Loading...
HomeMy WebLinkAboutRe: work without permit �-��o CITY OF ORONO � � Street Address: Mailing Address: Telephone(952)249-4600 y�, � 2750 Keliey Parkway P.O. Box bb Fax (952)249-4616 ! F,�' Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us �kESHO� February 24, 2014 SENT VIA CERTIFIED U.S. MAIL NO.: 7007 0220 0000 1989 0344 Jay& Kendall Nygard 1386 Rest Point Road Mound, MN 55364 Re: Work without permit Dear Mr. & Mrs. Nygard, On January 10, 2014 this office notified you that you were in violation of city ordinance by erecting a tower with a wind turbine attached to it on your home. In your letter of February 10, 2014 you stated that you disagree with the city's assessment that a tower was constructed on your property. Orono Municipal Code Section 86-66, the International Residential Code Section R105.1 and the Minnesota State Building Code 1300.0120 (enclosed) require a permit to construct a structure and to erect and install an electrical system. The definition of a structure according to International Residential Code Section R202 is "that which is built or constructed". Therefore the city must require you to submit applications and submittals as required. Please obtain an electrical permit and complete the enclosed permit application along with construction plans before Thursday, March 6, 2014. If applications are not received the city may initiate legal action. After the fact fees may be applied. In addition, on February 10, 2014 you submitted a letter dated December 6, 2010. Attached to the letter was a check and a hand written note that said "Building Dept refiled appeal of decision". The city does not know the intent of these documents but if you want to appeal the city's decision to require a building permit then you will need to file an application with the MN Department of Labor and Industry State Appeals Board. Therefore, your check#8345, dated 02/08/14 is enclosed. If you have any questions feel free to contact me at 952-249-4625. Sincerely, � ���— � Lyle Oman Orono Building Official c U.S. Mail Enclosures: Orono Municipal Code Section 86-66 International Residential Code Section R105.1 Minnesota State Code Section 1300.0120 International Residential Code Section R202, Definitions City of Orono Building Permit Application Check#8345, dated 02/08/14 , „ j . t �. , BUILDINGS AND BUILDING REGULATIONS � 86-66 Sec. 86-39. Application, administration and building official with a duplicate copy to the enforcement. appellant. It ma5� recommend to the council such new leo slation as is consistent with such find- ta) The application, administration, and en- in�s. Votina members of the board may be paid a forcement of the code shall be in accordance with nominal per diem for services rendered in an Minnesota State Buildinb Code. The Code shall amount fixed by the council at the time the board be enforced within the extraterritorial limits per- is established. Administrative costs and the per mitted by Minn. Stat. § 16B.62; subd. 1 when so diem expense of the board shall be paid by the established by this section. appellant unless such payment is waived by law. (b) ThE code enforcement agency of this mu- (Code 1984, § 2.531 nicipality is called the Building and Zoning De- partment. Sec. 86-42. V iolations and penalties. (c) This code shall be enforced by the Minne- Aviolation of the Code is a misdemeanor(Minn. sota Certified Buildin�Official desi�nated b�-this Stat. � 16B.69). Municipality to administer the Code (Minn. Stat. (Ord. No. 24 3rd series, � 4, 3-28-2005) § 16B.65, subd. 1). (Code 1984, § I2.01(2); Ord. No. 134 2nd series, Sec. 86-43. Building code optional chapters. 4-10-1995; Ord. No. 188 2nd series, � l, 6-5-1999; Ord. No. 24 3rd series, § 2, 3-28-20Q5) (a> The Minnesota State Building Code, estab- lished pursuant to Minn.Stat. §� 168.59 to 16B.75 Sec. 86-40. Permits and fees. allows the municipality to adopt by reference and enforce certain optional chapters of the most (a) The issuance of permits and the collection current edition of the �innesota State Buildin� of fees shall be as authorized in Minn. Stat. Code. ,��' 16B.62, suhd. 1. (b) The following optional provisions identified (b) Permit. fees shall be assessed ior work in the most current edition of the State Building governed by this Code in accordance with the fee Code in Minnesota Rules, Chapter 1306, Special schedule adopted by the municipality in Ordi- Fire Protection Systems are hereby adopted and nance No. �2, 3rd series. In addition, a surchar�e incorporated as part of the Buildin; Code for this fee shall be collected on all permits issued for municipality. work governed by this Code in accordance with �1) 1306.0020, Subpart 2. Minn. Stat. § 16B.70. (Code 1984, � 12.01(4); Ord. No. I34 2nd series, (2) 1306.0030, �2. 4-10-1995; 4rd. No. 188 2nd series, § 2. 6-5-�999; (Ord. No. 24 3rd series, § 5. 3-28-2005) Ord. No. 24 3rd series, � 3, 3-28-2005) Sees. 86-44-86-6:i. Reserved. Sec. 86-41. Buihdinb cocie board of appeals. A buildin� code board of'appeals may be estab- DIVISION 2. COI\TSTRUCTION PEPtiMIT lished b�� the council as and when necessar� to hear and make findin�s as to any� issue arisin� Sec. 5�-66. Requirec3. under the siate buildinb code. The number oi member� of' the board shall be the same as re- It i�unla��iul to�an��pnrson to erect,constru�t, auired b��law, or,if there is no such reauirement. enlarge, alter, repair, move. improve. remove, then tne number established by the council. The convert. or demolish an�-buildin� or structure, o� members snall be quaiiiied by experience and any part or portior., including but not Iimited to training to pass upon matters in building con- the general construction, plumbinb, water well, struction. Tne building official shall be an ex on-siie sewage treatment system, wood stoves officio member. The board shall investigate and, and fireplaces, ventilatin;, heating or air condi- after hearing, issue its findings in writing to the tioning systems, or cause such work ta be done, Supp.r;� s CD86:5 „ � i . . § 86-66 ORONO CIfiY CODE without first obtaining a separate building or (3) As-built survey. An as-built survey, pre- general permit for each such building, structure pared by a Minnesota Red stered Land or separate component from the city. Surveyor, shall be submitted to the city (Code 1984, § 12.02) for review and approval upon the comple- tion of all buildings and all additions to Sec. 86-67. Limitations. buildings, unless exempted by the build- ing official. The as-built survey shall cer- The issuance of a permit for any single compo- tify the final topography of the site;verify nent shall not imply authority for construction or drainage patterns; and provide hardcover inclusion of other components. calculations for lots in the Shoreland Over- (Code 1984, � 12.02) lay District. An as-built survey must be approved before the issuance of a certifi- Sec. 86-68. Permit application; information cate of occupancy.In the event that weather required. or other conditions prevent the comple- tion of an as-built survey at the time the (a) The application for a construction permit Certificate of Occupancy is requested, ap- shall include such information as may be required plicant shall provide a sufficient financial by the city, which may vary between types of gua�'antee and establish an escrow agree- constrnction projects. ment to ensure completion of the as-built survey. (b) Surveys required: (Code 1984, § 12.02; Ord. No. 49 3rd series, § l, 9-8-2008) (1) Initial suruey. Any building or general permit application for construction of a new structure or expansion of an existing Sec. 56-69. Contractor Iicensing require- structure shall be accompanied by a cer- ments. tificate of survey prepared by a Minnesota Registered Land Surveyor unless the build- T�e permit for any construction work requiring ing official determines the construction a license under statute or this Code shall be project is exempt from this section. The issued only to the licensee upon proof of holding a certificate of survey shall conform to the current license and bonding and insurance as standards on file in the office of the build- required by statute or this Code. �g o��� (Code I984, � 12.03) (2) Foundation survey. A foundation survey Sec. 86-70. Permit ezpiration. shall be submitted to the citq for review and approval, unless exempted by the (a) Notwithstanding continuing or ongoing work, building official, upon completion of the any building permit issued by the city shall expire foundation work for all buildings and all �d by limitation be null and void and shall additions to buildings.The foundation sur- require issuance of a new permit and pa,yment of vey, prepared by a Minnesota Registered half the original permit fee if a certificate of Land Surveyor,shall certify the lot dimen- occupancy and final completion has not been sions; front, side, rear, lakeshore, and issued within the f'ollowing length of time after wetland setbacks; and foundation eleva- the date of permit issuance, which new permit tion.Afoundation survey must be submit- and fee shall be necessary to reimburse the city ted bef'ore proceeding with framing or for ongoing and more than normal number and further construction.In lieu of a survey a cost of inspection services: letter prepared by a Minnesota Regis- tered Land Surveyor containing the same (1) Single-family residential dwellings,includ- information as a foundation survey may ing new construction,remodeling or addi- be submitted. tions, 24 months. Supp. No. 6 CD86:6 � �� } ADMINlSTRATION S�CTION R1 Q5 4. Steam,hot or chilled water piping within any heatin�or PERMlTS coolin� equipment re�ulated by this code. R1Q�.1 Required.Any owner or authorized a�ent who intends 5. Replacement of any minor part that does not alter to consvuct, enlarge, alter, repair, move, demolish or chanoe approva]of equipment ormake s�ch equipmentunsafe. the occupancy of a buildin; or structure. or to�erect, install, 6 portable evaporative coolers. enlar�e,alter.repair.remove,convert or replace any electrical, Qas,mechanical or plumbinR svstem. the installation of which 7. Self-contained refri�eration systems containing 10 is re�ulated b}�this code,or to cause an}�such work to be done, pounds(4.54 kg)or less of refritrerant or that are actuated shall first make application to the building officia] and obtain by motors of l horsepower(746 W)or less. the required permit. 8. portable-fuel-cel] appliances that are not connected to a R1R�.� V�%ork exempt from permit. Perniits shal] not be fixed pipin� system and are not interconnected to a required for the followinD. Exemption from permit require- power arid. ments of this code shall not be deemed to arant authorization The stopping of leaks in drains,water,soil,waste or vent pipe; for any work to be done in any manner in violation of the provi- Provided,however,that if any concealed trap,drainpipe,water, sions of this code or any other laws or ordinances of this soi1,waste or vent pipe hecomes defective and it becomes nec- jurisdiction. essary to remove and replace the same with new material,such Buildine: work shall be considered as new work and a permit shall be 1. One-story detached accessory structures used as tool and obtained and inspection made as provided in this code. stora�e sheds,playhouses and similar uses,provided the The clearing of stoppa�es or the repainng of lealcs in pipes, floor area does not exceed 120 square feet(11.15 m�). ��ves or fixtures, and the removal and reinstallation of water 2. Fences not over 6 feet(1�?9 mm)high. closets, provided such repairs do not involve or require the 3. Retainin� walls that are not over 4 feet (2219 mm) in replacement or rearrangement of valves,pipes or fixtures. hei�ht measured from the bottom of the footin�to the top R105.?1 Emergency repairs. Where equipment replace- of the wall, unless supporting a surcharge. ments and repairs must be performed in an emergenc}�situa- 4. W ater tanks supported directly uPon grade if the capacity tion, the pernut application shall be submitted within the. does not exceed 5,000�allons(18 927 L)and the ratio of next workina business day to the buildin�official. height to diameter or width does not exceed 2 to 1. �1Q�.�.2 Repairs. Application or notice to the buildin� � �. Side�valks and drivewavs. ofFicial is not required for ordinary repairs to structures, 6. Painting, papering, tiling, carpetinn, cabinets, counter replacement of lamps or the connection of approved porta- tops and similar finish work. ble electncal equipment to approved permanently installed receptacles.Such repairs shall not include the cuetin�away 7. Prefaoncated swimming poois that are less than 24 of anv wa11,partition or portion thereof.the removal or cut- � inches(610 mm) deep. tin�of any structura] beam or load-bearing support, or the � � 8. Swings and other piayground equipment. removal or change of any required means oi e�ress,or rear- 9. Windov�� awninas supported by an exterior wall which rangement of parts of a structure affectina the e�ress do not project more than 54 inches(1372 mml irom the requirements;nor shall ordinary repairs include addition to, exterior wall and do not req,uire additional support. alteration of,replacement or relocation of an��water supply.. sewer, drainage.drain leader,gas,soil,wasce,vent or simF- �iectrica�: lar piping, electric winng or mechanical or otner work Repairs and maintenance: A permit shall not be required for ��ectin�publi�healtn or general safety. minor repair wor�:, inciuding the replacement of lamps or the K105.?� I'ubiic service a°encies. A permit shall not oe connection of approved ponable electrical equipment to required for the installation, alteration or repair of�enera- approved permanentl�� instalied receptacles. tion, transmission, distribution, meterin� or other relaeed � �a�: eyuipment that is untier the ownership and control of nubIic 1. Porcable h�atin�,. cookin�� or clothe,�dryin� applianees. service a��encies by estabIished ri�ht. ?. P.eviacement of� anv minor part that does not al�er Rl(F�.:�fipnii;ation for permit.To obtain�permit.th�apnli- , appraval of eQuipmeni ormake such equipment unsare. can�shall first fil�an appii.;ation therefor in wri[in��on a forn� 3. Portable-tuel-cell appliances that are not connected to a fumisned by tne c'tepar�ment of building safety ior that purpose. fixed pipin� system and are not interconnected to a Such appiication shall: power�rid. L Identify and describe the worlc to be covered by the per- Mechanicat: mit for which appiication is made. 1. Portable heatin�appliances. Z. Describe the land on which the proposed work is to be done b}� le�al description, street address or similar ?. Portable ventilapon appIiances. � desenption that will readilv identify and definitely locate 3. Porrable cooling units. � the proposed buildin�or wor}:. 20d8 1(�6TERNC,Ti.'�NA=R�SlE}cNTI/�!�^.'Ji?=�" ' THE 2007 MINNESOTA STATE BUILDING CODE prevent the installation of any material or to B. To determine the acceptabiiity of a prohibit any design or method of construction performance-based design, the code official not specifically prescribed by the code, may require the owner or agent ta provide, provided that any alternative has been without charge to the jurisdiction, a technical approved. An alternative material, design, or opinion and report. The code official may method of construction shall be approved rec�uire the technical opinion and report to be where the building ofticial finds that the prepared by, and bear the stamp of, a licensed proposed design is satisfactory and compiies design professiona(. with the intent of the code, and that the � material, method, or work offered is, for the C. Performance-based designs shall be purpose intended, at least the equivalent of prepared by, and bear the stamp of, a ficensed that prescribed in the code in quaiity, strength, design professional competent in the area of effectiveness, fire resistance, durability, and work. The design professional shall provide safety. The details of any action granting written confirmation to the code official approval of an alternate shall be recorded and before a certificate of occupancy is issued that entered in the files of the D�partment of the performance-based design has been Building Safety. properly implemented, the operation or use of the builciing is within the limitations of the Subp. 14. Performance-based fire and design, and adequate controls are in place to iife safety design. The code official may maintain comptiance with the conditions of approve performance-based fire and life the design throughout the life of the building. safeiy designs if the code official finds that the proposed design has been conducted by an Subp. 15. Tests. If there is insu�cient approved method. Approved performance- evidence of compliance with the code, or based designs are evidence of compliance evidence that a material or method does not with the intent of the code. Approvals under conform to the reauirements of the code, or in this subpart are subject to the approval of the order to substantiate claims for alternative building code official whenever the design materials or methods, the builciing official involves matters regulated by the building shall have the authority to require tests as code. evidence of compIiance to be made at no expense to the municipality. Test methods A. Design goals, objectives, and shall be as specified in the code or by other performance criteria shall be approved by the recognized test standards. In the absence of code o�cial before submission of a recognized and accepted test methods, the performance-based design report, buildin� official shall approve the testing calcuiations, or analysis results. As a procedures. Tests shall be performed by an minimum, an approved performance-based apnroved agency. Reports of the tests shall be design shall address the foliowing objectives: retained by the building official. (1} tife safety of occupants; 130Q.0120 PERMI'I'S. (2} firefighter safety; Subpart L I�ec�uired. An owner or authorized agent who intends to construct, (3) property protection: eniarge, alter, reoair, move, demolish, or change the occupancy of a building or (4) continuity of operations, and structure, or to erect, install, eniarge, alter, repair, remove, convert, or replace any gas, (5) safeguarding of the environment. mechanical, electrical, plumbing system, or 134 t � THE 2007 MINNESOTA STATE BUILDING CODE other equipment, the installation of which is wall, unless supporting a surcharge or regulated by the code; or cause any such work impounding Class I, II, or III-A liquids; to be done, shall first make appiication to the building official and obtain the required (5) water tanks supported directly permit. upon grade if the capacity does not exceed 5,000 gallons (18,927 L} and the ratio of Subp. 2. Anoual permit. In Iieu of an height to diameter or width does not exceed 2 individual permit for each alteration to an to 1; already approved electrical, gas, mechanical, or plumbing installation, the building official (6) sidewalks and driveways that are may issue an annual permit upon application not part of an accessible route; for the permit to any person, firm, or corporation regularly employing one or more (7) decks and platforms not more�than qualified trade persons in the building, 30 inches (762 mm) above adjacent grade and structure, or on the premises owned or not attached to a structure with frost footings operated by the applicant for the perniit. and which is not pact of an accessible route; Subp. 3. Annual permit records. The (8) painting, papering, tiling, person to whom an annuai permit is issued carpeting, cabinets, countertops, and similaz shall keep a detailed record of alterations finish work; made under the annual permit. The building o�cial shall have access to the records at all (9) temporary motion picture, times or the records shall be filed with the television,and theater stage sets and scenery; building official as designated. (10)prefabricated swimming pools Subp. 4. Work egempt from permit. installed entirely above ground accessory to Exemptions from permit requirements of the dwelling units constructed to the provisions of code do not authorize work to be done in any the International Residential Code or R 3 manner in violation of the code or any other occupancies constructed to the provisions of laws or ordinances of this jurisdiction. the International Building Code, which do not Permits shall nat be required for the exceed both 5,000 gallons in capacity (l 8,925 following: , L)and a 24 inch(610 mm)depth; A. Building: (11) window awnings supported by an exterior wall that do not project more than 54 (1} one-story detached accessory inches (1,372 mm) from the exterior wall and structures, used as tool and storage sheds, do not requ�re additional support, when playhouses, and similar uses, provided the constructed under the International floor area does not exceed 120 square feet Residential Code or Group R 3 and Group U (11.15 mm2); occupancies constructed to the provisions of tl�e International Building Code; (2) fences not over six feet (1,829 mm)high; (12)movable cases, counters, and (3) oil derricks; partitions not over five feet, nine inches (1,753 mm) in height; (4) retaining walls that are not over four feet(1,219 mm} in height measured from the bottom of the footing to the top of the , 135 , , � , . THE 2007 MINNESOTA STATE BUILDING CODE (13) agricultural buildings.as defined (8) porta.ble fuel cel,l appliances that in Minnesota Statutes, section 16B.60, are not connected to a fixed piping system subdivision 5; and and are not interconnected to a power grid. (14) swings and other playground . D. Plumbing: See chapter 4715 for equipment. plumbing work that is exempt from a permit. Unless otherwise exempted, plumbing, electrical, and mechanical permits are E. Electrical: an electrical permit is not required for subitems (1)to(14). required if work is inspected by the State Board of E(ectricity or is exempt from B. Gas: inspection under Minnesota Statutes, section 326.244.. (1) portable heating, cooking, or Obtaining a permit from the Board of clothes drying appliances; Electricity does not exempt the work from other Minnesota Sta.te Building Code (2) replacement of any minor part that requirements relating to electrical equipment, does not alter approval of equipment or make its location,or its performance. the equipment unsafe;and Subp. 5. Emergency repairs. If (3) portable fuel cell appliances that equiprnent replacements and repairs must be aze not connected to a fixed piping system performed in an emergeney situation, the and aze interconnected to a power grid. permit app[ication shall be submitted to the building official within the next working C. Mechanical: business day. (1) portable heating appliances; Subp. 6. Repairs. Application or notice to the building official is not required for (2} portabfe ventilation appliances and ordinary repairs to structures. The repairs equipment; shall not include the cutting away of any wall, partition, or portion of a wall or partition, the (3) portab[e cooling units; removal or cutting of any structural beam or , load bearing support, or the removal or (4) steam, hot, or chilled water piping change of any required means of egress, or within any heating or cooling equipment reanangement of parts of a structure affecting regulated by this code; the egress requirements; nor shall ordinary repairs include addition to, alteration of, • (5) replacement of any part that does replacement, or re(ocation of any standpipe, not alter approval of ec�uipment or make the water supply, sewer, drainage, drain leader, equipment unsafe; gas, soil, waste, vent or similar piping, electric wiring, or mechanical or other work (6) portable evaporative coolers; affecting public health or genera[ safety. (7) self contained reirigeration Subp. ?. Appiicatioa for permit. To systems containing ten pounds (4.5 kg) or less obtain a permit, the applicant shall file an of refrigerant or that are actuated by motors of application in writing on a form furnished by one horsepower(Q.75 kV�or less;and the Department of Building Safety for that purpose. The application shall: 136 � � � DEFINITIONS SLOPE. The fall (pitch) of a line of pipe in reference to a STRiJCTURAL INSULATED PANELS (SIPS). Factory horizonal plane.In draina�e,the slope is expressed as thefall in fabricated panels of solid core insulation with structural skins units vertica]per units horizontal(percent)for a length of pipe. of onented strand board (OSB)or plywood. SMOKE-DEVELOPED RATING.A numerical index indi- STRUCTURE.That which is built or constructed. catinb the relative densiry of smoke produced by burning SDMP. A tank or pit that receives sewage or waste, located assigned to a material tested in accordance with ASTM E 84. below the normal b ade of the gravity system and that must be SOIL STACIi OR PIPE.A pipe that conveys sewage contain- emptied by mechanical means. ing fecal material. SUMP PUMP. A pump installed to empty a sump. These SOLAR HEAT GAIN COEFFICIENT(SHGC).The solar Pumps are used for removing storm water only. The pump is heat gain through a fenestration or glazing assembly relative to selected for the specific head and volume of the load and is usu- the incident solar radiation (Btu/h •ft'-• °F). ally operaCed by level controllers. SUNROOM.A one-story structure attached to a dwelling with � SOLID MASONRI'. Load-bearing or nonload-bearin� con- a glazing area in excess of 40 percent of the gross area of the struction using masonry units where the net cross-sectional structure's exterior walls and roof. area of each unit in any plane parallel to the bearing surface is not less than 75 percent of its�ross cross-sectional area. Solid SUPPLY AIR. Air delivered to a conditioned space throuah masonry units shall conform to ASTM C 55,C 62,C 73.C 145 ducts or plenums from the heat exchanger of a heating,cooling or C 216. or ventilating system. STACK. Any main vertical DWV line,including offsets,that SUPPORTS. Devices for supporting, hanging and securing extends one or more stories as directly as possible to its vent Pipes,fixtures and equipment. terminal. SWEEP. A drainage fittin� designed to provide a chan�e in STACK BOND. The placement of masonry units in a bond direction of a drain pipe of less than the angle specified by the pattern is such that head joints in successive courses are verti- amount necessary to establish the desired slope of the line. cally aligned. For the purpose of this code, requirements for Sweeps provide a longer turning radius than bends and a less stack bond shall apply to all masonry laid in other Chan running turbulent flow pattern(see`Bend"and"Elbow"). bond. TEMPERATURE-AND PRESSURE-RELIEF(T AND P) STACK VENT.The extension of soi]or waste stack above the VALVE. A combination relief valve designed to function as both a temperature-relief and pressure-relief valve. highest horiaonta] drain connected. TEMPERATURE-RELIEF VALVE. A temperature-actu- STACK VENTING.A method of ventinb a fixture or fixtures ated valve designed to discharge automatically at the tempera- throuah the soil or waste stack without individual fixture vents. ture at which it is set. STANDARD TRUSS. Any construction that does not permit THERMAL ISOLATION. Physical and space conditioning the roof/ceilin�insulauon to achieve the required R-value over separation from conditioned space(_sj. The conditioned the exterior walls. space(s) shall be controlled as separate zones for heating and STATIONARY FUEL CELL POWER PLANT.A self-con- cooling or conditioned by separate equipment. tained package or factory-matched packages which constitute THERMAL RESISTANCE,R-VALUE. The inverse of the an automatically-operated assembly of integrated systems for time rate of heat flow through a body from one of its bounding generating useful electrical energy and recoverable thermal surfaces to the other far a unit temperature difference between eneray that is permanently conneeted and fixed in place. the two surfaces,under steady state conditions,per unit area(h• STORM SEWER,DRAIN.A pipe used for conveying rain- ft� °FBtu). water,surface water,subsurface water and similar liquid waste. THERMAL TRANSMITTANCE,D-FACTOR.The coeffi- STORY.That portion of a building included between the upper cient of heat transmission(air to air)through a buildin�enve- surface of a floor and the upper surface of the floar or roof next lope component or assembly,equal to the time rate of heat flow per unit area and unit temperature difference between the warm above. side and cold side air films(Btu/h � ft'- • °F). STORY ABOVE GRADE.Any story having its finished floor TOWNHOUSE.A single-family d�vellin�unit constructed in surface entirely above grade, except that a basement shall be a aroup of three or more attached units in whic6 each unit considered as a story above grade where the finished surface of extends from foundation to roof and with open space on at least the f7oar above the basement is two sides. 1. More than 6 feet(1829 mm)above grade plane. TRAP.A fittina,either separate or built into a fixture,that pro- 2. More than 6 feet(1829 mm) above the finished ground vides a liquid seal to prevent the emission of sewer gases with- level for more than 50 percent of the tota]building per- out materially affectinb the flow of sewage ar waste water imeter. through it. 3. More than 12 feet(3658 mm)above the finished ground TRAP ARM. That portion of a fixture drain between a trap level at any point. weir and the vent fitting. 2006 If�iTEFjNATIONA�RESIDENTIAL CODE� �s � Minnesqta Depa�tment of Labor and Industry Construction Codes and Licensing Division � MINNES07A DEPAR`I"MEN7 OF Plan Review/Inspections L,ABOR & 1NDtJSTRY 443 Lafayette Road North St. Paul, MN 55155-4341 � Phone: (651)284-5068 Fax: (651)284-5749 Application to the www.dli.mn.gov State Appeals Board PRINT IN INK or TYPE your responses. MUNICIPALITY BUILDING OFFICIAL PHONE E-MAIL ADDRESS MAILING ADDRESS CITY STATE ZIP CODE PROJECT BEING APPEALED Project is Has the permit been issued? ❑ One&two family building ❑ Other building type ❑ Yes❑ No APPLICANT REQUESTING APPEAL PHONE E-MAIL ADDRESS ❑ Owner ❑ Contractor ❑ Designer ❑ Attorney ❑ Other MAILING ADDRESS CITY STATE ZIP CODE CODE,YEAR AND SECTION BEING APPEALED SUBJECT BASIS: (check which of the following apply) ❑ The true intent of this code or the rules have been incorrectly interpreted; ❑ The provisions of this code do not fully apply; ❑ An equally good or better form of construction is being proposed CERTIFICATIONS Our municipality does not have an appeals board and,therefore, requests that the State Appeals Board hear this appeal.A copv of our final determination on the matter is attached. SIGNATURE BUILDING OFFICIAL CERTIFICATION NO. DATE I hereby certify that the above information is true and correct. SIGNATURE APPLICANT LICENSE#(if applicable) DATE This material can be made available in different forms, such as large print, Braille or on a tape. To request, call 1-800-342-5354 (DIAL-DLI)Voice or TDD(651)297-4198. BCS 11 (2/07) , � y � � ' e ; � ; ; � . � : �.. v . ; � � . : � �. � � c w ; . �- - �- . . � � �� � � � � � �~ � ap � � � �, � � � � . � � . � � <:�. � a �� � � ,:`� �--, � � , �� t . � . ; . � . . . . . ,:.. � � , C � ;, r ��, ; � D . , �� i 1 . � C � �� � � ■ ` � . I �.' �� � .. � — —..: �' ? ; �: � � ;�� . �° .� r s :� � "� � �� � �:� �� v� ,��, � 1 � � � . � s �,� � �� �� �� �� � �_ ; . , �� . � � � . , i . . � � . � . � , . . , �°�o BUILDING P� RMIT y���kf o��G� APPLICATION SH FOR NEW STRUCTURES OR ADDITIONS CITY OF ORONO 2750 Kelley Parkway PO Box 66 Crystal Bay, MN 55323-0066 952-249-4600 BUILDING DEPARTMENT / LYLE OMAN, Building Official INSPECTIONS: OFFICE HOURS: CALL 952-249-4600 MONDAY-FRIDAY GIVE 24-d8 HOUR NOTICE 8:00 AM -4:30 PM TABLE OF CONTENTS BuildingPermit Application Flow Chart........................................................................................................................................2 Building Permit Application Submission Requirements................................................................................................................3 ProposedBuilding Plans.........................................................................................................................................................3 FloorPlans..........................................................................................................................................................................3 ExteriorElevations..............................................................................................................................................................3 Detailsand Sections...........................................................................................................................................................3 Minnesota State Energy Code Calculations and Mechanical Code Requirements.................................................................3 Survey.....................................................................................................................................................................................3 Stormwater Pollution Prevention Plan(SWPPP).....................................................................................................................3 PlanReview Fee.....................................................................................................................................................................4 Hardcover Information and Hardcover Calculation Worksheet................................................................................................4 SepticSystems........................................................................................................................................................................4 AccessPermit.........................................................................................................................................................................4 Wetland Delineation,Wetland Buffer Evaluation and Buffer Improvement Plan......................................................................4 Minnehaha Creek Watershed District Permits.........................................................................................................................5 CostsOther Than Building Permit Fees..................................................................................................................................5 Permit Application; Information Required................................................................................................................................5 SurveyRequirements...................................................................................................................................................................6 HardcoverInformation..................................................................................................................................................................7 Stormwater Quality Overlay District Tiers Map......................................................................................................................11 Hardcover Calculation Worksheets-EXAMPLES.................................................................................................................12 HardcoverCalculation Worksheets.......................................................................................................................................14 Constructionnear a Wetland......................................................................................................................................................16 Steps for Applying for a Land Use Application or Permit on a Property with a Wetland or Near a Wetland...............................17 Requestfor Wetland Buffer Evaluation......................................................................................................................................18 Minnesota State Energy Code Calculations and Mechanical Code Requirement Form.............................................................19 DataPrivacy Advisory Form.......................................................................................................................................................20 Rightsof Subjects of Data.....................................................................................................................................................21 BuildingPermit Application........................................................................................................................................................22 PLEASE REVIEW THE APPLICATION CAREFULLY! To avoid processing delays and/or additional costs, please fill out the information completelv and submit all of the required information. Padcet Last Updated: 04/19/2013 . . � � ' . Page 1 of 23 BUILDING PERMIT APPLICATION FLOW CHART Occasionally, following the meeting with staff the proposal will be revised to Project Idea meet Code and submitted for building permit. O O Meetin g s are most effectivewh en conduded with th e h omeowner and the homeowner's contractors and sometimesthe City's Engineer.Th is is to aid in p rep aring a co mplete ap pli cation,i nform th e homeowner(an d contraciors)of th e O p ro cess an d req u r�ements of th e City Co de,bui Idi ng code,bi II ing an d identify Meetlll with poliaesorregulationsthatcreateopportunitiesorproblemsfortheproposal. Ifthe g h o meowner's p roposal d oes n ot meet th e City Code,rather th an s uggesting a Building or varianceapplication,staffwillencouragetheapplicanttorevisetheirproposalto Planning Staff conformtoCityCode. Ifthisisnotpossiblethevarianceprocessisdiscussed(see Varian ce Pro cedure Flow Chart fo r mo re i nfortnation.) Th e ap p I ication is taken i n at th e fro nt co i.nter,an d g iven a permit appl icati on n umber.Th e h omeowner an d/or ap pl icant are req uired to s ubmit an escxow Application checkandsignedescrowagreement,ifapplicable. Theapplicationisthen S U b m Itted p ro cessed to d etermi ne if it i s co m plete an d d istributed to ap propriate P8Z staffforzoning review priorto proceedingto the Building Official forbuilding co d e review.If n ecess ary,th e ap pli cation&p I an d etail s are sen Ugiven to th e '••.���� City Atto rn ey&C ity En g i neerfo r thei r co mments. Often ti mes a s ite i n spedion conducted by Staff&City Engineeris necessary. �'••. .��� ..� �.........................................................................� ; In the case ofan incompleteapplication(i.e.missing ; information)theapplicantisnotifredandCityreviewofthe ; project is on hold untilthe information issubmitted. Detall2d Staff ReView: PLEASENOTE tndividualdepartmentalstaffreview 1. Septic review (if necessary); ofthebuildingpermitapplicationmaterialsisa 2. En ineer review if necessa sequential prooess. However,in orderto maximize 9 (� rY)� efficiencysomeofthereviewtimesoveriap. 3. Zoning review; 4. Building Code review. ..................................................................�. : The staff review prooess will reveal any defipencies in ; E theapplication. PLEASENOTE: Applicationsfound ; ' ����'•• : to be incomplete,contain inoorrectinformation,need ��'� e revisions,requiremoreinfortnationwilltakemoretime e : tocompletethereviewprocess. : Issuance of Building Permit �.................................................................� Survey Requirements: - Foundation -As-Built - Refund of Escrow Packet Last Updated: 04/19/2013 Page 2 of 23 • ' + � , ' . BUILDING PERMIT APPLICATION SUBMISSION REQUIREMENTS(continued) BUILDING PERMIT APPLICATION SUBMISSION REQUIREMENTS A. PROPOSED BUILDING PLANS Two (2) copies of building plans, drawn to scale and one reduced copy (8 '/Z" x 11" or 11" x 17") containing the specifications listed below. One set will remain on file with the City and one set will be returned to the applicant to be kept on-site during construction. Floor Plans Each floor or level including basement or foundation, decks, porches, garage or carport require a floor plan. Include: • size, spacing and direction of floor, ceiling framing members, girders, beams, columns and piers • location and size of all windows and doo�s including manufacturers identification and documentation of window and door infiltration test data • location and size of all permanent installed cabinets, plumbing fixtures, heating, ventilation and air conditioning equipment Exterior Elevations Show exterior elevations on all sides of building, including windows, doors, finished grades, exterior flnish, depth of footings, foundation walls, piers, finished floor elevations and type of materials. Details and Sections A minimum of one section detail through the exterior wall for each type of construction proposed, showing materials and dimensions of each member from footing to the highest point of the roof. If a half-story is proposed, additional cross-section drawings are required for evaluation. See Building Height handout for more information. Details including: • .Calculations and stress diagrams, together with manufacturer's specifications are required for all trusses. • Fireplaces, if proposed, must be detailed in the plan and include a cross section. • Details and calculations are required for each critical construction detail including beams, overhanging or cantilevered joists, stairways, balconies, or other unique structural features. • Provide window or door schedules, shop drawings of sky-lights and manufactured stairways. • Minnesota State Energy Code Compliance Forms B. MINNESOTA STATE ENERGY CODE CALCULATIONS AND MECHANICAL CODE REQUIREMENTS Complete Energy Calculation Form (page 19) and submit with application. Additional forms can be found at http://www.dli.mn.Qov/CCLD/PDF/sbc 1322 cert.pdf. Residential or Commercial compliance programs can be found at the Department of Energy's web site at www.enerpvcodes.aov. C. SURVEY See page 6 for survey requirements. D. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) For additional information on the City's Stormwater Pollution Prevention Plan (SWPPP) requirements refer to Chapter 79 of the City's Municipal Code. The City's website (www.ci.orono.mn.us) has a link to the on-line municipal code (www.municode.com). Padcet Last Updated: 04/19/2013 Page 3 of 23 � � , � . BUILDING PERMIT APPLICATION SUBMISSION REQUIREMENTS (continued) � E. PLAN REVIEW FEE An estimated plan review fee is due at the time of application. This non-refundable fee will be credited toward the building permit fees. This fee is based on the estimated job cost. The 2013 Building Permit Fees can be found on the City's website (www.ci.orono.mn.us) or call 952-249-4600 and request an estimate of the plan review fees. F. HARDCOVER INFORMATION AND HARDCOVER CALCULATION WORKSHEET Hardcover calculations are required for properties identified as Tier 1 through Tier 5 on the Stormwater Quality Overlay District map or within 1,000 feet of a lake or 300 feet of a creek. See Hardcover Information starting on page 7. G. SEPTIC SYSTEMS- Septic system site evaluation report for proposed new residences within unsewered, rural areas is required. New On�ite Installation or Addition Required • For all new construction outside districts served by municipal sewer. • Any time the existing system is classified non-conforming or when the addition of bedrooms, installation of inechanical or plumbing equipment, or other factors are likely to affect the system. Procedure for On�ite Installation or Repair • A State Licensed Designer must perform soil testing and the system design. • Submit design to City for approval. • Distribute report to contractors for bidding. • A list of State licensed contractors can be found at www.pca.state.mn.us and selecting -�Water-�Water Types and Programs-►Wastewater-� Minnesota SubsurFace Sewage Treatment Systems (SSTS)or at http�//www pca state.mn.us/index.php/wateNwater-tvpes-and-programs/wastewateNsubsurface-sewaQe- treatment-svstem-ssts/minnesotas-subsurface-sewaae-treatment-svstems-proaram-ssts.html • Contractor obtains permit before work begins General Information When planning new home construction or additions to an existing home, both primary and future drainfield sites must be preserved for the long term use of the property. All setbacks and property lines must be verified prior to the issuance of a septic system permit. Once drainfield sites have been verified, snow fencing must be placed, surrounding the sites, to prevent them from damage. Vehicular traffic, such as cars, trucks, earth moving equipment, etc. could compact drainfield sites, rendering them unusable, prohibiting the timely completion of the project and/or limit the long term use of the property. Snow fencing must be in place prior to the issuance of a building permit. H. ACCESS PERMIT All applications for structures which require a new driveway access or involve a change in use of an existing access to a County highway, must be accompanied by an access permit issued by the Hennepin County Highway Department. I. WETLAND DELINEATION,WETLAND BUFFER EVALUATION AND BUFFER IMPROVEMENT PLAN A Minnehaha Creek Watershed District(MCWD) approved wetland delineation is required to be submitted if there is a wetland on the property. The approved wetland delineation must be shown on the survey along with the appropriate buffer width and 20' setback from the buffer. Please refer to the City's official Wetland Overlay District map for buffer width requirements. Packet Last Updated: 04/19/2013 Page 4 of 23 BUILDING PERMIT APPLICATION SUBMISSION REQUIREMENTS(continued) J. MINNEHAHA CREEK WATERSHED DISTRICT PERMITS You are required to contact the Minnehaha Creek Watershed District (MCWD) regarding your proposed project to determine if your project triggers any of the MCWD permitting requirements. The City of Orono will not issue a building permit without a copy of the permit from the MCWD or written documentation stating the proposed project does not trigger any MCWD permitting requirements. K. COSTS OTHER THAN BUILDING PERMIT FEES 1. Orono Code provides that directly assignable consultants' costs for review of building permit applications must be paid by the applicant or property owner: a. City Engineer's costs in excess of$500 b. City Attorney's costs for review of legal questions and documents c. Other unusual charges for outside consulting services of appraisers, other engineers and unusual technical reports after notification to the applicant and property owner that such services are necessary for review of the application. In making an application, the applicant and/or property owner agrees to pay these costs as they occur. Failure to make payment may results in the withholding of the permit inspections or certificate of occupancy and certification to the property taxes of the unpaid balance. 2. An escrow of$2,500 is required. Escrows are required for: a. New Home Construction b. Additions c. New Buildings(Garages, Accessory Structures) d. Grading Projects 3. An escrow for wetland buffer improvements may be required. The amount will be determined by the scope of the project. 4. Once a building application is received, the appropriate escrow agreement will be prepared by staff and sent to the property owner for their signature(s). K. PERMIT APPLICATION; INFORMATION REQUIRED 1. The application for a construction permit shall include such information as may be required by the city, which may vary between types of construction projects. 2. Surveys required: a. Initial survey. The certificate of survey shall conform to the standards on file in the office of the building official. b. Foundation survey. The foundation survey will certify lot dimensions; front, side, rear, lakeshore, and wetland setbacks; and foundation elevation. A foundation survey must be submitted before proceeding with framing or further construction. In lieu of a survey a letter prepared by a Minnesota Registered Land Surveyor containing the same information as a foundation survey may be submitted. c. As-built survey. The as-built survey shall certify the final topography of the site; verify drainage pattems; and provide hardcover calculations for lots in the Shoreland Overlay District. An as-built survey must be approved before the issuance of a certificate of occupancy. In the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 financial guarantee and establish an escrow agreement to ensure completion of the as-built survey and all site improvements. Packet Last Updated: 04l19/2013 Page 5 of 23 � , ' � , �No City of Orono Survey Requirements y� �,.'� Planning&Zoning Department 952-249-4620 �qkES}�0�� www.ci.orono.mn.us The following is required for land use or permit applications: three(3)original, scaled copies of a certificate of survey, meeting all of the following requirements and a digital copy(or one (1) 8'/"x 11"or 11"x 17")for reproduction. 1. All surveys shall be certified by a Minnesota Registered Land Surveyor. Civil engineers may certify topographic surveys. 2. Permanent iron monuments must be in place at each property comer. 3. Provide a written legal description including all existing easements. 4. Primary and alternate drainfield area corners shall be staked and shown per septic design and tank location shown. 5. Indicate all proposed buildings with dimensions for �ach building. Reference dimensions are measured perpendicular from the front, side and rear lot lines to the nearest point of each building. 6. Indicate the location of all existing and proposed decks, porches, driveways, curb cuts and other accessory structures. 7. Indicate the total lot area in square feet. 8. Indicate elevations to sea level datum of the top of curb, or if no curb,the edge of the pavement of the street at . points where the side lot lines of the property intersect said street. 9. Indicate proposed elevations to sea level datum of the top of foundation, garage floor, the first floor and lowest floor at all structure corners. Indicate top and bottom elevations for all walls. 10. Indicate location and elevation of any structures on adjacent properties within 50' of lot lines. For lakeshore lots,the principal structure on each adjacent lakeshore lot must be shown. 11. Indicate all drainageways, sewer and water mains and services, storm sewers and wetlands within the property and within 50' of the property. 12. Proposed grading plans should be indicated with directional arrows of proposed surface drainage (1' contours on lakeshore properties, 2' on all others). The source for all topography must be indicated on the survey. Provide additional contour intervals as needed in flat areas to show drainage patterns. 13. Existing topographic contours must extend 50' outside of lot lines on all lots. 14. Identify top of bluff and all steep slopes over 12%. 15. Indicate all trees over 6"diameter within proposed disturbance area(s)and within 75' of the OHWL. 16. Reference the Stormwater Quality Overlay District Map and indicate the appropriate Stormwater Quality Overlay District Tier for the subject property; hardcover calculations required. 17. Indicate wetland boundaries as well as required buffer and buffer setback lines. See: Wetlands & Drainage Districts map. 18. For property adjacent to lakes, ponds, streams or wetlands, indicate the established high water elevation as referenced on the following Ordinary High Water Level (OHWL)chart: Natural Environment(NE) Lakes OHWL Lake Classen 974.5' Dickey Lake 985.5' French Lake North Basin 930.5' Sewage Lagoon 934.3' South Basin 930.0' Lydiard Lake 970.9' Recreational Development(RD)Lakes Long Lake 944.3' Mooney Lake 988.0' Tanager Lake 929.4' Hadley Lake(Plymouth) 961.4' General Development(GD)Lakes Forest Lake 929.4' Lake Minnetonka 929.4 Tributary Streams Painters Creek Stubbs Bay Creek Measure Long Lake Creek at top Wolsfeld Creek of bank Dickey Lake Creek Packet Last Updated: 04/19/2013 Page 6 of 23 . , � � �o�o Hardcover Information www.ci.orono.mn.us y ` Planning & Zoning Department 952-249-4620 �' G t�k6SH��� The hardcover allowance for an individual property is identified on Orono's Stormwater Quality Overlay (SQO) District map on page 5. Each property within the SQO District has been assigned to one of five `Tiers' within which a defined percentage of the entire property is allowed to be hardcovered. The percentage of hardcover allowed within each Tier is shown in the following table: Assigned Tier Allowed Hardcover Percentage Tier 1 25%of gross lot area Tier 2 30%of gross lot area Tier 3 35% of gross lot area Tier 4 (properties zoned RPUD) 50%of gross lot area Tier 5 (properties zoned Industrial) 85%of gross lot area HARDCOVER IS DEFINED AS FOLLOWS: Hardcover means a hard surface that prevents or retards entry of water into the soil and causes water to run off the surface in greater quantities and at an increased rate of flow than prior to development. Hardcover shall include but not be limited to the following: all building footprints, driveways, sidewalks, stepping stones, retaining walls, patios, courts (sport, tennis, etc), decks, pools, areas used for the extended outdoor storage of vehicles or equipment, and all other similar features or surtaces as determined by the City Engineer or City Planner. HARDCOVER INCLUDES: • Roofs • Swimming Pools • Sidewalks, steps, and patios • Porous or pervious pavement • Decks, including decks on play • Tennis or Sport Courts equipment(even if there are gaps • Building Footprints between the boards) . Any other vehicle, material, • Driveways, regardless of surface equipment, or structure that material prevents absorption of rainfall and is • Tops of retaining walls, including maintained in the same location boulder walls, and isolated boulders long enough that no vegetation grows under it. SURVEYS AND HARDCOVER CALCULATIONS When a permit is requested for expansion or construction of a structure or hardcover an updated survey and hardcover calculation worksheet will be required to demonstrate compliance with hardcover regulations. VARIANCES Variances to hardcover standards may be subject to mitigation measures deemed appropriate by the City Council to offset the impacts generated by the proposed additional hardcover. Packet Last Updated: 04/19/2013 This is an information packet. Every effort has been made to insure the accuracy of the information contained herein;however,if any infom►ation is not consistent with provisions of the City Code,the Code provisions will prevail. � Page 7 of 23 HARDCOVER COMPLIANCE Iliegal hardcover may be required to be removed before a building permit is issued. Illegal hardcover is ' hardcover in excess of that allowed by a hardcover variance or hardcover in excess of that allowed by the Code that was added to the property after 1975 or 1992. OTHER DEFINITIONS Buildinq Foofprint means the outline of the total area covered by a building's perimeter at the ground level (to the block/foundation). (1) Carports, covered porches and other similar building features which have no exterior walls shall be included as pa�t of a building footprint by drawing a straight line between the outer edges of all support structures(and the main building if applicable). (2) The outer edge of building protrusions, bay windows or other similar features that extend outward from a building and are less than four feet from the ground shafl be considered as part of the building footprint. Permeable Lininp (landscapina fabric) means a porous material used for weed prevention that allows storm water to permeate into the ground. Pervious Paver means concrete, asphalt or similar blocks with holes of some kind that allow water to go through the surtace into a specialized aggregate base--consistent of an open-graded aggregate—and into the soils below. Pervious Surface means naturally occurring groundcover or a variety of types of pavement, pavers and other devices that pravide stormwater infiltration while serving as a structural surface. ASSUMED(INCLUDED�HARDCOVER(CITY CODE SECTION 78-1683) The following items must be included in hardcover calculations regardless of whether or not they are proposed to be constructed at the time of a building permit application: (1) Proof of a two car garage(detached or attached). (2) A driveway for all garages, a minimum of 12 feet in width subject to the driveway standards listed below. (3) Minimum dimensions for driveways (see Minimum Driveway Standards illustration herein) (4) 24 inch wide sidewalk connecting the front door to the driveway (5) The minimum stairway/landing at all exterior doors as required by the building code (6) Existing hardcover which encroaches(legally or illegally)onto an adjacent parcel or parcels. a. In such cases of encroachment, the square footage of all encroaching hardcover shall be added to the overall hardcover on the subject lot; b. No credit shall be given towards the overall lot size of the subject lot. STANDARD HARDCOVER EXCLUSIONS(CITY CODE SECTION 78-1684) Landscaping with permeable lining shall not be considered hardcover. Additionally, the following hardcover items shall be excluded from hardcover calculations: (1) Roads, trails, sidewalks, utilities and other hardcover encroachments intended for the public's benefit; (2) Hardcover encroachments created by improvements on adjacent property not owned by the subject landowner; a. In such cases of encroachment, the square footage of all encroaching hardcover shall not be added to the overall hardcover counting against the subject lot; b. The land area upon which the encroachment rests shall count towards the overall lot area for the subject lot. (3) Retaining walls; (4) Handicapped ramps with a pervious surtace below; and (5) The first 100 square feet of pervious paver patios/walkways or the first 100 square feet of deck with a minimum '/.inch spacing between boards and a pervious surtace below the decking. Packet Last Updated: 04/19/2013 This is an information packet. Every effort has been made to insure the accuracy of the information contained herein;however,if any information is not consistent with provisions of the City Code,the Code provisions will prevail. Page 8 of 23 HARDCOVER RESTRICTED WITHIN 75 FEET OF LAKESHORE Within 75 feet of the Ordinary High Water Level (OHWL) of any lake or tributary, and within any bluff or shore impact zone, no hardcover shall be placed, located or constructed, except for driveways, stairways, lifts, landings and lockboxes as regulated by the Shoreland Overlay District. DRIVEWAY STANDARDS All driveways shall comply with the following minimum dimensional standards: Driveways serving end loading garages shall maintain a width equivalent to the width of all overhead doors extending 15 feet out from the garage doors. (1) Driveways serving side loading garages shall provide a minimum turn around or back up depth of 20 feet, as measured from the garage door(s). (2) Minimum driveway taper ratio shall be 2:1. (3) Driveways shall be at least eight feet in width at the street or private road. �� e' "~ (4) A turnaround shall be 8ackupApron � (If Required) provided for a driveway with s��a�Mlnimum direct access to an arterial or collector roadway, or for �� a side load garage as � determined necessary by �� � the city planner. The �e�-O� � � minimum dimensions of the •�3 turnaround shall be eight � „�,r,�,Za�M,�. feet in width by 12 feet in depth. E"°'.°�a 4,� (5) "Wheel strip" driveways are M���mum yy�dth of c"""> allowed, but the entire width ��9e� of the driveway (from �� � outside to outside of the �� �. strips) will be considered � -- ----------------- � " hardcover. Minimum Taper E DNv°way Wldth See Minimum Driveway Standards' z:� �z drawing on the right. � czo'Maxlmum) o�ay wam - 1 m 8'Mfnimum 5'Rad. 5'Rad. (20'Maximum)—r.—^ ������'�-W� i i i i Minimum Driveway Standards Packet Last Updated: 04/19%2013 This is an information packet. Every efl`ort has been made to insure the accuracy of the information contained herein;however,if any information is not consistent with provisions of the City Code,the Code provisions will pievail. Page 9 of 23 SHARED DRIVEWAYS Where one or more properties (referred to as secondary property) gain its driveway access from an adjacent property(a primary property) by virtue of a driveway easement, the following shall apply: (1) The portion of the shared driveway on the primary property that serves both primary and secondary property shall be considered hardcover for the primary property. (2) That portion of the driveway on the primary property that serves only secondary property shall not be considered hardcover for either primary or secondary property. See"Driveway Easements" drawing below. r—————————————————T—————————————————1 IP�rr-sr�rra I 1ct'1TC��rC'aTt, I ir 9 i � � i �Y House � I � Haise � I i� nn„n,r,� i �.r...R�� y i i'L/1�.1�u.c�� �fd J E � I � Ca8 f 8 9 E �a.�a.a.�a�.i�a.� i ( If.! LL[.L/1� � I d \1?].l].1 �I � I I I I I I I I I I I I I I I i Primary Secondary i i Property i Property i i i i i i i i i i L————————————— —— �—————————————————J r------------------r------------------1 �/7 T T''7 T�l T/'� !1'T!'\�r P'l T l, i r, � i � J i �Y House � � � House � I I� .pYT/T1Tf/f/fT � TT�RRR!!� � I I'�J1 L 1 L L/1 L/1� � I � Y.��YL�1 L�iJ I Y � � ��. .e I d. .v� ,y I � Primary � Secondary � i Property i Property i i i i i i i i i � � i i i i i i � � � i i i �-'-----------------�-------------------� Excludable area-n�covered fn area nor hardcover of prfmary bk Also not added to the hardcover cakuk�+tions fa the secandary ProPe�Y• Driveway Easements FOR MORE INFORMATION Contact the Ptanning and Zoning Department at 952-249-4620 or planninpCcD_ci.orono.mn.us. Reference: City Code Sections 78-1670 thru 78-7801 -Adopted September 24, 2012 Packet Last Updated: 04/19/2013 Thrs is an information packet Every effort has been made to insure the accurecy of the info�nation contained hemin;however,if any information is not consistent with provisions of the Ci(y Code,the Code provisions will prevail. Page 10 of 23 �- - � • � irn�u�aei�� �'�����:!�I:►1�'� ���`�—:1 �� � -�_ �, _ �iii�i - �t�ii.a-'::� �::f:J��►.y�-�, = �m,._ �f ���: M■��/i ��' '1� �� ' ��:af�ti���' 1�; � �. I��■��� �o� f l 1 I r��_� , ��.,l�.��_., .r ...�. ,; ���'. l��.�I�Ill�i� / � �� : �� ■'�:ti 11111�� ,-, `, _ I, �'►7�Jt���►.� � �, ,,,�. � ��� ���� � !t� � ■ � .. ',uri� �■ . / � '�.: ,;� �� } �� •����,rt1�`�I, .�.= , , ,_ � ��,y: 1 � �-.��i� ■ � , . �►. � � ��.��� ��,�?� ���� �^�li �'',.'��,�C/�i�i'!l�r�a y � ;;r • �' ■�ai1j`��4r�!�U �- ' ,., �. �. .. �rlll�iir.:�irl�_.�tl�+�� 'I� " r� �, ir';:^�,-.�+-' ti ■. �. ,,�� _ .■� u�-.� ,� I.. .11�1►' 111C� ' �I�;'� nr� '� �a ra ���'t � :' ii��,� ��:�ni�1� - _�����ra71�: ■: �_�r� \, ���L":��■ � *�': ■�...� . i ; . /����,�.i1! ���� � `.� .�a�;,^ � � � � � �,_� ►as!.�=1 / ' .� - `�= �_ , . ����`■1�� ' tin ` � .:_ 1 r, . � ., �,1 .�.v=-- '-=, I•.� � .`; i�� .�� t, �_ ��� ;,1�1 ';'�", �.�',;_''; ; Ei; ��'' � i ■ . ;� �- — r �� � � i `yl •_ I'�',���,,, l � ( A1 � e`. iw r.� ��� 1 r''�;� '�� ,,��f,���;� �.,+= ��� ������ r ,_� `n•�i��:11.�^�y�/ � ;� ;�iii� \�•,�� L ,���� '1� M%, .�' ,� �.►., �II'� ' II� �� ,I � ,�'r:. / � �',- `,f� ` / ��i��� ;�� r � I 71� .��'� il► �:►`+ � �.��....�1 '� �}.w �'�I 5„�►�. �. ■11�=: � - _ ,': ,:�, , ---" . �i..�;..� � �� � � � :u � " � • - - ..: :. �- i ..- . �0�� City of Orono Hardcover Calculation Worksheet y ,� Property Address 123 J�rhpl2 JfYP�-f- � �� . ��xESHO�� Prepared by ..�JI�IWeyoY Date T�o � Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Step 1: EXISTING HARDCOVER In the following table identify all items of existing hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet Exam le Gara e 24'x 30' 20 S.F. A �-�'q452 30� X FiO� I,$D� S.F. B " 20� X 2�f-� �f-$D S.F. � De�{-ached r� 16' x 22' 35z s.F. � De.ck 2� X 16� Iq2 S.F. E Dec� sf-GM's 2� x '-F� `�-8 S.F. F Fi-a�tl- s�t�e � 6� X 8� '+8 S.F. � Goncre�-e sidew� 3� x 32' �Yo S.F. H Dnvewa A ort 28� x 20� 560 S.F. � A7VeWa M1�-� x ro0� 8`�-0 S.F. � "rran r Q�i- o f n � bor s drivewa 3� x IZ' + 2 �8 s.F. K C,a1cre-Fe G�►' corlcM-+o►1er ad �-� x 4-� 16 S.F. � Garcleen shed q� x 2� 10$ S.F. . M �I-�rwQ -b IQke �F� x 7d 280 S.F. N Loc�box b I�e `F� x 5� 20 S.F. � Re+qnel wal wi+�hin 75 o f Iq�e f x �I-8' 4-8 s.F. P R2i-A�'�in wAI ►�wrl-hi'l 75 o f Iqke ( x 60' 60 s.F. (� S.F. R s.F. S S.F. T S.F. U S.F. (1) Total Existing Hardcover y-,qfdo S.F. Excludable Hardcover: � �Ys+ ioo s.f. � rv�a�s du� ioo s.F. J Ti-ian r a►�i- o f ne bor s drivewa 3' x 2' } 2 I8 s.F. P Re+Anin wall ►Lt�► 75� o f I��e r x r o' roo s.F. S.F. S.F. (2) Total Excludable Hardcover I73 S.F. (3) Net Existing Hardcover [Subtract line(2)from line(1)] '-I-,788 S.F. (4) Total Lot Area (100' x 240') Z�f-,D00 S.F. Existing Hardcover Percentage [(3)= (4)] �c�j o�o (Proposed Hardcover next page) Packet Last Updated: 04/19/2013 , � � , Page 12 of 23 Step 2: PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessa to accuratel de ict ro osed hardcover status of the ro ert . Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet <:Y'^ `"";,2'"�" ..�...,�`"S� '.1�" � y�"'Ks "°M '��� M1�'►i ':�, b�,.!.z � F�m ..ec �,:,y.,„�... . ....._- , : ::-:. , , . «; � �4.�m l�J� A _ +I"o�t52 � 30� x 60� � ��,800 S.F. B " 20� x Z'-F� '-I-80 S.F. � (To be removed) Irs-�c-2� �-s-� � Deck 2� x I6� IqZ S.F. E Dec� sf-Ai►'s IZ' x �I-' '-1�8 s.F. F �YovN- s�f-e � 6� X 8� '�-8 S.F. � Cor�cre-f-e sidew�l� 3' x 32' �Xo s:F. H (To be removed) '4� �9�-S:� � A�ivewQ M-� x 60� S`FD S.F. � Ti-iAr� r Q►�I- o f n � r s drivewq 3� x 12' } 2 18 s.F. K Calcre-Fe q�r caldrho�1er ad �-� x y-� � S.F. � C-+�t� (To be rerr�oved) �I� I98-�-�- M Si-�rwa -b I�e '-F� x 7d 280 S.F. N ►_ockbox b I�ce 4-� x 5 20 S.F. 0 R�i-qr►� wqN wi�rrt 75� o f I�e ( x '-I-B' y-8 s.F. P Re�-qi�►in wc�l ►o�v�n�-hin 75 o f Iqke ( x 60' 60 s.F. Q New r (To be added) 30' x 32' �1fo0 S.F. R NeW V �To be added) 30� X 30� �b0 S.F. S S.F. T S.F. U S.F. �/ S.F. W S.F. X S.F. y S.F. Z S.F. (1) Total Proposed Hardcover 5,806 S.F. r �� _ � _ � ,�; � � � . �� `" . `�r°�w .`�°'�''X� .� '.u� x ,d.. �z,: c �,a'-... �` ���"'���`. �-" ..�.���`������� �`'"�,�'� ' � �� . � _ .� . .. . .,..� ., . , _. . ... . ... a, , .._ , .-:. . - . .. . . . . ._ . _ D � Frs+ �oo s.f. o f rvia�s dec� �oo s.F. J TriQ►1 r Q►�i- o f n � bor s drivewa 3� x rz' + 2 �8 s.F. P Ref-qi'►in waN r�t wif-Yw► 75' o f Iq�e f x 60' 60 s.F. S.F. S.F. (2) Total Excludable Hardcover �8 s.F. (3) Net Proposed Hardcover [Subtract line (2) from line (1)] 5,628 S.F. (4) Total Lot Area (�' x 2�-0� 2�-,00o s.F. Proposed Hardcover Percentage [ (3) = (4) ] 23�.45 °/a Packet Last Updated: 04/19/2013 Page 13 of 23 � � City of Orono �oNo Hardcover Calculation Worksheet � Property Address: s� `� `�KfsHoa'` Prepared by: Date: Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Step 1: EXISTING HARDCOVER In the following table identify all items of existing hardcover on the property, keyed by letter to Certificate of Survey (su►vey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet (Exampl (Garage) (24'x30') (720 S.F.) e q S.F. g S.F. C S.F. p S.F. E S.F. F S.F. G S.F. H S.F. I S.F. ,1 • S.F. K S.F. L S.F. M S.F. N S.F. p S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Existin Hardcover S.F. Excludable Hardcover See C Code Sec 78-1684 : S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3 Net Existin Hardcover Subtract line 2 from line 1 S.F. 4 Total Lot Area S.F. Existing Hardcover Percentage [(3)_(4)J % (Proposed Hardcover next page) Packet Last Updated: 04/19/2013 Page 14 of 23 ' + ' , � City of Oronp �o,�o Hardcover Calculation Worksheet s� G,� Property Address: `'rFSH�a`� Prepared by: Date: Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Step 2: PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each ortion. Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet Exam le Gara e 24'x 30' 720 S.F. A S.F. B S.F. C S.F. D S.F. E S.F. F S.F. G S.F. H S.F. I S.F. J S.F. K S.F. L S.F. M S.F. N S.F. O S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. 1 TotalPro osed Hardcover S.F. Excludable Hardcover See C Code Sec 78-1684 : S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3 Net Pro osed Hardcover Subtract line 2 from line 1 S.F. 4 Total Lot Area S.F. Proposed Hardcover Percentage [(3)_(4)] % Packet Last Updated: 04/19/2013 Page 15 of 23 , ' , ' , � �-o�o Construction Near A Wetland � ,� www.ci.orono.n�n.us �' G` 952-249-4620 `qkFSHO�� Wetlands perform important environmental, aesthetic and hydrologic functions. In 2005 the City adopted regulations to ensure that wetlands continue to perform these functions and to improve their functioning (City Code Sections 78-1601 through 1614). These regulations require the creation and protection of buffers around wetlands when certain construction or land alteration activities occur. These activities are: Construction of a new house OR Construction or land alterations when all of these conditions exist: a. The po�tion of the property disturbed by construction or land alteration activity drains to the wetland b. The amount of grading exceeds 50 cubic yards or involves the disturbance of more than 5,000 square feet. c. There is a net increase in impervious surfaces that drain to the wetland, new impervious surface is added closer to the wetland than existing impervious surfaces, or there is a change in drainage patterns that the City Engineer determines will increase the veloeity or rate of runoff to the wetland. The width of the buffer varies from 50 feet to 16.5 feet. A 20 foot setback from the buffer is required for buildings. If the wetland is on adjacent property but part of the buffer is on the property where construction activity is occurring, then the buffer must be provided. Even if the wetland buffer is not required, the buffer and buffer setbacks must be observed. ATTACHMENTS A. Steps for Applying for a Land Use Application or Permit on a Property with a Wetland or Near a Wetland B. Request for Wetland Buffer Evaluation FOR MORE INFORMATION Contact the Planning and Zoning Department at 952-249-4620 or planninQC�a.ci.orono.mn.us. Reference: City Code Seetions 78-1601 through 1614 Packet Last Updated: 04/19/2013 Page 16 of 23 , ' � ' , � Steps for Applying for a Land Use Application or Permit on a Property with a Wetland or Near a Wetland BEFORE APPLYING FOR A LAND USE APPLICATION OR PERMIT: 1. If you are uncertain if a wetland exists on or near the property or wish to determine the required buffer width, you may contact Planning staff at 952-249-4620 or email planninqCc�ci.orono.mn.us. You may also view maps online at www.ci.orono.mn.us (click Livin In or Workinq In and scroll down to Maps.) 2. If there is a wetland present, determine if your project meets the threshold for requiring a buffer. a. If your project doesn't meet the threshold but will possibly place buildings and structures within the buffer or buffer setback, contact Planning staff to determine if wetland delineation is required. b. If you project meets the threshold, you must obtain a wetland delineation. A wetland delineation must be done by certified wetland delineator. The City does not do delineations, nor does it recommend delineators. The Board of Water and Soil Resources (BWSR) maintains a list at their web site (http://www.bwsr.state.mn.us). Many Surveyors/Civil Engineering firms employ wetland delineators or have wetland delineators they work with. 3. Submit the wetland delineation to the Minnehaha Creek Watershed District (MCWD) for approval. The - delineator can provide information on this process. Please leave the delineation flags on the property until the project is complete. 4. Have the approved delineation mapped onto a survey of the property along with the required buffers and buffer setbacks and the proposed construction. The surveyor must also provide a metes and bounds legal description of the wetland and the buffer as well as a digital CAD or GIS file in Hennepin County Coordinates. 5. Submit two (2) copies each of the delineation report, the letter of acceptance from the MCWD, and copies of the survey (with the legal descriptions and digital file) to Planning staff along with a "Request for Wetland Buffer Evaluation" form. Planning staff will have the City's wetland consultant review the delineation and make a site visit to evaluate the current condition of the buffer. You will be provided with a copy of the consultanYs report. If improvements are required the report will indicate the amount of the escrow required to guarantee the improvements and their initial survival. 6. If buffer improvements are required, prepare a plan for the improvements for review by the City. See City Code Sections 78-1601 through 1614 for more information. AT THIS POINT YOU MAY APPLY FOR A LAND USE APPLICATION OR PERMIT. If improvements to the buffer are required, the additional required submittals are: a. Three(3) copies of the buffer improvement plan b. An additional copy of the survey c. Digital CAD or GIS file of the wetland edge and wetland buffer d. Escrow and escrow agreement e. Purchase wetland signage (see fee schedule). Sign(s) to be placed as determined by City Wetland Consultant. Packet Last Updated: 04/19/2013 Page 17 of 23 � � , Request for Wetland Buffer �valuation Property Address: Person Making Request: This person is the: ❑ Property Owner ❑ Owner's Contractor/Consultant �Other Company Name: Address: City: Zip: Daytime Phone: Email: What work is planned? Signature of person making request Date } �� �xt�p� �-.+%'''r 'sc+ a�, -,'°a� ��,u,,. ,� � # ;��� .��$��� ��v �� .. ���� '` � €� �^'�s� -� �,4, : ��.$� �:'�`��rt ` �� 'r:: ,� � �� e, '� � � z y�. h,�: '�&� *'it �.�, .--W"�'1�w���!`����.��%�RF�'Rr ;. .tr.�- ,���' a�- ��'°� `�����*�' z'+` v�:q�r`� a '� 'f'� g^.:,s :a � � �: �'"��`����� '� � "" �*, � M �am�'� ��Slfl}€$�, ���..�t����sdr` �� # . ,y��y a�a�`��s � v.: �ss�:�.°��"�" ., �� �^r. Yw�""��a y��" '^ :. ti' � ��� P v�' fi" � ��'W €tl�bY`� �o-�`J.b J �, r C �.�*��kr' � �1 �'",�� "���� rv �, ;y�,.� �! �!�'`cuP"�' �" y#: �:x � �. � `�, " y�. �- � t s,�7!! �YP3�� ��"�;'�""�-� �''-0r✓�i�� � �: ��� ���-s4 a r�. 4r;�: � �,a.m x`�..�:• �` ���,a��'°'" � a� � ?� - „x e.���, � r �q4�,5� $�� '�-� �e.T � z�' � .�'"��������:��+ ; ��y�.. 4� � '' r i� t� � r " � �� $ � ' �� �� "�' z. � i aa ��k �.m��,� 5�.,� A � �'��,�� *"��� � " �� '�'py� - -��`'* �`{e � �e'�. 9''dr.;L�`'""�a r '�t'� r :. "� t�" ,,d=",i n t ,�.-s � x�.�- �'� �,;�'S� ��.... `" .i �s �4'�. -- ,� °�� r, **���'��1'�;�ah�,,,q."�"-2�.°�`2u% �z`.w`�� y� �� � ���� �f� �� ��� � �&" e� � , �ir ��:��`�d`��� "` � �` ��' ' � 3i.aa�����'�2�, ,�� �� ��n �rt � i ���';;i��.� ��c �'' � s, �`z�"� �� �. 3�= �-�� , r'��� a�o : s ' t � i. Y � w� t" a ,r � � x � �y� � "t` � s� �' �&,,. �a� 'ri"`�R��- �3��5q a�' . ����& uy ' fi - '^ .r� � ����i "Y'�`� �-an � "�i^�� 'a �� � �, �����, � v T *��{� �� . .��k���'����'ds '�'�`�� �i +$" � . S� ���� �� � � �' �� 5� .�'� #��.� �..'� �. 'r -� � _ ,� . `,r` ' ��* �� � � :e � � � ��' + ? r ' .. �fda�,: � ���.��'�t�,��'"`�% ����'� � y��a q �:s*is � rz,� .,� v�x .. .v c9 � . a �- m„ °k �, :��a�g:»t ��-". �i:��'v���`�ri �`�°�^�; '����� k�,'��r�� ''�,'"- �.,. .� 4A�.`� ��:� �- � �� � �� '� ��'3�.:� .:�;rv`� �x���'��� Packet Last Updated: 04/19/2013 Page 18 of 23 � ► . � Minnesota State Energy Code Calculations and Mechanical Code Requirements Form Additional copies can be found by going to: http://www.dli.mn.gov/CCLD/PDF/sbc 1322 cert.pdf ATLLQ�1..8 Certi�ca#e HI�N�l'Cosp�g Q�6e' �II�a1�C9l3: �t�o�ntr�or Mame- Liaense Number: tor.a�6ia� Tjrp�r vf �j�e Loc�s,diiaea S�r � R-If��e Ai� t �Ali YMai�! Ml�er 1 51.i6 on G�� /��� t-�ne ���� Rie�]oal Ti1�ri�E�ierar L�ieIIR R �e���� rd.�r�� n.�..c� r - ,�w,� �aer c�.r�r� r � �r� � r.�,:� � T l.��i.i. eew�i...�€rf�. To�`ar rir� Packet Last Updated: 04/19/2013 Page 19 of 23 DATA PRIVACY ADVISORY In accordance with Minnesota State Statute 13.04 Rights of Subjects of Data, Subd. 2, "Tennessen warning", we would like to inform you that your request for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidential information. You are notified that: 1. The information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data, but refusal may require that the City deny the permit or license. 3. The information may be shared with other local, state or federal agencies to the extent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve, some information may become public. 5. You have certain rights under Minnesota State Statute 13.04 (see following page) to review private data on yourself. 6. Your full name is required to process this application or permit. First Middle Last Address City State Zip Phone I understand my rights as stated above. Signature , Packet,Last Updated: 04/19/2013 ' � � Page 20 of 23 Sec.13.04 RIGHTS OF SUBJECTS OF DATA Subdivision 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section. Subd. 2. Tennessen warning. An individual asked to supply private or confidential data conceming the individual shall be informed of: (a) the purpose and intended use of the requested data within the collecting government entity (b) whether he may refuse or is legally required to supply the requested data; (c) any known consequence arising from his supplying or refusing to supply private or confidential data; and (d) the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall not apply when an individual is asked to supply investigative data, pursuant to section 13.82, subdivision 7, to a law enforcement officer. Subd. 3. Access to data by individual. Upon request to a responsible authority or designee, an individual shall be informed whether the individual is the subject of stored data on individuals, and whether it is classified as public, private or confidential. Upon further request, an individual who is the subject of stored private or public data on individuals shall be shown the data without any charge and, if desired, shall be informed of the content and meaning of that data. After an individual has been shown the private data and informed of its meaning, the data need not be disclosed to him for six months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created. The responsible authority or designee shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority Qr designee may require the requesting person to pay the actual costs of making and certifying the copies. The responsible authority or designee shall comply immediately, if possible, with any request made pursuant to this subdivision, or within ten days of the date of the request, excluding Saturdays, Sundays and legal holidays, if immediate compliance is not possible. Subd. 4. Procedure when data is not accurate or complete. (a) An individual subject of the data may contest the accuracy or completeness of public or private data. To exercise this right, an individual shall notify in writing the responsible authority describing the nature of the disagreement. The responsible authority shall within 30 days either: (1) correct the data found to be inaccurate or incomplete and attempt to notify past recipients of inaccurate or incomplete data, including recipients named by the individual; or (2) notify the individual that the authority believes the data to be correct. Data in dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data. The determination of the responsible authority may be appealed pursuant to the provisions of the Administrative Procedure Act relating to contested cases. Upon receipt of an appeal by an individual, the commissioner shall, before issuing the order and notice of the contested case hearing required by chapter 14, try to resolve the dispute through education, conference, conciliation, or persuasion. If the parties consent, the commissioner may refer to the matter to medication. Following these efforts, the commissioner shall dismiss the appeal or issue the order and notice of hearing. (b) Data on individuals that have been successfully challenged by an individual must be completed, corrected, or destroyed by a government entity without regard to the requirements of section 138.17. After completing, correcting, or destroying successfully challenged data, a government entity may retain a copy of the commissioner of administration's order issued under chapter 14 or, if no order were issued, a summary of the dispute between the parties that does not contain any particulars of the successfully challenged data. Packet Last Updated: 04/19/2013 ' � , � Page 21 of 23 C�ty of Orono Building Permit Application for New Structures or Additions Mailing Address: Permit number: .�OA,O PO Box66 `w Crystal Bay, MN 55323-0066 Date received: StreetAddress:' Received by: y 2750 Kelley Parkway Plan review fee: � ��� Orono, MN 55356 t'�kEsxo�`` Main: 952-259-4600 Total Fee: Fax: 952-249-4616 www.ci.orono.mn.us This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (Please print) GENERAL INFORMATION: Job Site Address: Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? Yes No If yes,a special event permit is required with Police Department and City Council approval 60 days p►ior to the event Shuttle bus service will be required unless applicant demonstrates s�cient on-site parking is available. Non-pem►itted events wifl not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: State License# Expiration Date: Phone: (cell) (office) Mailing Address: City: ZIP: Contact Person: Applicant is: Contractor / Homeowner �ci�cie o�e� Email and/or Fax: PROPERTY OWNER INFORMATION: Name: Phone(day): Address: City: ZIP: Email and/or Fax ARCHITECT/ENGINEER INFORMATION: Name: Phone (day): Address: City: ZIP: Email and/or Fax: PROJECT INFORMATION: Descri tion of pro'ect: 1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal& Water Supply ❑New Construction ❑ Single Family with ❑ Residence ❑Addition attached garage ❑ Garage/Accessory Bldg. ❑ Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer ❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water **Any earth movement may require ❑ Commercial ❑Other(specify) MCWD review S pertnits. ❑ Industrial ❑ Private Well Minnehaha Creek Watershed District(MCWD) ❑ Othe�: (Specify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehah r ek.or Estimated Construction Valuation (excluding land) $ Packet Last�pdated: 04/19/2013 . � , � Page 22 of 23 . STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a. Length (ft.)= Number of bedrooms= ❑Wood/Frame b.Width(ft.)= Number of garage stalls: ❑Masonry Areas in sauare feet Attached= ❑ Metal ❑ Pole Bldg. c. Basement= Detached= ❑ ICF d. 1�Story = ❑On-site Prefab e.2"d Story= ❑Off-site Prefab f. '/z Story = ❑Other(please specify): g.Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed A ticable ❑ ❑ Permit A lication ❑ ❑ Pro osed Buildin Plans ❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form ❑ ❑ Surve meetin all re uirements ❑ ❑ Stormwater Pollution Prevention Plan ❑ ❑ Hardcover Calculation s ❑ ❑ Se tic S stem Site Evaluation Re ort ❑ ❑ Access Permit ❑ ❑ Wetland Buffer Im rovement Plan ❑ ❑ En ineered Plans for Retainin Walls 4 feet or above 0 ❑ Minnehaha Creek Watershed District Permit s ❑ ❑ Plan Review Fee ❑ ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no altemative but to reject it until it is complete; • Acknowtedges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other govemmental agencies required by law. If you refuse to supply the information,the application may not be issued. . Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is r�quested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. Applicant's Signature: Date: Owner's Signature: Date: Packet Last Updated: 04/19/2013 Page 23 of 23 � '� 1 � �