Loading...
HomeMy WebLinkAbout2016-01386 - ventilation CITY OF ORONO * Z 0 1 6 — fd 1 3 8 6 * , -, 2750 KELLEY PARKWAY DATE ISSUED: 1 U01/2016 ORONO,MN 55356- (952)249-4600 FAX: (952) 249-4616 ADDRESS : 2080 SALEM CT PIN : 27-118-23-31-0016 LEGAL DESC : DICKEY LAKE ADDN : LOT 000 BLOCK 001 PERMIT TYPE : MECHANICAL PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : VENTILATION VALUATION : $ 900.00 NOTE: ALL TESTING REPORTS SHALL BE ON SITE AT FINAL INSPECTION. DUCTWORK FOR BASEMENT,VENT BATH APPLICANT MECHANICAL 50.00 STATE SURCHARGE MECH(VALUATION) 0.45 MATRIX HVAC TOTAL 50.45 14226 NORDEN DR ROGERS,MN 55374 Payment(s) (763)535-6335 CHECK 2937 50.45 Minnesota State License#:mech-MB0036761 OWNER HIRSCHBERG,LAURA&ROBB 2080 SALEM CT LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within l80 days of the date of issuance,or if construction is suspended for a period of I80 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conform ce with the State Building Code.This permit may be revoked at any ti or due cause. �'����� �� // � D/� l�b pplicant Permitee Signature Date Iss d By Si ahue Date � FO CIT USE ONLY • �O A r City of Orono r pl !� �� D� �ji . + <yO P.O.Box 66 Date Received.' Permit# 2750 Kelley Parkway Crystal Bay,MN 55323 Approved By: Amount$:�� Phone(952)249-4600 Fax(952)249�616 y`��, �.`'�� CITY OF ORONO—MECHANICAL PERMIT kESH�� (All Commercial permits must be approved by the Building Official or Inspector and/or Fire Marshall) GENERAL INF�RMATION 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within two working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Desiens—Complete calculations,details and specifications are required for each heating,ventilation,humidification-dehumidification,and air conditioning installation including heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to type,manufacturer and model. Data shall be presented on form provided. 4. When any new construction or remodeling is involved,a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected(rough-in and fmal). Call(952)249-4600. (24-48 hour notice required) 7. House Heating Test Record must be submitted before fmal. T'YPE OF PERMIT Check All That A 1 -[�'�esidential ❑Commercial(Approval Required) [Backflow Device: ❑AVB ❑PVB] ❑ New ❑Additional ��pairs ❑Replace Job Site/Owner Information: Site Address: _r�� �� �G�(.� �,v� Owner: Mailing Address: City: Zip: Home Phone: Alternate Phone: Contractor Information: Contractor: i. C /`1✓�✓� Contact Person: �� Address: ,L��"� �`�n'� �State Bond#: �U v�.3lc 7 City: Zip:���7?Expiration Date: �� Phone: 7G��7" ���"� �?�� Alternate Phone: ❑ Insurance—Current: 1 � 7r, , � . Note: All Geothermal Systems will now require a Site Plan&Review by our Building Official. IS THIS GEOTHERMAL? ❑Yes ❑No HEATING SYSTEMS Quantity: Make: Model: Fuel: Flue Size: Input BTUs: Output BTUs: CFM: COOLING SYSTEMS Quantity: Make: Model: Tons: H.Power FIREPLACES ��y w�U�� �v`��G��� V�'� � � ❑ Gas Factory Fireplace Brand Name: ❑ Wood Buming Fireplace ❑ Wood Stove Model No.: ❑ Wood Stove with Flue/Masonry VENTILATION ❑ /�do. Kitchen Exhaust duct recirculating cfin [✓]' No. / Bath E�aust(must have duct outside) cfin ❑ No. Other Fans: Locations cfin FUEL STORAGE (Must be approved by Fire Marshall if proposing to abandon tank in place.) ❑ Installation ❑ Removal Fuel Oil: gallons ❑ Underground ❑Inside ❑Outside LP Gas: gallons Other: GAS LINE ONLY ❑ Outdoor Grill ❑ Other/List What&Where: 2 � . . — �`�. : �� �::� . , :�.r..��.��. y 1. CONTRACT PRICE *is 1.25%of contract price with a(Minimum Fee of$50.00) ��(� x.0125 $ (contract price) (minimum$50.00) 2. STATESURCHARGE x.0005 $ (contract price) 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ ■ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials, labor,profit, and other fixed costs. It is the amount to be charged to the customer for the work done. If any material,equipment,labor or installations are furnished by the owner, tenant or any other party, the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota,and certifies that all statements de on this application are complete,true and correct. ��. Applicant's Signature: Date: 3