My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-0554 - septic replaacement
Orono
>
Property Files
>
Street Address
>
P
>
Pine View Drive
>
1100 Pine View Drive - 28-118-23-42-0010
>
Septic
>
2015-0554 - septic replaacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:37 PM
Creation date
7/5/2018 1:28:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1100
Street Name
Pine View
Street Type
Drive
Address
1100 Pine View Drive
Document Type
Septic
PIN
2811823420010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> ' - ,. <br /> CITY OF ORONO� SEPTIC SYSTEM PERMIT APPLICATION <br /> ��:������ <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> offices; however, permits will not be mailed out. The permit must be picked up in person at <br /> the City offices and work must not begin unless the permit card is on the job site. <br /> *** DO NOT MAIL PAYMENT WVITH THIS APPLICATION *** <br /> 2. Permits will be only issued to contractors holding a Minnesota Pollution Control Agency <br /> (MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. <br /> 4. The following inspections will b� required for all septic systems: <br /> A. Tank installation prior to cov�ering. <br /> B. Drainfield trench installatior� prior to covering. For mounds, inspection is required after <br /> rough up, but prior to sand placement (sand must be jar tested for silt content) and <br /> again during pressure distribution piping installation in the rock bed. <br /> C. Final inspection to verify final cover depths and to verify that all pump station (where <br /> required) components are functional and comply with codes. <br /> 5. MPCA licensed Installers or their DRP (Designated Responsible Person) shall be present <br /> during all inspections. <br /> A 24-HOUR NOTIQE IS REQUIRED FOR ALL INSPECTIONS. <br /> 3 /2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.