HomeMy WebLinkAboutRe: as-built �� DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED ��'�
PERMIT NO. connP�ErE�
ADDRESS �D�O , �D�D� Cl��OT ��U'�4v V1�— C�11'C��
OWNER TELEPHONE NO.
CONTRACTOR
� DESCRIPTION �� �V �� �I v ��
�
� ❑ FOOTiNG ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
� ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
v�, COMMENTS:
�
W
a
� � � U�U ��
0
� i
�
0
�
W �n a
yQ �1L� "'Q�li �o 'j�. �i
F�
Z
W
�
W
�
�
GW ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call forthe next inspection 24 hours in advance. (952) 249-460�
OwnerlContractor on site:
Inspector.
White Copyllnspector's Ffle Canary CopylSite Notice
� �
Christine Mattson
From: Adam Edwards
Sent: Monday, March 27, 2017 1:32 PM
To: Christine Mattson
Cc: Mike Gaffron
Subject: RE: 660, 662 &664 Sandstone Circle As-built Survey
Chris,
The as-built appears to conform to the intent of the approved/revised plans.An inspector should conduct a site visit and
confirm the following:
1.The survey accurately depicts conditions on the ground.
2.The site is stabilized to the point the any remaining erosion control can be removed.
3.The drainage patterns depicted have been established.
Adam
From:Christine Mattson
Sent: Monday, March 27, 2017 10:06 AM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject:660, 662&664 Sandstone Circle As-built Survey
Adam,
We received an as-built survey for 660, 662&664 Sandstone Circle. Please review and provide comments.
Thank you^'
From: Mike Gaffron
Sent:Wednesday,July 29, 2015 5:04 PM
To: 'tomosfar@gmail.com'<tomosfar@�mail.com>; 'tomo@stonebaymn.com'<tomo@stonebavmn.com>; 'Bill Gleason'
<bill�leasonir@�mail.com>
Cc:Christine Mattson<CMattson@ci.orono.mn.us>; Roger Peitso<rpeitso@ci.orono.mn.us>
Subject:660-662-664 Sandstone Circle
Tom—
I've finally been able to work through this permit. See the attached sheets and sketches. There are a few problems
that need to be solved:
1. Survey indicates one continuous driveway serving three units. Approved Development Landscape Plan shows
three individual driveways with green space&trees between driveways. Revise survey to match the approved
plan.
2. Show on the survey the retaining wall between 660 and the future triple to the east of it. If wall is not proposed,
I will want something from HOA saying it's OK not to build it.
3. Identify other proposed retaining walls shown on the Approved Development Landscape Plan to the north and
west of 662 and 664. If these are not needed or not going to be installed, I need some authorization from the
HOA for that revision from the master plan.
1
` 4. Comparing the airphoto to the master plan, it seems like the original developer placed the rear sidewalk system
about 77 feet from the south leg of Sandstone Circle rather than the 86 feet it was shown on the landscape
master plan. This places that existing sidewalk right at the NE corner of the deck on 660. On the survey,show
the existing sidewalk system north of 660-662-664 and define whether you need to relocate parts of it to not
conflict with 660.
Otherwise I don't have any zoning issues with the units themselves. I will hand them off to Roger for building plan
review.
Call or email if you have questions.
Mike
Michael P.Gaffron
Senior Planner
City of Orono
(Street Address)2750 Kelley Parkway
(Mailing Address)P.O.Box 66,Crystal Bay,MN 55323
Phone:(952)249-4622