HomeMy WebLinkAboutMCWD permit MINNEHAHA CREEK WATERSHED DISTRICT
�
QUALITY OF WATER Q U A L I T Y O F L I F E
Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements
and information contained in the permit application, correspondence, plans,
maps, and all other supporting data submitted by the applicant, and made a part
hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant
named below for use and develapment of land in the Minnehaha Creek
Watershed District.
Issued to: Stpnebav Builders. LLC. Permit No: 16-154
Location� 658-654 Sandstone Circle Orono
Purpose: Erosion Control, Sinqfe Family Homes
Date of Issuance: 4/11/2016 Date of Ex iration: 4/11/2017
By Order of the Board of Managers
�
Heidi Quinn
Permitting Technician
This permit is not transferable without District approval, and is valid to the date of
expiration. No activity is authorized beyond the expiration date. If the permittee
requires more time to complete the project, an application far renewal of the
permit must be received by the District at least 30 days before expiration.
The applicant is responsible for compliance with all District Rules and for the
action of their representatives, contractors, and employees.
Conditions: Pro�ect to be completed as described in plans submitted to the
MCWD office on April 5, 2016 according to the provisions of this
permit.
• Properly install and maintain all required erosion control
measures until the disturbed areas are re-stabilized
• Notify MCWD in writing upon completing installation of
perimeter and sedimentation controls
• When the site is re-stabilized and the MCWD staff has
pertormed a final inspection, all silt fences must be removed
(Statement concerning fees for inspections, violations, etc... on following page)
W�collaborate with public and private partners to protert and improve land and water for current and future generations.
15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.org
-
MINNEHAHA CREEK WATERSHED DISTRIC
QUALITY OF WATER QUALITY OF LfFE
Inspection/Analvsis/Monitorins� Fees
A site inspection and monitoring by District staff will be performed where the
activity involves:
• a commercial/industriaUmulti-family residential development
• a single family residential development greater than 5 acres or of any size if
within the Minnehaha Creek subwatershed
• any alteration of a floodplain or wetland
• dredging within the beds, banks or shores of any pratected water or wetland
• a violation �
• any projeet which in the judgment of the District staff should be inspected
due to project location, scope, or construction techniques
In these cases, the applicant shall pay to the District a fee equal to the actual
costs of field inspection of the work, including investigation of the area affected
by the work, analysis of the work, and any subsequent monitoring of the work,
which in the case of a violation shall be at least $35.
Standard Fee Schedule
District professional s#aff $ 65.51*
District intems $ 40.35*
District clerical staff $ 46.69"
Cansulting Senior Engineer $ contracted rate
Consulting Engineer/Technician $contracted rate
District Counsel $ contracted rate
Application fee $ 10.00
Copy costs $� .25 + actual staff time
Color copy costs $ 1.00 + actual staff time
* Hourly
We collaborate with public and private partners to protect and improve land and water for currenr and furure generacions.
15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.org