tailing for any reason; and any_system with less than 3 feet of unsatureted soil or sand between the distribution device and the limiting so�l characteristics. (The limitin� soil characteristic �] has or [ ] has not been identified at this time. If the limiting soil characterist�c has not been identified, this classification may be subject to revision.) TANK CONDITION (5-10): ySl�rc inspection indicates: �y P�npout not needed at this time. 6 Solids accumulation in tanks indicates they should be punped out this year to help prevent future problems. 7 Solids accumulation in tanks is at a critical level. Tanks should be punped out as soon as possible. 8 System is discharging to the surface. Tanks must be punped out within 48 hours to eliminate surface dischar$e. 9 Inspection risers missing-tanks could not be inspected. lnspection risers (4" dia. pipe) must be installed in each tank at next punpout. If tanks have not been pu�ed out within the last three years, they should be punped out now. 10 Inspection pipe is located directly over tank baffle (does not give accurate measurement of solids eccunulation). lf tanks have not been p��nped out within the last three years, they should be punped out now. DRAINFIELD CONDITION C11-14): Dr field inspection indicates: 1/�j Drainfield is dry, no surfacing evident. '12 Sane evidence of surfacing, not critical yet. 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector immediately. Repeirs must be completed within 90 days. 14 Drainfield extent and condition unknown. LIMITING S1TE fACTORS Csloae.setbecks.etc.): POTENTIAL FOR SYSTEM FAILURE (decends on soils.water table.etc.): COMMENTS: Date of inspection S ic System nspector Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that this report does not guarantee or certify that an existing system will continue to function properlyi but is merely an opim on of the adequacy of the system under current conditions based on the available informet�on. This report must be kept on the premises with the system locetion and pumping records. WHITE COPY/Inspectors Flle YELLOW COPY/Homeowner