Loading...
HomeMy WebLinkAbout2017-00728 - septic • • CITY OF ORONO * z 0 1 7 - 0 0 7 z 8 * 2750 KELLEY PARKWAY DATE ISSUED: 08/16/2017 ORONO,MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 600 PINEHURST CT PIN : 06-117-23-34-0007 LEGAL DESC : LAKEVIEW OF ORONO : LOT 19 BLOCK 1 PERMIT TYPE : SEPTIC PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : SEPTIC(NEW OR REPLACEMENT) ACTIVITY : SEPTIC(MOLTND) NOTE: (3)PRECST TANKS 2250 COMBO 1300 LIFT APPLICANT SEPTIC NEW OR REPLACEMENT 400.00 TOTAL 400.00 HAYES&SONS EXC. INC. Payment(s) 263 82ND STREET S.E. CREDIT CARD 5293 400.00 MONTROSE, MN 55303- (763)479-1762 Minnesota State License#: sept-L640 OWIVER Gonyea Homes 1000 BOONE AVE N #400 GOLDEN VALLEY,MN 55427- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revo�t an time�or e cause. _ � � _ � �� � � ��� � � � U l Applicant Permitee Signature Date Issued ignature Date , �. �NO P P.00BoxO66 n0 RECEIVED FUR GTY USE ONLY 2750 Kelley Parkway i�I p ry i 7 Date Received: �� / � Crystal Bay, MN 55323 �UIV 2 U L�I 1 z� �� Phone:(952)249-4600 Permit# 1 �— �70� ��kasHoa� Fax: (952)249-4616 Approved By: CITY OF ORONO Amount$: /' CITY OF ORONO —SEPTIC SYSTEM PERMIT APPLICATION p �`�\� (All permits must be approved by the On-Site Septic Manager and/or Building Official) �����#�.f C��vi���-l�fcarrx��#iQn; � � . ^ l - Site Address: °���' v� l � Vl L/�'s� � �u (Z-� Owner: ( c� u i��y..e c� Yvl L,=S Mailing Address: City: Zip: Home Phone: Alternate Phone: Gt�tr��pr/;��ii�rlt`1���t���� -�,. . V=-�-� Contractor/App:. �� �� d-�� t Contact Person: Address: 2�� � �i-- S�� State License #: � � (� City: _�'1�-n,�-�-��_.__ Zip: S�3� '� Expiration Date: _ Z� � � Phone: C� ( � � � `1 e� i l Alternate Phone: x���� � s����= �S flF flCCi1PAN�''if ��,� �; ,��;; esidential ❑ Commercial ❑ Other � : **ATTENTIOtV APPUCANT** _ . , ,, t Fi11 in a!� a _ ro riate blanks ar�t� check a�l a ro r�ate boxes. � Tanks: �recast Concrete ❑ Fiberglass ❑ Plastic ❑ Other: Number of Tanks: ��a ��, Size of Tanks: Z 2 S� G✓Yw� � ���� �� �`� Type of Activity: ❑ Trenches Mound ❑ Pressure Bed ❑ Chambers ❑ Holding Tanks ❑ Pre-Treatment ❑ Other NOTE: Provide an As-Built of the system before the final inspection. A 24-HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. Page 1 �, . New or Replacement System $400.00 � V � Repair Existing System 100.00 (Tanks or Drainfield) �� �— Total The undersigned hereby applies to the City of Orono for issuance of a septic system installation permit, agrees to do all the work in strict accordance with ordinances of the City and �egulations of the State of Minnesota and certifies that all statements made on this application are complet , an corre t. � �� ^� � Signature of Applicant � Date: MPCA License No.: L� Staff Review: Accept Denied Reviewer: Date• << Reason for Denial: Comments (to be printed on inspection card): 1. Applications for septic system permits may be mailed or submitted in person at the City offices; however, permits will not be mailed out. The permit must be picked up in person at the City offices and work must not begin unless the permit card is on the job site. *** DO NOT MAIL PAYMENT WITH THIS APPLICATION *** 2. Permits will be only issued to contractors holding a Minnesota Pollution Control Agency (MPCA) Septic System Installers License. 3. All work must be done in accordance with the approved septic system design. 4. The following inspections will be required for all septic systems: A. Tank installation prior to covering. B. Drainfield trench installation prior to covering. For mounds, inspection is required after rough up, but prior to sand placement (sand must be jar tested for silt content) and again during pressure distribution piping installation in the rock bed. C. Final inspection to verify final cover depths and to verify that all pump station (where required) components are functional and comply with codes. 5. MPCA licensed Installers or their DRP (Designated Responsible Person) shall be present during all inspections. Page 2 � f0 ��� ��G�, �� tti{S SYSTEM IS DESIGNED FOR r .�,BEDROOMS. ANY INCREASE tN NUMBER ���'Q � ��G�G �a�Q �J�r�l� OF BEDROOMS INVAUDAlES THIS DESIGN. ,�� � �� �Q ���� , ��� 9 � �' �-�� Joseph Olson D.B.A. Rusty Olson's--Soil and Percolation Testing Joseph .T.Olson--iVIPC 4 License#810 11-�81 Rivervie��Rd.�E,Hano�ter,?VI�1 �53=11 (763) �98-8779 Faa(763)�98-8290 June 5.20}7 Gon��ea Homes 600 Pinehurst Coun Orono,Hennepir Count} This on-site Sewage Treatment Sy'stem is dzsi�ned for a T�pe l,five-6edroom home in accordance w•ith �he Minnesota Pollution Contral,�genc��Chapter 7080 and local ordinances. The periadicall��saturatzd soiis�vere located ai 1-i-22 inches(mottled soil").Due to the periodicalh saturated soils,a press�rized mound system wiih b i�ches of rock�vill need to be instaUed ta treat the septic et�iuent.The bo�om of the treatment area musF be located a�ieast.i'abo��e the saturated soils.This system is designed e�ith 6 inches of rock. The soils at a depth of 1�"have a percolatian rate averagins !3.6 MPI. A 2250-gallon septic tank is desianzd for this site.All tanks need to be insulated if chere is less than tti��o fc�t of cover ove�[he top of the ranks.Clean outs must be insralled on the end of thz laterals for maintenance. Use?'32 inch perforations on the laterals. A D3rN'in 1300_allon pumping chamber x-i1l need to be installed to lift ihe zff]uznt ta t}►e treatment area. 7he power suppl� and switches musc be loeated outsid�the manhole and pumping chamber in a Heatf►erproof enclosure.A warning device must be instaUed�vith light and sound devices:this is in case of a pump failure.A flow measurement device must be insta}led.lncluding but not limited to a water meter, event counter.ruimin�time clocl:s or elzcuonical}}�conaolled dosin�. Keea a11 heavv ectuipment of#'of the nroposed treatment areas before,dnrinQ and after construction. The area around both sites must be fenced off b��the contractor before anr construcrion be�ins. Wiih proper installation and maintenance,this s�stem should have no probiem in trzating septic et?luent effectively.Nothzng other than�ra� u�acer,{laundru,sho�ti�ers,etc.j Human�+�atzr and toilet tissue should b� disposed of intu the septic tanks.Garbage disposals are not recommendetl.Additives mu�t not be used the} map•cause harmfal dama�e to}`our septic s��stem. It is recommendedxhat you pump th�septic tank�e�en n+�o vears. � � S"'�`�`' CITY QF ORONC? .= ;= --�. SEPTIC PE IT PLAN V ,W �-;' 3oseph J.Olson INSPECTOR ` D� PERMIT NO.�4�Z$ APPRCIVFD AS Sl;A�11TTED � APPROVGD WITH CORRECTiONS AS NOTED NOT APPROVEI)-CORRECT&KESUB�i1T Thcsc camments are for your inl'ormation. Ali work shul!bc dune in full compliance with ull upplicable septie und zoning cude, kequiremenis incluJing itcros not specificully nutcd in this rcview. KLGP TH(S PLAN SfT OI�Sf�E AT ALL TI�iGS 20i1 p���e� Mound Desi�n www.SepticResource.com {v8rs 15.2) Praperty pwner:' Gonyea Hames Date: 6/5!?U17 Sfite Addressr 600 Pinehurst Court . PIO: OG11723340007 Comments: instructions: � =e�ter data � =adjust if desiced � = compuker catcutated-DO NOT CHANGE►. i► �bedraom Type � itesidential :System �� 750 GPD design ftow ;� Yes Garbage disposat or pumped to septic 5t�larger tank with muttipte comp/tanks �t 2250 Gat Septic tank(code minimum) 2250 Gat SepUic tank(design size / LUG reqtl) Tank opCions: none » �•2 GPD�ftz mound sand toading rate contour loading rate of ]2 rieq's a min 62.5 ft. long rockbed ; 90.0 ft rockbed width G3.0 ft rockbed tength �; 3.0 ft lateral spacing 3.0 ft perforation spacing (maximum of 3 for both) end feed :manifold connectio� sti �3 laterals b1.0 #eet tong 21.0 perfs/tateral 63 perfs iotat (1/2 a perf ineans the first perf starts at the middle feed manifatd) ai 7l32 inch perfs at �1 feet residua!head gives U.56 gpm flow rate per perforation for this perf size fz spacing, f�pipe size on line 72,max peifs/tatera!= 30 ,line#8 must be tess--> u�: ic�i 4.0 doses per day (4 minimum) �>> 188 gaUons per tlose (treatment voiume) 2.00 5x i_� 2.00 inch diameter laterais must be used to meet"4x pipe volume".requirement - 2.U0 3x u� 45 feetof 2.0 inch supply iine teads to�8 galtons of drainback vatume (Tip:"top feed"manifotd to controt the drainback) �ai 196 gaUons TOTAL pump'out voiume(treatment+drainback) rs� 12 feet yertuai tift from pump to mound taterats, leads ta a: �6; 36 GPM @ 19 feet of head, Pump requirement (note: �SOgpm may require an extra 3-6'of head) i>> �gal Dose tank(code minimum} 13Q0 gat Dose tank(design size/ LUG req d) at 25.49 gpi leads to a tss 7J inch swing on Demand float, or timed dosing of 5.4 min ON (confirm pump rate with drawdown (this.detivers Average fiow,=70%of Peak design f'low)ehcs OFf test and adjust as necessary) �v, 12 inches from bottom of tank to°Pump OFF"f(oat ��� 20 inches from bottom of tank to"Pump OM float, or 12 inches�o'Timer ON"float if xime dosed �i; 23 inches from bottvm of tank to"Hi Level"ftaat,or 33 inches to"Hi Levet"float if time dosed �.�i 714: gallflns reserve capaci#y '(after High tevet Alarm is activated) �, 0.6t) gpdJft2 Absocption area Soil Loadin�Rate, which gives a mound ratic of 2 (minimum) (this must match the soit borir�tog) desired mound ratio 2.0 �a� �Pert�entsite slope (0-20%range) �(;�dowtutope site siope, if different.than upslope) �,� 1b inches, or 1.3 ft. to Redox or other tiraniting tondt�ion (need at least 1Z"�o be a Type i) Treatment zone contains�inches of 0%soit credii,and�inches of S0�soit cfedit. Giving,a: �h� 20 inch,or 1.7 ft. 5and Ciff Mound CRITICAL FOR FtJ'1'URE CERTlFlCATIONS!!! _'r, ' ZO.Q ft.T4tal ABSORPTtON width (with sand beyond rockbed`as foltows:) �s� UA ft.upslope a�d sidesiope 10.0 ft. Downstope lndividual stope rat9os give BERM widths(topsoil beyond rockbed)of: �wi 4:1 upslope ratio 12 ft. upsiope becm 3�,� 3;1 sideslope 33 ft,sideslope berms 3�r 4:1 dowrislope 2'i ft.downslope berm z;, Overalt Qimensions: 10.0 ft:wide:by 63.D ft. 'Cong Rock 6ed 43 ft:wiQe by 89 ft. tong Mound footprint 4"insp�ctitu� pipe 18,.c�vec� top U st berm �2 Dovvnsta t�erna 2� . 12" cover on sides .r., ts"�►�`�a"t°�°� �.7 tlean sand tift . � . �.� ' "�r : : � .,, ,. � . . . . , ..F�.. , :.+ . �:�. ._ i `_ , .. �._. ..._. . `^' - � -:... ::.f..„ . ._.`._ . . . .., �., . � ,.,-:_.. . . . � :�.._�........�._..e._.,. ..._..�. .... . Absor ti�n�Midth zo;o _ -. Noie• For 4 tu 1�stopes,.4�isorplion Wldth is measure�l#rom the Be+dequaliy in botfi directions. For stopes>1�, ,4bs�rpt�on l�l�dth is measared dav,tnhitf ffi�rn the upslope edge of the BerJ. 33i Rock 8ed: 10.0 ft.by 63.0 ft. by C�inches under pipe,plus 20%gives 21 Yd'or*1.4= 29 ton ss, 1Nound Sand: (note:valume is based.on 3s1/4:7 siope from top of rockbed, Exchange sand for toamy cap i#desired) 35:5 up � 75.2 downsiope + 11.1 ends+ 44.7 under rack= 20� yds or'i.4= 2$0 ton plus 20% �s� Loamy Cap: 39 ft. by $5 ft. 6"deep, Pius 2096 giyes 74 .yd'or•1.4= 109 ton �r Topsoil: 43 ft:by 89 ft. G"deep, P1us 20%gives �Yd'o�•1:4= �20 ton 1 hereby certEfy thai,l have compteted this work in accordance,with all applicabte drdi�ances, rules and taws. � ��--....._..� ,�-;..� Rusty olson's Soif&Pe�c 810 615/.2017 - igner Signature Company Li+cense�# Date INSPECTOR CHECKLIST - mound 6W t��nehutst(.ouri � ���ELL seclsacl:s: 20'to pressure tesfed sewer line (5 psi for 15 min) 50'to everything 100'to dispersal area with shaltow welt PROP�R'T'l'LINES sz�brn:k: 10'to everything Road secback: ptatted: 10'prop lrne: Metes Fr bounds: out of road easement,or outer ditch. I.AKF:BLi;'FF s�tback: �0'for btuff. Lakes:GB_, RD_, N� Protected�tta�d_. au;ld;ng setbacl:�: 10'far eYeryihing, 20'for dispersat ar�a. WATER Ui'�E uAder pressure se 10'ta bed,Gank&sewer iine. �else sewer line� 12"below) � Sewer line Er baffle connection (no 90's; 3'betwee�45's, stope min 1"in'8`, ma�c 2'in 8') (no depth req's, clean.out every 100', Sch 40 pipe) � Septic tank and risers (watertight; insutated, proper depth, existing verified by pumping} mfg 2250 gaitons iaone Rtser over outlet, riser over intet oc center, and 6"+inspectian pipe over any remaining baffles. No effluent fitter£�atarm Dose tank risers and piping (water tight, insulated, proper depth, drainbacic) mfg 13� gaUons � dose pump 3b gpm 19 head VERIFY PUMP tURVE 5.4 min oN 9 hr OFF � ftoat setting drop 7.7 inches at 25.5 gpi "DESIGNED" 4.9 inches approxftoattether length �96.0 gai dose divided by gpi "INSTAILED"= inches#loai drop (field corre�cted LABEL pump requirements and drawdown oti riser orpanel Cam loek reaehable from grade-30"max: J-hook weep ho(e. Supplyline access {no fiard 90's) 2.0 inctt suppiy pipe:Sch40, stoped 1!8"+, supported by 4"xh40 sleeve or compacted, and buried 6"+, splice box/controt panet/etectrical connettions ftnw measurement CT, EfM, time.dosed, home water meter mou�d absorption area rough up mound rock diEnertsions ,10.0 X 63.0 Sand lift depth 20 inches. {Jar test c 3"sand teaves< 1/8"siit a'fter 30 min j � Absorption Sand beyond rock 0.0 upslope 10.D downslope � Bermed topsoil beyond rockbesi 12 upslope 13 sideslope 21 downstope cover depth'of 1Z�t8"+ 1/ERIFY 3 laterais (13'from edge ofi rock) 2.00 inch pipe size (Sch40 pipe&fittings� . 3.0 ft tateral spacing 8 7132 inch perforations 3.0 ft perforation spacing Au intet at�nd of`taterats, and at top feed manifotd if necessary. YER1F1f ctean outs (no hard 90's) 4"inspection pipe to bottom of rock;anchored YE�tiFY Abandon ex�sting system- if necessary �Re-use existing tank certification monitoring plan and type welt abandonment fQrm -if necessary �. ►_a�1kA�N_�12.1!^1�t4!MX, - Syster�n Ele�atians �' � ,,d.are�,�n..,a.,...,... � � - benchmark :,._.,_. - J' _ _ -- SHW7 - - ��nno�na 1` �Grade el�vations ar�ex(sttng. !f a ioamy cap differenE tinal�rade�s destred iC shauld _,�___,_ 1al�ral b�shown and descr'rbed here.) botto�rack $!`ade {at up�lope rcx k betl� , $IiV�'�' (af upslope rUc k bed) � ►� 1 � �; _ -� ... , .. � � l I 1 r � r r � r sewer pi�e exitinghouse 5ept�c7�ttk 5eptit?�ank 4i��p��K�b�e) PumpFank �Grade Grade G�ade ____,�r,r Grade Pi� � inl�t in1eE iniet `fank bottom ,� 7ank ba�tom � Ta�k battom Percolation Test Data Sheel L+c.#$10 Percota#ing tes#readings marle by_ Rusty C}Ison`s Perc. starting at 2:39 P.M. C?�7/a2t14 �_�cation� Lt�t 79.Blk 1 Hole�urnber:4 Date haie wa$prepared 7l01114 t�epth of hois bottom_12"`fnches.�iamefer of hole_6"_inches. Soil dafa from#e�hvle: �epth, inches BQiI texture fl-6" Dark brown Iciaart�9�yr3/2 6"-12° Brown loam 1 tlyr4i4 �leihod of scr�tching side wa!!: Knife Depih of grav�i in bot#om of hole 2 inches: �ate ofi initiad wa#er filiirg 7J01�9�4 �fepth of initial water fiiling 12 ir�ches abaue hole battam. f�Aethod used to maintai��at leasi 12 inches of water depth in hole for a# leas#4 hours Automatic Siphen Masumum�nrater depth rbove hole bottam d�,rinQ tests 6 inct;e<. Time Tirne Depth Drop in H2(� �'erc Rate ::.�JZ 3:V7 6�s i_1 13.& 3:08 3-23 6" �.q i�_� 3:30 3:35 6" 1:'1 13.6 AVERAGE R�RC_ RATE 13.fi MPi Percolation Test Data Sh�e� Lic.#$1(l Percolaiing,test readings ma�ie by; Rusiy Olsan's Perc, starting at 2.39 P.M. On 71p2/'i4 :.ocat�on. Lot 1 S, Blk 7 `-i�ie rtumber: 3 �ate hole was orepared 7l03?14 De�th of hole bottom��2"�fnches, Cliameter of hoie 8"_in�hes. Soii daia from test ha1e: aepth; inches Soi!texiure �-�" Daric brown I�am 1 D�+r3l2 o'-�t2" Brown ioam 10yr4J4 Meihod of scratching side walt: Knif� �epth of gravq3 in bottotn aF h�le 2 inchEs. �ate of ini#ia!wate� fillin� 7:t}1/14 depth of initiat wa#er filting 12 i�ches �nove hale boitom. Method ussd it� maintain ai leas# 12 inches of waier aepth in hole for at least 4 hours Rutomatic Sip�►on �axim�rm water deptta above fi�o1e t�ttam cl�ring tests 8 inches Time Time , flepth Drop ir�HZO Perc R�te �'S1 3_t)6 B�� 1.4 13.6 �'09 3:24 6" 1.'! ?3.6 �:29 u:3�t 6" 1:1 '13.6 A1/ERAGE PERC.RATE 13.6 MPt ' i Percotation Test Qata Sheei Lic.#81 C F�r�olatin�telst readin�s made by: Rusty Olsan's Pera, starting at 2:39 P.M. �n 71U2114 Location: LOt 19. 81k 1 H�le numt�r:�2 Rate hole w�s preoared 7!01t14 �epth oi hois bottarn_1�"�inches, Diameter o1 hQle_6"_iriches. Soii data frar�tesf hote: Depfh, inches aoil texture 0-8" Darit bfawn loam�Oy�312 8"-12" Brown toam 10yr4t4 +illeihod of scra#ching side wall: Knife Depth of gravel in boi#om of hole 2 it�ches: t3afe of initial water fiifir.g 7/01114 depfh of itti#iat water filting 12 inc#�es afl�ve h4ie bot[om. Method usec} iQ maintain at teast 12 inchss of wrater depth in hole for at teast A hnurs Automatic 8ipnon tUlaximum water depih�bove hole botiam during tests 6 inches Time Time Uepth Drop in H2� perc Rate 2:50 3:05 6" 1.fl 15.Q 3:�0 3:25 G" 1.t} 15.G� �:28 3:33 fi" 1_Ll 15.0 AVERAGE PEF2�.RATE 15.0 MPI : "' , ' . Per�o[�fiQn Test Data Sheet Lic.#810 Percolatin�tes-t readin�s made by: Rusty�ison's Perc. starting at 2:39 P.M. On 7t0?_l1 d, �.ocatiott: L�t 19. SIK i Hole number�? Date hole was p�p�red 7/4911� , Jepih of hoie pottom�i Z"_rrtches, Diamete�of hale_6"_ir�ches, Soil�ata fram test hole: �epth, inches Soil texture iJ-8>, Daric brown loam 10yr312 8"-'12" Brawn loaen 90yr4i4 Method of scrafching si�e watl: Knife De�tt�of c�tavei in boftorn oi ho{e 2 inches �ate of initiai watee fiilir�g 7lt�1�1d depth af init�at water filling 12 inct3es above hole bottorr. Method used t� mai!ttai.a �t least 12 ir�ches ot water depth in hote for at least 4 h�vrs f�uiomatic Siphor� ��axir�um wa#er depth abfl�e hole bottam during tesEs 6 inches Time Time Depil� rap in H2D Perc}�ate 2:�48 3:t]4 �" '[:3 11.5 3:?1 3.�6 6" t.2 12_5 3:r? 3:32 �" 12 12.� AVERAGE PERC. RA'TE 123 l�14p{ -, � . . Lflas of Soif Borinqs License#810 �ocatian flr Project: L,�t �f 9. 8!k 1 Borings made by: Rus#y�Isan's Sait and Perc testing 6/7l2d14 Classification System� AASHO ; USOS�USi3SSCS � : Unif'�ed ,• Other Auger used`check twoj: Hand,_X , or Power,_,,Flight, Bucket or Probe_X� Bcxing Numb�r_f_Surface elevation_983.+� #�ottled S�ii af 9.8 fset 0„-S.,Dark brown loam t�yBI2 H20 present at_X_ 6"-T2"Btown ioarrt 1Dyr4f4 12"-22"Browr�Ioam i0�r5�4 22"-28"Rusty brou+n lnatr►1Oyr5/4 Boring Alumber_2_Surface elevation_983.2 Moftled Soil at 1_2 fieet 0"-�"Dar�c br�wn loam 9 0yr3/2 H24 present at,_,_X� 8"-44"Brown loam 1�yr�4;3 14"-20" Rusty browr�laam 10yr414 Bacin�Numbsc_3 S�urfa�e elev�tion,_985.1 AAottled Sot1 at�1.3 feet 0"-8"Dark brawn Ioars� i�yr3/2 H20 preseni at!X_ 8"-16°Srown bam 10yr4�4 16"-22" Rusty brown loam 1�3yr5/4 Borirrg Number_4_Surface elevaiion`98�.T ` Mc�##led Sc�il at 1_5 feet �"-ifl"i?ark brown iQarr 1�yr3t2 H24 pres�n[at`X,� 10"-'t8"Brown loam it3}�r4d3 13"-26'"Rusiy brovsm la�m 10yr4/4 8o�ing Numi�er_5.Su�€ace etevation_984.8 Mtittied Soi1 ai 1.7 feet 0"-8"Daric bro�rvn ioam i0yr312 H20 pceser�t at_X_„_ 8"-1a"Brown toam 10yr414 t�"-20� Rusty bro�srn ioam 1�1yr514 Boring Numbarl6 Surface elevation_985.1 Mottied 8oit at 1:5 fee# 0..-90"Qark brown.ioam 10yr3!2 H20 presen#at_,X i 4 0"-i 8"�rowm loam 10}�r4l3 � �8"-2fi"R�sty brown toam 1 Dyr4i4 . � a �' � � � �� � ; , � �' a $ �. � � � � -� � � w � t.A � O ! �, C � � � � � �In -"' S � j` . � � n, ! 1 r k, � , � �� �. ;� � � � � � � � � {� � i� � � n' Q ,p " p �f? � • F� 47 . • � ¢ � i.� �' � �"r �j � � � �� � 'Y' • tV x � � . f �� � j� � � � �' � � ! P� ��' �, �'' �' � � , � � � �� �, � tr � � � � � � � . ._... ; „ � _ � �' �' `� �� �' i� ry }{ . . �' p '�+ � t. � � � � �+ �� � � - � � � �k � I� ` Iw i � � � � �y- s �� . , � ,� �, � � 4 1� � � � r"s � �' �{� • dt 7 "� � r � � 3� ,� � � � � ; � � � � � +r �a • �d► j �� �..;� � � a {`"� # � ��y ; � �`� � R �yi' � ! � 4 • �i� � f � � ' � r f � � � �. �' � 1 � � � � � � � �, �� � � �� � � � � a � }. � � � �a' � � �, � `,, ,� � ,� N �� � M �� � � , . �� ��• 1 � �' � � � r � i c � , ��'. . �� � :� � ! D " i � � ,�v � � •�� � ��. � , ��� � .� � � � , � .y �� y . .. �L" � .•S , � � �o , ��� � , ..° •; � � � .. � . � � . � � � _ � � � �� , � � c� � � #i � � .�� �, . � � �����i�• . � � y � �g' ►� � ����'�` . . � � � � � ������� J j . ' �� � � � � ; r���� � � � � s ; -� ��, � � �� � : � � a � �� q � i���t���� �� �+' , 4 { � . J ,� .,� �' �[ � � � � I � a ' � � � : � �� �� .. � � x � installer Summary 22� gallon 5eptic tnnk(minimum) Tank optio�: nt�e �u�n wrger canK w�tn mua�pie compi canus 13� gatlon Dox tank (minimum� at 25.49 gpi 36 GPM @ 19 ft. of head, Pump requi�ed 7.7 inch swing on Demand float afiich transtates to roughty 4.9 inct�es of float tether length if tirr��stng is required--> 5.4 minutes QN time 8 �9 i�urs OFF time 20 inches ftom bottom of tank to"{wmp ON"float,or 12 inches to"timer ON"ftoat 23 inches from bottom nf tank to"Hi Level Atarm"or 33 inches to"Hi levet atarm"if time dosed 45 ft. of 2.0 inch suppty tin� with end feed ma�ifold connection (Tip: "top feed"manifold to controt drainback) 2Q inch,or 1.7 ft. Sand Lift Mound 10.0 ft.v�r;de by 63.0 ft. tong Rock bed 3 taterats 2.00 inch di�meter 61 A ft. tong 3.0 ft. tateraf spacing 7/32 inch perfs 3.0 ft. perforation spacing No Effluent filter 8 atarm 3 ctean out&vatve box assembties 20.0 ft.Total sand ASS�RPTION width (minimum) 0.0 ft. upslope and sidestope (sand beyond rockbed, minimum) 10.0 ft. Downstope (sand t�yc�ttd rockbed, �'ninimum) Specific s�ope ratios ive BERM widths(topsaii beyond rockbedj of: 4:1 u{xtope ratio 12 ft. upstope bertn 3:1 sideslope 13 ft. sidesllope berms 4:1 downslope 21 ft.downslope berm 4"irtspection pipe 18"ca�on tap Upslape berrn �2 DownSt berm zt 12"co�rt�on sides �6'bamY caP Qt 6"tvguo�1} 1.7 Ctean sand lift 1.3 th cca lirnitir�g timfE�r� Conti�t�o��' --�_____ �._,��.__ iOrt 1Mldth 20,0 —___.�_.- _....__.__ �__ Note: Far 0 to 1%3topes, AL�sarp,thh+a►►i il7oxh is meastx+�d fr+am the B�+a+equatty in both dire�ctions. For slopes>7A6, .�►ptian Wla7h is n�asured dowr�t�itl fram the upslope e�e of the B�d. Rock Bed: � 21.Q yd3 or"1.4� 29 ton 6 inches under pipe N�und Sand: , 200 yd3 or"1.4= 280 ton catculation based on 3:1 f#:1 slope trom Lop of rockbe� Loamy Gap: � 74 Yd3 or"1.� 104 ton 6"deep TopsoiL• ' 86 Yd3 a'"1.� 120 ton 6"deep