HomeMy WebLinkAbout2014-00287 - addn/remodel/repair � , CITY OF ORONO * z 0 1 4 - 0 0 2 B 7 *
� ' 2750 KELLEY PARKWAY DATE ISSUED: 06/10/2014
ORONO, MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 1340 REST POINT CIR
PIN : 07-117-23-31-0021
LEGAL DESC : REST POINT PARK LAKE MTKA
: LOT 000 BLOCK 000
PERMIT TYPE : ADDITION/REMODEL/REPAIR
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ADDN/REMODEL/REPAIR
ACTIVITY : 434-RESIDENTIAL
VALUATION : $ 105,500.00
NOTE: SEPARATE PERMITS REQUIRED: PLUMBING,MECHANICAL,ELECTRICAL(STATE)
*ACNOWLEDGES ENG[NEERING COMMENTS DATED 5/2/14 INITIAL
RIOR TO ESCROW RELEASE AN AS BUILT SURVEY AND HA D COVER CALCULATIONS MUST BE SUBMITTED AND APPROVED
INITIAL
APPLICANT PERMIT FEE SCHEDULE 1,092.75
STATE SURCHARGE(VALUATION) 52.75
S J REUS CONSTRUCTION INC
3955 MERINO AVE TOTAL 1,145.50
WATERTOWN,MN 55388- Payment(s)
(952)446-1572 CREDIT CARD 1670 1,145.50
Minnesota State License#: BUIL-1513
OWNER '
PERET&JONI JOHNSON,ZIGMUND
1340 REST POINT CIR '
MOtJND, MN 55364-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according�o
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires sepaQate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revo a any time for due cause.
��� � d � �i !a
Applicant Permitee Signature Da Issue y Signature Date
M � ♦ 1 �
V ,(,/�
. ��"�
� � � CITY OF ORONO � � �,�5, 50
BUILDING PERMIT APPLICATIO
FOR NEW STRUCTURES OR ADDITI
�O� MailingAddress: Permitnumber: O�d � —� �
O PO Box 66
Crystal Bay, MN 55323-0066 Date received: —�—�
StreetAddress:' Received by: 7
� G� 2750 Kelley Parkway Plan review fee:� ���. �
`� ¢ Orono, MN 55356 a���_d--��
l�kESH� �
Total Fee:
Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us � Q,�`(�/
This application form must be completed in full and all required information must be submitted.
Incomplete applications will be returned. (Please print)
GENERAL INFORMATION:
Job Site Address: /����/p j�izs� L��,,,,�c�:ncLi2
Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes [��No
!f yes, a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be
required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed.
CONTRACTOR/APPLICANT INFORMATION:
Name: .Sy�i /�/��S' C��vs�,��
State License# i���� Expiration Date: 3T��T i�,
Phone: (cell) ��� -y/�-_ 7� 2 (office)9s�z -yy� �-is`72 ��
Mailing Address: " Cit : iil — ,✓ ZIP: - -
Contact Person: _�°���vr� �,�,' c Applicant is: Contrac o / Homeowner (Circle One)
Email and/or Fax: c,�'17i;v L.�`�r,2�,,,i,;« ,�„�T. ,.�„i i
PROPERTY OWNER INFORMATION:
Name: _Z�`c %�r,1�c%
Phone (day): P.,S"/ � �1 i y - '3 9 /. �
Address: /�yD f��ZsT i�����T ����cL�� City:�fZC'I,rlp ZIP: �j��j(/�-'
Email and/or Fax
ARCHITECT/ENGINEER INFORMATION:
Name: !i>�; �/"' v��� , k���/�/LG��
Phone (day): (�f-�.. ��� 2�p/
Address: /� �z. /lit.�i sil�:7;e � rz�viL City:/�'S�j�,��tli/�iJ ZIP: �f d -�f
Email and/or Fax:
PROJECT INFORMATION: Description of project:
1.Type of Project 2. Proposed Use 3. Structure Type 4.Sewage Disposal 8�
�� Water Supply
❑ New Construction L�?"Single Family with �Residence —/
j�Addition attached garage ❑ Garage/Accessory Bldg. �Public Sewer
❑Accessory Building ❑ Single Family with ❑ Deck
❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer
❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse
❑ Public ❑ Storage ❑ Public Water
**Any earth movement may also require ❑ Commercial ❑ Other(specify)
MCWD review 8�permits. ❑ Industrial ❑ Private Well
Minnehaha Creek Watershed District(MCWD) �, ther: (speCify)
18202 Minnetonka Blvd
Deephaven,MN 55391
Phone: 952-471-0590
Fax: 952-471-0682
www.minnehahacreek.or
Estimated Construction Valuation (excluding land) $ /c�S� ��1� Or U�
,�
,i
� � M
STRUCTURE INFORMATION:
1.Structure Dimensions 1.Structure Dimensions (continued) 2.Type of Construction
a. Length (ft.)= Number of bedrooms=
❑Wood/Frame
b.Width (ft.)= Number of garage stalls: ❑ Masonry
Areas in spuare feet Attached = ❑ Metal
❑ Pole Bldg.
c. Basement= Detached = ❑ ICF
d. 15t Story =
❑ On-site Prefab
e. 2"d Story=
❑ Off-site Prefab
f. 'h Story =
❑ Other(please specify):
E,
� g.Total Area=
�;a:
REQUIRED SUBMITTALS:
All of the information must be submitted in order for your application to be processed:
Not
Enclosed A plicable
❑ ❑ Permit A lication
❑ ❑ Pro osed Buildin Plans
❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form
❑ ❑ Surve meetin all re uirements
❑ ❑ Stormwater Pollution Prevention Plan
❑ ❑ Hardcover Calculation s
❑ ❑ Se tic S stem Site Evaluation Re ort
❑ ❑ Access Permit
❑ ❑ Wetland Buffer Im rovement Plan
❑ ❑ En ineered Plans for Retainin Walts 4 feet or above
❑ ❑ Plan Review Fee
❑ ❑ Application Escrow&Agreement
� ❑ Other:
APPLICANT/OWNER ACKNOWLEDGEMENT:
• Agrees to provide all information required or requested by the Building Department;
• Agrees to pay the City of Orono for engineering consultant review costs in excess of$500;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they
are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative
but to reject it until it is complete;
• Acknowledges the Escrow Agreement is completed and signed;
• Understands some or all of the information that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject
of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our
, purpose and intended use of this information is to annually update our records and records of other governmental agencies
'; required by law. If you refuse to supply the information,the application may not be issued.
. Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the
Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000
escrow to ensure completion of the as-built survey and all site improvements.
ApplicanYs Signature: � Date: ��� 7� /�
Owner's Signature: Date:
PLAN. REVIEW CHEC�(LIST FOR NEW STRUCTURES / ADDITIONS
Address/Permit Number: �3"TV ��S'�" �O(I�{,� L,{ Ir��1�-�
Description of work: ��'IGIt,� Q(]� ( �1�1V� .�(,,� alc�Ve,
Septic review by: N� Date Approved:
Zoning review by: 1'��Il� Date Approved: 5 '2�' ��
Building review by: Date Approved:�` � �
Grading review by: ,� « "/ Date Approved: S a3'��
Zoning District: Zoning File#: Reso#: Reso Date:
Zoning: Lot Area: SF/AC Width: Lot Coverage:ZQ lb SF���
Survey Submitted: �Yes 0 No Date of Survey. `� :`� ° Revised date(?): 5 'Z� � �
,
Proposed Setbacks: �
\ l �
Front(Lake) Rear(�tre�t) ( N S E fW�) ( N S ,� Ej W ) Other Buildings Wetland
--� Side �../ Side
(,�1 �'�. -�1 � ,,�� �
Defined Height: Peak Height: �-�� r FFE: FFE minus 6 feet= (Existing Contour)
,
Perimeter(linear feet) = 50% _ #of Stories :- Ok? � YES
FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE:
33 The distance between the lowest FOR A BUILDING ON A SLAB FOUNDATION:
START WITH proposed floor(of the basement or crawl
space)and the highest point of the roof. START WITH The distance between the top of slab and
If you have a... the highest point of the roof.
If you have a...
• GABLE OR HIPPED ROOF(no . GABLE OR HIPPED ROOF(no
%� windows): Subtract half the windows): Subtract half the distance
� ;' ^� distance between the highest point between the highest point of the roof
of the roof to the low point of the to the low point of the corresponding
SUBTRACTION corresponding gable or hipped roof SUBTRACTION gable or hipped roof
(BASED ON ROOF . GABLE OR HIPPED ROOF(with (BASED ON . GABLE OR HIPPED ROOF(with
TYPE) windows): Subtract half the ROOF TYPE) windows): Subtract half the distance �
distance between the top of the between the top of the highest
highest window and the highest window and the highest point of the
point of the roof roof
• ALL OTHER ROOF TYPES(flat, • ALL OTHER ROOF TYPES(flat,
mansard,etc):No subtraction. mansard,etc:No subtraction.
ADDITION Add the distance between the top of slab
SUBTRACTION Subtract the distance between the (BASED ON and the highest existing grade adjacent to
(BASED ON EXISTING basemenVcrawl space floor and the EXISTING the foundation.
GRADES) highest existing grade adjacent to the GRADES
foundation OR 10 feet(whichever is less). EQUALS Defined building height
EQUALS Defined building height
Shoreland District MCWD Permit Received Avera e Lakeshore Setback Met? Bluff
Yes � No � N/A 0 Yes No
�'Yes 0 No Yes 0 No 0 N/A
Permit Number: '4— ` Setback:
Stormwater Quality Existing Proposed Variance Required CUP Required �
Overla District Tier Hardcover Hardcover
Z�-.�p���,, �,�� � Yes No Yes No
I � �,v., � ��G J,r �' �:� TYPe�S)� TYPe�s)�
Updated: January 2013
v:\forms\plan review checklist 2013.docx
REMARKS (in-house):
Fees to be Char�ed YES NO
Permit
Plan Review
State Surcharge
Investigation Fee
SAC–Number of SAC Units
Other(specify)
Square Foota e $per Square Foota e �
a Basement X = $
1 S'Floor X = �
2nd Floo� X = $
Garage X = �
on
Estimated Construction Value: $ /0 5,sla0 —
Orono Inspections Required Work Requiring Separate Permits Required State Permits
� Site �Plumbing � Grading/ Filling � Well
0 Hardcover Removal � Mechanical � Fire � Electrical ,
�'Footing 0 Septic 0 Water Connection �
;
0 Poured Wall � Fireplace 0 Sewer Connection
❑ Foundation Survey � Masonry 0 Lawn Irrigation
� Radon Rock Bed ❑ Mfg.
f�Framing 0 Other(specify)
�nsulation
�s-Built Survey
Final
� Wetland Buffer
0 Other(specify)
REMARKS (in-house):
Other Review: Reviewed by: Date Approved:
Access: Existing: 0 YES 0 NO New: 0 YES � NO
OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND tNITIALLED
� 5 ' 2� �
r�o� rc t.2.0� av� 4�bu'l u vY �- I r�rd. t C�l �q �M,o
Yv�� �0.� ,�uJomi N�cd � 0�o�(�I
�
Updated: January 2013
v:\forms\plan review checklist 2013.docx
AD VANCE SUR VEYING & ENGINEERING CO.
I hereby certify that this report was prepared by me or under my direct supervision and
that I am a licensed professional engineer and a professional land surveyor under the
laws of the State of Minnesota.
��,�-z,�, �e. ��.,�,
James H. Parker P.E. & P.L.S. No. 9235
Step 2: PROPOSED HARDCOVER
In the following table identify all items of existing hardcover on the property, keyed by letter to
Certificate of Survey(survey must accompany this form). Use as many lines as necessary to
accurately depict existing hardcover status of the property.
ey o
Survey Hardcover Item (Describe) Length x Width Total (Square Feet)
(Example) Gara e (24'x 30') (720) S.F.
A House Structura Har cover 1,933 S.F.
B Drive 1252 S.F.
C Stoop 38 S.F.
D Entry 110 S.F.
E Propose Garage a ition 832 S.F.
F Dec 225 S.F.
G Dec 36 S.F.
H Patio 693 S.F.
I Retaining Wa 32 S.F.
J Retaining Wa 39 S.F.
K S.F.
L S.F.
M S.F.
N S.F.
O S.F.
P S.F.
Q S.F.
R S.F.
S S.F.
T S.F.
U S.F.
V S.F.
W S.F.
X S.F.
Y S.F.
1 Total Pro osed Hardcover 5 190 S.F.
Excludable Hardcover See Ci Code Sec 78-1684
I Retaining Wall not within 75 feet of OHW 32 S.F.
J Retaining Wall not within 75 feet of OHW 37 S.F.
H Deduct 100 sq. ft. of Patio 100 S.F.
S.F.
S.F.
2 Total Excludable Hardcover 169 S.F.
3 Net Pro osed Hardcover Subtract line 2 from line 1 5 021 S.F.
4 Total Lot Area 20 765 S.F.
Proposed Hardcover Percentage [(3)/(4)] 24.18%
2��j 26�� --' ��.OZ��
f�
� � ORON
0 COPY
AD VANCE SUR VEYIIVG c� ENGINEERING CO.
I hereby certify that this report was prepared by me or under my direct supervision and
that I am a licensed professional engineer and a professional land surveyor under the
laws of the State of Minnesota.
�
�c�r�r?,�� � l,o � a/z ,�h
James H. Parker P.E. & P.L.S. No. 9235
Step 2: PROPOSED HARDCOVER
In the following table identify all items of existing hardcover on the property, keyed by letter to
Certificate of Survey (survey must accompany this form). Use as many lines as necessary to
accurately depict existing hardcover status of the property.
ey o
Survey Hardcover Item (Describe) Length x Width Total (Square Feet)
(Example) Gara e (24'x 30') (720) S.F.
A House Structura Har cover 1,933 S.F.
B Drive 1252 S.F.
C Stoop � 38 S.F.
D Entry 110 S.F.
E Propose Garage a ition 832 S.F.
F Dec 225 S.F.
G Dec 36 S.F.
H Patio 693 S.F.
I Retaining Wa 32 S.F.
1 Retaining Wa 39 S.F.
K S.F.
L S.F.
M S.F.
N S.F.
O S.F.
P S.F.
Q S.F.
R S.F.
S S.F.
T S.F.
U S.F.
V S.F.
W � S.F.
X S.F.
Y S.F.
1 Total Pro osed Hardcover 5 190 S.F.
Excludable Hardcover See Ci Code Sec 78-1684
I Retaining Wall not within 75 feet of OHW 32 S.F.
J Retaining Wall not within 75 feet of OHW 37 S.F.
H Deduct 100 sq. ft. of Patio 100 S.F.
S.F.
S.F.
2 Total Excludable Hardcover 169 S.F.
3 Net Pro osed Hardcover Subtract line 2 from line 1 5 021 S.F.
4 Total Lot Area 20 765 S.F.
Proposed Hardcover Percentage[(3)/(4�� 24.18%
�
►
� � � � oR
ONO COPY
City of Orono
,;�`��°N��, Hardcover Calculation Worksheet
�' � Property Address: 1340 Rest Point Circle (our survey 130555)
`�� ��;,r Prepared by: James H. Parker P.E. & P.L.S. No. 9235 Date: 5/22/2014
`,�'�F�SHt)R �
`��.w_._......,.
Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5
Step 1: EXISTING HARDCOVER
In the following table identify all items of existing hardcover on the property, keyed by letter to
Certificate of Survey(survey must accompany this form). Use as many lines as necessary to
accurately depict existing hardcover status of the property.
ey o
Survey Hardcover Item (Describe) Length x Width Total (Square Feet)
(Example) Gara e (24'x 30') (720) S.F.
A House 1,933 S.F.
B S e 27 S.F.
C Bituminous Sur ace 729 S.F.
D Concrete Sur aces 144 S.F.
E Dec s 370 S.F.
F Garage 638 S.F.
G Retaining Walls 62 S.F.
H Bric Sur aces 669 S.F.
I Stone Sur aces 536 S.F.
1 S.F.
K S.F.
L S.F.
M S.F.
N S.F.
O S.F.
p S.F.
Q S.F.
R S.F.
S S.F.
T S.F.
� S.F.
� S.F.
W S.F.
X S.F.
Y S.F.
1 Total Existin Hardcover 5 108 S.F.
Excludable Hardcover See Ci Code Sec 78-1684
S.F.
S.F.
S.F.
S.F.
S.F.
2 Total Excludable Hardcover 0 S.F.
3 Net Existin Hardcover 5 108 S.F.
4 Total Lot Area 20 765 S.F.
a
Existing Hardcover Percentage[(3) (4)] 24.60/
�
5/21/14
Christine Mattson
Re: Building Permit Application#2014-00287
1340 Rest Point Circle
Dear Christine,
Please see the revised survey which addresses Jesse's concerns around erosion control, grading,
contours, and the sanitary sewer. We also revised the Hardcover Calculation sheet which takes
into account the shed and the retaining walls. Regarding the Structural Coverage,the concrete
stoop will have a roof over it supported by posts and none of the decks are 6' above grade.
Lastly, a copy of the permit issued by the Minnehaha Creek Watershed District was issued
5/15/14. You should have received a copy in your email from Amanda Bednar.
Thanks for the help and consideration,
Zig Peret
�o�o .
CITY OF ORONO
� � Street Address: Mailing Address: Telephone(952)249-4600
'S�, ` 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616
l �,�' Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us
9KESH04
May 13,2014
Steve Reus
S.J. Reus Construction, Inc.
3955 Merino Ave
Watertown, MN 55388
Re: Building Permit Application#2014-00287
1340 Rest Point Circle
On April 24, 2014 the City received an updated survey for 1340 Rest Point Circle. The following items must be
submitted or revised in order for your application to be considered complete and for the plan review to continue:
1. Certificate of Survey. A suroey dated 4-22-2014 was received and reviewed by City Engineer, Jesse Struve.
His comments are enclosed. Please have the surveyor updated the survey and submit two full-size, scalable
copies for our review.
2. Hardcover Calculations. Hardcover calculations were submitted, but appear to be missing the shed with in
75' of the lake and excluding retaining walls outside of 75' of the take. Attached is a copy of our hardcover
information packet. Please have the surveyor update the hardcover calculations and submit copies for our
review.
3. Structural Coverage. Residential lots that have a gross acreage of less than two acres shall comply with the
City's massing standards for strurtures. The total combined footprints of all principal and accessory
structures shall not exceed 15 percent of the gross lot area. All roofed structures more than six feet above
grade level and decks when partially or fully enclosed by fences, railings or walls which extend more than six
feet above grade level count toward lot coverage. Currently we don't have enough information to calculate
the structural coverage. Please clarify if the concrete stoop will have a roof over it with posts for support and
if any portion of the existing decks a,re 6 feet above grade or have railings.
Finally, we are waiting for a copy of the permit issued from the Minnehaha Creek Watershed District's (MCWD) or
documentation from the MCWD stating the'proposed project does not trigger any of their permitting requirements.
The above information is required in order for the plan review to continue. Please feel free to contact me at
952.249.4620 or by email at cmattson@ci.orpno.mn.us if you have any questions on the above requirements.
Sincerely,
CITY OF ORONO
NY�► �'"�
Christine Mattson
Planning Assistant
c Steve Reus via email at sireus@front�renet.net
Zigmund Peret&Joni Peterson; 134Q Rest Point Circle; Mound, MN 55364
Jim Parker at Advance Surveying via email at iim@advsur.com
Lyle Oman, Building Official
enclosures
Jesse Struve
From: Jesse Struve
Sent: Friday, May 02, 2014 11:37 AM
To: Melanie Curtis
Cc: Christine Mattson
Subject: 20140502 1340 Rest Point Cir-#14-00358
Melanie,
The survey submitted for the proposed house at 1340 Rest Point Cir and have the following concerns:
1. There should be some sort of erosion control plan in place to slow down the velocity of the water coming off the
driveway. Otherwise I foresee this being a continuous erosion issue.
2. Additional grading should be shown to the SE of the house to reflect a swale being maintained down the hill a
short distance and directing water toward the middle of the lot.
3. There appears to be an existing retaining wall along the NE corner of the property. The proposed grading just
East of this wall exceeds the minimum 3:1 requirement(shown at steeper than 2:1). This would not be allowed
because it would be too steep to feasibly maintain it. This slope should be reduced to a minimum of 3:1.
4. The survey should include contours extending into the neighboring properties so I can evaluate the proposed
grading between the houses and how the water flows.
5. The driveway is shown to be at a 20%grade heading down the hill. While the City does not have a maximum
slope standard it is standard practice to try to not exceed 10%. I would encourage the homeowner to consider
installing a heated driveway otherwise winter navigation on the driveway may be problematic.
6. While the proposed project does not impact the sanitary sewer on the lake side,the survey should reflect a
sanitary sewer easement and location of the sanitary sewer.
Jesse Struve, PE
Director of Public Works/City Engineer
City of Orono
(952) 249-4661 - Direct
(952) 249-4616- Fax
www.ci.orono.mn.us
1
�-��o
C ITY OF ORONO
I � � � Street Address: Mailing Address: Telephone(952)249-4600
�y� � j ` 2750 Kelley Parkway � P.O. Box 66 Fax (952)249-4616
� " Orono, MN 55356 ; Crystal Bay,MN 55323 i www.ci.orono.mn.us
�KFs H�F�
� ����
\�i,�,, � � �
April 10, 2014 , " --
Steve Reus � r`
S.J. Reus Construction, Inc.
�
3955 Merino Ave
Watertown, MN 55388
Re: Building Permit Application#2014-00287
1340 Rest Point Circle
On April 7, 2014 the City received a building permit applicatio s
incomplete. The following items must be submitted or revise� �
complete and for the plan review to continue:
1. Certificate of Survey. A copy of a survey dated 8-14-2013 was submitted, but it does not show the
proposed project. Please provide two copies of an updated, full size certificate of survey which meets
�,�� all of the City's survey standards (endosed) indicating the location of the proposed additions and
removals (and any proposed grading). The survey must be a signed original and not a photo copy.
2. Hardcover Cafculations. The property is located in Tier 1 of the Stormwater Quality Overlay District. A
� copy of the existing hardcover calculations were submitted. Please have the surveyor prepare
c G� hardcover calcutations, showing existing and proposed hardcover, using the City's hardcover calculation
Y" worksheets. Attached is a copy of our hardcover information packet.
3. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require
submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee
��;� reimbursement to the City for out-of-pocket costs incurred during the review of your plans. Additionally
this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and
stormwater. The required escrow amount for this project is $2,500. The escrow agreement is enclosed.
The property owner must sign the escrow agreement and submit a check for$2,500.
� Attached is the demolition permit application. Please complete and return. The attached escrow agreement
C;��� covers both the demolition and the construction, so only one check for$2,500 is required.
���.,
' ' .
Christine Mattson
From: Christine Mattson
Sent: Thursday, April 10, 2014 2:05 PM
To: 'sjreus@frontiernet.net'; 'jim@advsur.com'
Cc: Melanie Curtis; Lyle Oman
Subject: RE: 1340 Rest Point Circle/#2014-00287
Attachments: Hardcover Information Packet-2014.pdf; Survey Requirements- March 2014.pdf; Escrow
Agreement- Building Permit w Erosion Control 2014-00287.pdf; Demolotion Permit-2013.pdf
My apologizes...all the attachments are included this time.
Christine^'
From: Christine Mattson
Sent: Thursday, April 10, 2014 2:02 PM
To: 'sreus@frontiernet.net'; 'jim@advsur.com'
Cc: Melanie Curtis; Lyle Oman
Subject: 1340 Rest Point Circle/ #2014-00287
Steve,
Attached is a copy of the letter and attachments being mailed today. If you have any questions, please don't
hesitate to contact us.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway Orono MN 55356 (physical address)
PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ
�' 952.249.4620 g 952.249.4616
i� cmattson@ci.orono.mn.us � www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
PLEASE NOTE: Summer Office Hours start Monday, May 19, 2014
Monday-Thursday: 7:30 am to 5 pm/ Friday 7:30 to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday, May 26, 2014 (Memorial Day)
1
Jesse Struve
From: Jesse Struve
Sent: Friday, May 02, 2014 11:37 AM
To: Melanie Curtis
Cc: Christine Mattson
Subject: 20140502 1340 Rest Point Cir-#14-00358
Melanie,
The survey submitted for the proposed house at 1340 Rest Point Cir and have the following concerns:
1. There should be some sort of erosion control plan in place to slow down the velocity of the water coming off the
driveway. Otherwise I foresee this being a continuous erosion issue.
2. Additional grading should be shown to the SE of the house to reflect a swale being maintained down the hill a
short distance and directing water toward the middle of the lot.
3. There appears to be an existing retaining wall along the NE corner of the property. The proposed grading just
East of this wall exceeds the minimum 3:1 requirement(shown at steeper than 2:1). This would not be allowed
because it would be too steep to feasibly maintain it. This slope should be reduced to a minimum of 3:1.
4. The survey should include contours extending into the neighboring properties so I can evaluate the proposed
grading between the houses and how the water flows.
5. The driveway is shown to be at a 20�o grade heading down the hill. While the City does not have a maximum
slope standard it is standard practice to try to not exceed 109�0. I would encourage the homeowner to consider
installing a heated driveway otherwise winter navigation on the driveway may be problematic.
6. While the proposed project does not impact the sanitary sewer on the lake side,the survey should reflect a
sanitary sewer easement and location of the sanitary sewer.
Jesse Struve, PE �
Director of Public Works/City Engineer
City of Orono
(952)249-4661-Direct
(952)249-4616- Fax
www.ci.orono.mn.us
1
���o .
C ITY OF ORONO
� Street Address: I Maifing Address: I 7elephone(952)249-4600
y� � 2750 Kelley Parkway � P.O. Box 66 I Fax (952)249-4616
1 L Orono,MN 55356 I, Crystal Bay,MN 55323 i www.ci.orono.mn.us
�kFsxoF�
����
i�, �� � �
April 10, 2014 � .-
��� �
Steve Reus
S.J. Reus Construction, Inc.
3955 Merino Ave
Watertown, MN 55388
Re: Building Permit Application#2014-00287
1340 Rest Point Circle
On April 7, 2014 the City received a building permit applicatio S
incomplete. The following items must be submitted or revise� I
complete and for the plan review to continue:
1. Certificate of Survey. A copy of a survey dated 8-14-2013 was submitted, but it does not show the
proposed project. Please provide two copies of an updated, full size certificate of survey which meets
�,�� all of the City's survey standards (enclosed) indicating the location of the proposed additions and
removals (and any proposed grading). The survey must be a signed original and not a photo copy.
2. Hardcover Calculations. The property is located in Tier 1 of the Stormwater Quality Overlay District. A
� copy of the existing hardcover calculations were submitted. Please have the surveyor prepare
�G� hardcover calculations, showing existing and proposed hardcover, using the City's hardcover calculation
Y" worksheets. Attached is a copy of our hardcover information packet.
3. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require
submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee
� �,�;� reimbursement to the City for out-of-pocket costs incurred during the review of your plans. Additionally
�� this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and
stormwater. The required escrow amount for this project is $2,500. The escrow agreement is enclosed.
The property owner must sign the escrow agreement and submit a check for$2,500.
,J Attached is the demolition permit application. Please complete and return. The attached escrow agreement
��
�� covers both the demolition and the construction, so only one check for$2,500 is required.
. ,
Apri110,2014
1340 Rest Point Circle
Poge 2 of 2
Finally, your project may trigger the Minnehaha Creek Watershed District's (MCWD) permitting requirements;
please contact the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will
not issue a building permit without a copy of MCWD permits or documentation from the MCWD stating the
proposed project does not trigger any of their permitting requirements. The above information is required in
order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by email at
cmattson@ci.orono.mn.us if you have any questions on the above requirements.
Sincerely,
CITY OF ORONO
� �
ristine Mattson
Planning Assistant
c Steve Reus via email at sireus@frontirenet.net
Zigmund Peret&Joni Peterson; 1340 Rest Point Circle; Mound, MN 55364
Jim Parker at Advance Surveying via email at jim@advsur.com
Lyle Oman, Building Official
enclosures
, .
Christine Mattson
From: Christine Mattson
Sent: Tuesday, May 13, 2014 12:37 PM
To: 'sjreus@frontiernet.net'
Cc: 'jim@advsur.com'; Lyle Oman
Subject: 1340 Rest Point Circle/#2014-00287
Attachments: letter.pdf; eng comments for 1340 Rest Point Circle.pdf; Hardcover Information Packet
-2014.pdf; Structural coverage 2014.pdf; Survey Requirements- March 2014.pdf
Steve,
Attached is a copy of the letter and attachments being mailed today.
Please note, before we issue the demolition permit we need a copy of the Minnehaha Creek Watershed
District's permit or documentation stating your project doesn't trigger their permitting requirements. Also,
please be aware we need additional information with the building permit application to confirm the proposed
additions meet the City's structural coverage requirements. This is detailed in the attached letter.
If you have any questions, please don't hesitate to contact me.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway Orono MN 55356 (physical addressJ
PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ /V���WI�
` - "L'�� T�./
`� 952.249.4620 8 952.249.4616 � _
� cmattson@ci.orono.mn.us � www.ci.orono.mn.us t (n��A''v
�r�
Office Hours: Monday- Friday 8 am to 4:30 pm � �(�(�, �
�� ���
PLEASE NOTE: Summer Office Hours start Monday, May 19,201 �
Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 to 11
OUR OFFICE WILL BE CLOSED: Monda Ma 26 2014 Memor 6��c
Y, Y , ( �
1
Hennepin County GIS - Printable Map Page 1 of 1
He�n�e��
- � - � • ! '
. • _,
,�;�.-
' � � wA.r a � � n ,:�:.� . �� .t`f. '' _ ._..� �' ..�.
- ►'/� ��.� - � K,��.. ��` +F� � _ C
� ,.�.� `.11'I- ' �_f�. • . , t� , � '
`"�r ..� '.� `{ �i . �P'5-3.,��X' . f. ��,y .��; ���P•F � � ' �';bp. Y ~a��
.�
�,�., 4 � p •`r "n 4� w R;�i•� 1 �y� , ��., �� V++. q',
�� � � �
,,.
�!4+a M "1�� +r� 1 . L . � 'k . a x • "' �"'�I•��`�'�''�
1 '4 L 4 J,' a r �'a } �* ��'}.
�' . '� '�+�'' p�.. ''� � ' � �'' 'y� �.
I . ,� �P.�Y1.` .� 1.� ,�. • �,'" .� ' . W.�� A �t ..
, •44 +`5.±,r'�� ► e" " .Y» � r aA,, a � s ai
�. . ��,+'-�� .� - ,�4 . ._ey a�I�A.'. ,fr���. }.� -�." 1 �'�y�_. i� *- b
.
. .k.". ^�,•Jr_
+ , `�`��'�` — *y�' r . r
�`,�M� �����,�,�, i 'r � x..,_�,�;r "'�' ,� _ '�!",• '_ r
. ,
, �� ' ,
, ,},,. '. ;,� ti�n . ,� , �1 �}, '� . F t �.;.�
f
S
t �- ' ��-y � ., .. _ . ' .;
.
\ "
.
. .. a�' '.;.. , `
4.
� �r� � i r.. � ���. • s l4
f r-, d * s�:�
� �_ � ♦
�,�` .4�� � ��p5 ,,.�'�� .� �" ^ • ' � { h - . + �
', +�' t. �, 4�., ��; �' `'
. ��'.Y ]..�+ ��r_�,4�R�: ,' „� �. i�u; ' ��' �'� � ..
a 'i, 1 .'�� �' >�Y=,+ � , �.�r+ + � 'FR ` i
� , � A ��. p"�'��.1 ' t :���� ^��__ �� . � . '�`x^� ��M� ,�.
R �i��. � .�. �;r�t,�. rs, T . . '{ry .,s- . �� ,.. .. ''�:
' �'eSk • �,' r
�'' `.�L'�_ _ • s� • rr "� ,*'�N, . ,�ri,� 4
, '� µ �i i' • �. ��.
� �`' + ; J `' l� ��� s� � '
. a
.
J .. � . _ �..
! e - . �''�1.� a-.. �J . .-�
.� '�_ y ° .y � '��� �� rs � � E _._�." .
1 . � „
, '� . '�°�M.'�• .f� � `�'�*' f4` ' ,r' �1,
' �Y _
�►. ,. � � �,�,,�,,�,�, . � � ;�i ,s, �, _ p. �,,
' 4 '���..�. �� 1 �' s : � �.��"�',,, .o.;,�' '+�,-t
�� � ^ ,,��� . � '�,,� �:. � , `� tr�'�"`+.
..
.
:. �� � = � ` ' , �k : �� � �I
.• ' `
_a -. . � .�,7�+S1 �,i. � i., t,,..
, .,
.^ ` ` , � F� '.R �
.
' ' 4i ` r`
-._, �.. � , .� � � i
. . ,� � - . .. -..i�: .
i �Mn
1 �� p .y� � ). �, � " ��� 4�' ��.
ii f �� e. ti t���,
�v �..'I�er� � ., i. , -+r. .;m� . ����y�j �
„ i ' `. __ ��. ' '.�yy� ,,� ��1. , 'C€',.. �� ',^ � _ " 1"y.�.`�V..._
�� -��`�,�t . ' . ► � � Yj �� !�+"� ,�• ,,'�'"
:�. „e►_` ' °< <, ,. � �V�-t�`' " �+.�� � �4 "
•,,��'�` ' �?.�ir y r .. •,�� .a:� . 9 � �: � .
��3` rl� ', � .� . .''� ��' �� _.� ti�,�'..� ± '.�i �'1' ` '�..- . ..� � ta
a�� .•�` ��• . '. . J ' r� �+�y id '1_.f -�
_ �._��' ''' '.+-'- •, �"'..`� ,
k '� * • , � l. y �. � �� - � � ' '�a.��. r -
�,.,< , ��f , �' , � i
� `r- �. - _ ' . 1� .'�.
_ . . , �
i
�. .
. .
r� �:� . � .1r . . '.. � ' ��, �.i�_. . .t . ; I�� �.. "�
Parcel 07-117-23-31-0021 A-T-B: Abstract Map Scale: 1"=50 ft. N
��' Print Date:4/29/2014 � ;
Owner Z C Peret&J F Johnson Market $532,000 �
Name: Total: '
Parcel 1340 Rest Point Cir Tax $6,159.74
Address: Orono, MN 55364 TotaL• (Payable:2014)
Property Residential Lake Shore Sale $539,000 I
Type: PI'iC@: This map is a compilation of data from various
sources and is furnished"AS IS"with no
Home- Homestead Sale 09/2013 representation or warranty expressed or
stead: Date: impiied,including fitness of any particular
purpose,merchantability,or the accuracy and
completeness of the information shown.
Parcel 0.45 acres Sale
Area: 19,564 sq ft COd2: ,COPYRIGHTOO HENNEPIN COUNTY 2014
� Think Greert! ,
_ _ _..— -
http://gis.co.hennepin.mn.us/Property/print/default.aspx?C=4495 5 6.5 6620000023,4977974... 4/29/2014
�l/J DAT TIME �
CITY OF ORONO CALLED IN ' "� �
INSPECTION NOTIC SCHEDULED - �
PERMIT NO.r�?�� �'�'�OOZ��COMPLETED
ADDRESS �3 S� �=C=dr[ � ��
OWNER TELEPHONE NO.�Iz T�o �7�Z�
CONTRACTOR �t,� �-
� DESCRIPTION ����n
� /I�QOTING ❑ PLUMBING AL ❑ EXCAV/GRADING/FILLING
Q ��❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION O WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP � COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ � DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
� � PLUMBWG RI ❑ SEPTIC FINAL ❑ FOUNDATIOWREMOVAL
Z OWNERICONTRACTOR TO MEET YOU:_YES_NO
c� COMMENTS:
� �
a �'Od"f!•L� � �� fJ� n —
o � �� �,�( 0�4 �` 1.�� a # �/ /'�G v C`b ti�-
a
�
� �-- !`-'c:N10�/�' 4�Cfi M'IG� � �'��r � ►a w1
W ---- � �
� ��lF� ti G d /" �o r �l' - �
Q ,�04 rrKc,
� ��—
Z �
� � �e4K /'✓!k� ��0� re�� �— rYl4� -i.��i�-v
� C�GqC/4.�iC t�� �a�/+'c cfi --fr ��'�dJd4t��
�
d
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
� RECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
W
0 ❑CORRECT WORK,CALI FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
�CORRECTUNSAFECqNDITiONWITHIN HOURS. p pHOTOTAKEN
INSPECTOR WFLL RETURN
❑STOP ORDER POSTED.CALL iNSPECTOR �CITATION ISSUED
❑ INSPECTION REQUIR�D.CALL TO ARRANGE ACCESS.
Call f ' s ion 2 urs in advance,(952) 249-4600
Owne tractoron ite: v' cL ��
Inspec �---
White Copy�lnspector's Fle Canary CopylSite Notice
5� D E TIME /
CITY OF ORONO CALLED IN 7"
INSPECTION NOTI E SCHEDULED - :O'O
PERMIT NO. � "a4 Zg COMPLETED
ADDRESS l3 S�O �-Q�4Z~ � (�
OWNER TELEPHONE NO. ��L �8 �7�Z
CONTRACTOR S J �-� C-�y�-�-�
� DE RIPTION 1—���'�-�
�
� FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FIWNG
Q ❑ URED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
❑ TREE REMOVAL
Z � INSULATION O WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP O PROGRESS
� ❑ FINAL O SEWER HOOK-UP ❑ COMPLAIM'
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
Z OWNERlCONTRACTOR TO MEET YOU:_YES_NO
v�i COMMENTS: �' �
W - / ^ -,
a
J
OO
� / C� ^ '
� � ��
0
�
� � � � .
Q
�
z
�
�
�
�
d
W� ❑WORKSATISFACTORY:PROCEED ❑PROJECT COMPLETE
W O CORRECT NfORK 8 PROCEED O ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COA/ERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pHOTO TAKEN
INSPECTOR WILL REfURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hou in adva ) 249-46��
OwnerfContractor on site:
Inspector:
White Copyllnspector's File � Canary CopylSfte Notice
�-7 �
D E TIME
CITY OF ORONO CALLED IN �D_.��
INSPECTION N TIC 7SCHEDULED /t�� �
PERMIT NO. � '� / OMPLETED n
ADDRESS � T/� '/
OWNER � � TELEPHONE NO��G2S�-�7"-3�
CONTRA O ve �
�; DES IPTION � ,
�
� ❑ OTING ❑ PLUMBING FINAL ❑ EXC GRADING/FILLING
Q POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
ZSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
�NTRACTOR TO MEET YOU:�YES_NO
� COMMENTS:
�
W
a
J �
O
�
� — - ,- , � :
W
Q � _.f L ` . ` -
� i
2
W
�
W
�
�
W WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
W ❑ RRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALI FOR RE�NSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN
INSPECTOR WFLL RETURN
❑STOP OROER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advan 249-46�0
OwnerlContractor on site:
Inspector.
White Copyllnspector's File Canary CopylSfte Notice
" � j�� DATE TIME "
� CITY OF ORONO CALLED IN
INSPECTION N TIC � SCHEDULED �
PERMIT NO. � ���� COMPLEfED
ADDRESS � � �T� ���t �t C� 1Z
OWNER Z�"I � �VLYISISY� T LEPHONE NO. �S � - Z 1 U-3�1�1�
CONTRACTOR ��J�'�� � ✓� � �
� DESCRIPTION ���� ��� � ����" �
ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL —�""
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLIN�
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
w ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE ❑ TIC INSTALL ❑ FOUNDATION/REMOVAL
2 OWN�NTRACTOR TO MEET YOU:�YES_NO
c�.� COMMENTS:
�
W
a
�
�
O
�.
�
O
�
W
�
Q
�
2
W
�
W
�
�
d
W WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLETE
❑ RRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REtNSPECTION TEMPORARY
V BEFORECOVERING PEfiMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIREO.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in a . ( 5 249-46��
OwnerlContractor on site:
Inspector_
White Copylinspector's Ffle Canary CopylSite Notice
�� � � �� E �. �� TIME
CITY OF ORONO �a(�� ''� CALLED IN �
INSPECTION TI E SCHEDULED
PERMIT NO. L� COMPLETED
ADDRESS
OWNER TELEPHONE NO. ' f �
CONTRACTOR ve
>`; DESCRIPTION
�
� ❑ FOOTING ❑ PLUMBING FI A ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL O MECHANICAL RI ❑ LAKESHORENVETLANDS
��RAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
yi -
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS: �(!� ����r� , _G J� /�_
a /� RSLI�d,G .fl�i• --F N'leG�i • J"is�a ��t S '�
o � ,�rou� a�i.�i�, � f8' �%a—�s,, ar�c�..�,a.�r�y�c
'" -�or a? .����Y��- J��P� �s ,� /6 " �_ c .
�
W�7l ,�i N ���..��G��C� �6� IIl.E S 7'��/ � �t��f3orc G�ofe�
� �l�va�a. �Q�(� dr� ��6a� i� C/a�cJ! S.c�C e,�—
Q � T� �+
Z �I�a02L+'t6 v �` l��✓�� /1 k/� �L�bcJ � 7�r�
� 7FCii/ �P�. 73 r �- LJ�'C(
�u u�,�.� 9
� / � e u�
�„ - e"�' rY �''w''„�o�7 e.
GW ❑WORK SATISFACTORY:PROCEED �� � ❑ PROJECT C0�1PLEfE
� �e�K�e�rvr,
� ❑CORRECT WORK 8�PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
��ORRECT WORK,CALL FOR REINSPECTION TEMPORARY
��� B�OREC0IIERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN
INSPECTOR WIIL REfURN
O CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
INSPECTION REQUIRED_CALL TO ARRANGE ACCESS.
C "nspection 24 hours in advance. (952) 249-46�0
Ow rlCon or on ' .
Insp '""'
White Copyllnspector's File Canary CopylSite Notice
/�� � �� � �
" DATE TIME
CITY OF ORONO CALLED IN =_��^
INSPECTION NOTICE SCHEDULED �b ���1
PERMIT NO. � i� I y -C'GZ�7COMPLETED
ADDRESS �� ��U ���.G�.� /�",�f. �/!�
OWNER TELEP�NE�NO. �..���a��'��9�
CONTRACTOR
� DESCRIPTION �'� � �� ��� ���
ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RAD�iN SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FFj/�MING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ SULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
J FINAL ❑ WATER HOOK-UP
❑ FOLLOW-UP
W BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
_
J ❑ DEMO-SITE ❑ PTIC INSTALL
2 OWNER/CONTRACTOR TO I�AE�T YOU:�YES_NO
�—� ' 7
� COMMENTS: ' //� ` i
W
�
j -`.
O � �
�, � i .�
� �
p ___ -.. � " N �
� ti _ �.
W
� , �
Q
� � /
W
�
W
�
�
d
� ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑ RRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 RRECT WORK,CALL FOR REINSPECTION TEMPORARY
V B FORE COVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WFLL REfURN ❑CITATION ISSUED
O STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. 9-46QQ
OwnerlContractor on site:
Inspector.
White Copyflnspector's Ffle Cenary CopyfSite Notice
I _i
. •
, • . � •
� • ,
emo
To: Finance Department
From: Christine Mattson, Planning Assistant ('J�"
�
CC: Street File
Date: July 15, 2016
G/L: 101-22205
Re: Escrow Refund
Building Permit #201400287 and Demolition Permit #201400358 pertaining to 1340 Rest
Point Circle is complete. Please refund$2,500 to the property owner, Zigmund Peret.
The following is attached:
• Original signed escrow agreement
• Copy of cash register receipt showing escrow amount received
Mail to: Zigmund Peret
1340 Rest Point Circle
Mound, MN 55364
w:�,street files�rest point arde\1340Aescrow refund 201400287&2014-00358.doac
} �/
_�
BUILDING PERMIT ESCROW AGREEMENT
Orono Building Permit#2014-00287 and
Demolition Permit# aZD/y- !a'17 35S1
AGREEMENT made this�day of �'�.� , 20�, by and between the CITY OF ORONO,
a Minnesota municipal corporation ("City")Zigmund P ret&Joni Peterson ("Owners").
Recitals
1. A demolition and building permit applications have been filed for demolition of a detached garage
and construction of an attached garage located at 1340 Rest Point Circle the ("Subject Property"), legally
described as Lot 9 and the southwesterly %z of Lot 8, Rest Point Park, Lake Minnetonka, Hennepin County
Minnesota including adjoining '/2 of vacated street which lies between northerly line of Lot 10 and the
southwesterly line of Lot 9 according to the duly recorded plat thereof.
2. Owners request the City to review this application.
3. The City will commence its review of the application and incur costs associated with said review
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to
reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal
consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the
Owners would be responsible for under a building permit application. The escrow will also guarantee
reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in
accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79.
The financial security may also be used by the City to eliminate any hazardous conditions associated with the
work and to repair any damage to public property or infrastructure that is caused by the work (including planning,
engineering, or legal consultant review) associated with demolition permit # oZ0/N-Do35S and
building permit# �/�,/-Oo ��'�' if compliance with the approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment
to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to
reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCR0IM. The Balance on deposit in the escrow, if any, shall be returned to the
Owners when the review has been cpmpleted and written notification is received from the Owners requesting the
funds.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses
incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the
subject property pursuant to Minn. Stat. §§415.01 and 366.012.
CITY: CITY OF C�RONO ' OWNER:
By: W� ay 1/
�ts: '� � Y�n b l�
a' . :• CITY OF ORONO * 2 0 1 4 - PJ 0 3 5 9 *
2750 KELLEY PARKWAY DATE ISSUED: 04/24/2014
ORONO,MN 55356-
(952 249-4600 FAX: 952 249-4616
ADDRESS : 1340 REST POINT CIR
PIN : 07-117-23-31-0021
LEGAL DESC : REST POINT PARK LAKE MTKA
: LOT 000 BLOCK 000
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: THIS$2500 ESCROW IS TIED TO BUILDING PERMIT#2014-00287 AND DEMOLITION PERMIT#201400358
APPLICANT ESCROW FEE-BUILDING 2,500.00
ESCROW FEE-EROSION CONTROL 0.00
PERET&JONI JOHNSON,ZIGMUND ESCROW FEE-GRADING 0.00
1340 REST POINT CIR TOTAL 2,500.00
MOtJND,MN 55364-
Payment(s)
CHECK 300 2,500.00
OWNER
PERET&JONI JOHNSON,ZIGMtTND
1340 REST POINT CIR
MOLJND,MN 55364-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant pertnission for additional or related work which requires sepazate
permits. All provisions of laws and ordinances governing this type of work
shatl be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has¢ommenced.
7'he applicant is responsible for assuring all required inspection,s are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
/ /
Applicant Permitee Signature Date Issued By Signature Date
' � . . ,
'' .__ - - -
�
I
i .ra�i :i� �Y`ut�A ..
;
� 'G� ��,t��;�Pr�y��yk���y
��• x .��� Y4�a :W�7.�'� !�"�,. �..:�. .
.i.�. .rwL. �!4:�`'T'aFK�� .. '
� i. .. .' ; l
�E°'�'�0.�C"� �i':�i�lfki4 : 6!�? � :c,t;.�r : i
- .. . . . ... Y, - - .i
`.�t�ffi!!��`�Y'�C I
i
,�'�£!?tlL� �'dT� ' �i�j
�'Tb��r` ,
�c'��' r"'3}Ct'6' L)I ')4'�. C 41+�1.�.I .
� ��� i
lief:r•r�d �����Cav�ir,p��� l����ik �
�`.. .7.��[* .. . rC C��:i�_ .�
' �i':�k• "�—"`�"�.` i
; C,`heck [�vs' ���.� �,��!s,uC' ;
�a�btt`: ;
i Zi nur,d P�;,�� ;
�G43� �i;:�il I�� C!r+J4RJ��fi �
� �
�
� �i3 @ 7gT�L!"L�; . -_--_� ,�_�[�'�, i
��S/��F/�115� �:L?:fl� � i
i _ I
;
i
I
,
�
- i
� �
L��� � DATE TIME �
CITY OF ORONO CALLED IN
INSPECTION N TIC SCHEDULED _��7�
PERMIT NO. Zg COMP �
ADDRESS �� � �
OWNER TELEPHONE NQ����3y�L�
CONTRA ,
� DESCRIPTION ��
ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FI�LING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL
O TFiACTOR TO MEET YOU:7G YES_NO
v�i COMMENTS:� F'�df/1�7G �cotM./.J¢r�.P GJ��yLbtJ�
� ,
W
�
j �Rl a6/ e He� � n d w e!-"`,ie;�
o �,
� .l N5�/ �✓ �.-�s� - !,�-¢/1's - �/��
� . _
!/�l.Od/ ,/�S✓�"�c r
W
� '' �lar�/' – � -5d
Q
zG'►��` �`' �- 5 a —
� D� �- ���
W
�
j
�/�R�3ATISFACTORY:PROCEED ❑ PROJECT COMPLETE
w�O CORRECT WORK 8 PHOCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COYERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
11 for the next inspection 2a hours in advance. (g52) 249-4600
Ow ontractor on site: �;5
Inspector. �t r,--� �