My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-0554 - septic replaacement
Orono
>
Property Files
>
Street Address
>
P
>
Pine View Drive
>
1100 Pine View Drive - 28-118-23-42-0010
>
Septic
>
2015-0554 - septic replaacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:37 PM
Creation date
7/5/2018 1:28:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1100
Street Name
Pine View
Street Type
Drive
Address
1100 Pine View Drive
Document Type
Septic
PIN
2811823420010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. � DISTRIBUTION MEDIA: REGIS EATMEPlT PRODUCTS: CHAMBERS AND QFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Com�nent Length: ' ��ft Enter the Component Width: ��ft <br /> C. Number of Components per Ro1w=Bed Length divided by Component Length (Round up) <br /> �� ft = ft= ��components/row <br /> D. Actual Bed Length =Number o Components/row X Component Length: <br /> ��component} X �ft = �ft <br /> E. Number of Rows=Bed Width divided by Component Width (Round up) <br /> � ft= �� ft= � rows Adjust width so this is on who(e number. <br /> F. Totat Number of Components=�Number of Components per Row X Number of Rows <br /> �� X � _ �components <br /> 6. MOUND SIZING ' <br /> A. Calculate Minimum Clean Sand�.ift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 1.7 ft = 1.3 ft Design Sand Lift(optional): �ft <br /> B. Calculate Upslope Height: Clean Sand Lift +media depth+cover(1 ft.)=Upslope Height <br /> 1.3 ft + 1.0 ft + 1.0 ft= 3.3 ft <br /> C. Select Upslope Berm Multiplier('pased on land slope): 3.45 <br /> Land Siope% 0 1 '2 3 4 5 6 7 8 9 10 il 12 <br /> Upslope Berm 3:1 3.00 2.91 .83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 .70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upslope Berm Width:Muttiplier X Upslope Mound Height =Upslope Berm Width <br /> 3.45 ft X 3.3 ft = 11.0 ft <br /> E. Calculate Drop in Elevation Und�r Bed: Bed Width X Land Slope= 100=Drop(ft) <br /> 10.0 ft X 8.0 % : 100= 0.80 ft <br /> F. Calculate Downslope Mound Hei t: Upslope Height+Drop in Elevation =Downslope Height <br /> 3.3 ft + 0.80 ft = 4.1 ft <br /> G. Select Downslope Berm Multiplie�(based on land slope): 5.88 <br /> Land Slope�0 0 1 3 4 5 6 7 8 9 10 11 12 <br /> Downsiope 3:1 3.00 3.09 3.,19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4. 5 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.�4 7.69 <br /> H. Calculate Downslope Berm Widthy Multiplier X Downslope Height =Downslope Berm Width <br /> ' S.88 x 4.1 ft = 24.0 ft <br /> 1. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width+4 feet <br /> ! 10.0 ft +�ft = 14.0 ft <br /> J. Design Downslope Berm=greater bf 4H and 41: 24.0 ft <br /> K. Select Endslope Berm Multiptier: I 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endstope Berm X Dowrrnlope Mound Height =Endslope Berm Width <br /> 3.00 ft X 4.1 ft = 13.0 ft <br /> M. Calcutate Mound Width: Upslope Blerm Width +Bed Width+ Downstope Berm Width <br /> 11.0, ft + 10.0 ft + 24.0 ft = 45.0 ft <br /> N. Catculate Mound Len�th: Endslope�6erm Width + Bed Length +Endslope Berm Width <br /> 13.0, ft + 63.0 ft + 13.0 ft = 89.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.