My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design/subdivision purposes only
Orono
>
Property Files
>
Street Address
>
P
>
Pine View Drive
>
1100 Pine View Drive - 28-118-23-42-0010
>
Septic
>
septic design/subdivision purposes only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:38 PM
Creation date
7/5/2018 12:48:26 PM
Metadata
Fields
Template:
x Address Old
House Number
1100
Street Name
Pine View
Street Type
Drive
Address
1100 Pine View Drive
Document Type
Septic
PIN
2811823420010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� _ OSTP Pressure Distribution Y��,;��� <br /> � , UNIVERSITY � ° �` <br /> Mi�nesora Poilution Des�gn Worksheet OF MINNESOTA �;.� . r ,� � <br /> Control A enc •� �, <br /> ProjectlD: v 11.09.22 <br /> 1. Select Number of Perforated Laterals in system/zone: � _______ <br /> (2 feet is minir►wm�ond 3 feet is maximum spocing) ��'"�""":.""'�" <br /> �� _ .. � ' 'r Y� <br /> 2. Setect Perforotion Spacing: 3.0 ft ,�.`�. • ';�--5oi1 �"`• ' ' � - <br /> -� t - <br /> MlnimWn <br /> `/.'pCrlwatioM syated 3'aP.xl 7'-1'ol rtxk� � � t2' � <br /> 3. Setect Perforation Diameter Size 7/32 in _ _ <br /> � �6'�ofrock � <br /> 4. Length of Laterals =Media Bed Length-2 Feet. ���.,i+����,:�,.-�o'!." Perloratbn spacinq:2'to 3' <br /> 63 - 2ft = 61 ft Perforation can not be closer then 1 foot from edge. <br /> 5• Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spoces = 61 ft = �ft = 20 Spaces <br /> 6. Number of Perforations per L.ateral is equal to 1.0 plus the Number of Pert'oration Spaces (Line 5). <br /> Perforations Per Latera! = 20 Spaces + 1 = 21 Perts. Per Lateral <br /> Check table be(ow to verijy the number of perforations per laterat guaruntees less than a 10%dfisclwrge variotion. The vo(ue is <br /> double if the a center nwnifold is used. <br /> Maximum Mennb.v o#P�rforatiur�Fer Laterai to Guarbntee<fD96 flischarge Yariatia� <br /> ,,Enc P oraboaz 7/321nch Perforations <br /> Perforatio�SpMinB(Feet) �PQ Diameter(tntE�s1 Perfa�ation Spacing Pipe Diameter(inches) <br /> f 116 1Yt 2 3 (Fee!) t t1� 1V: 1 3 <br /> 2 �0 13 18 30 64 2 1t 16 21 34 b8 <br /> �� 8 12 1b 28 5-t 21h 10 14 10 32 b4 <br /> 3 � 12 16 Z� 52 3 9 14 14 30 60 <br /> 3�'161nct►Petfaratians iB Inch Perfarations <br /> Peiforatron Pipe E?ia+reter r#nches? PerforaEion Spacing Pipe Diameter(Inches) <br /> spacir,g IFeet) <br /> 1 115 t�t 1 3 fFee!) 1 t+k it; 2 3 <br /> 2 1� 18 26 9b 87 2 21 33 44 T4 149 <br /> 2ti': 11 17 24 4(? �0 2fh 2Q 3Q 4 t 69 135 <br /> 3 1$ 16 22 37 75 3 20 29 38 b� 128 <br /> 7• Totol Number of Perforat�ons equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Lnterals (Line 1). <br /> 21 Pert. Per Lateral X �Number of Perf. Laterals = 63 Total Number of PerF. <br /> �—_�__.____.___�__---------- <br /> 8. Calculate the Square Feet per Perforation. Recommended va(ue is 4-f0 ft 2 per perforvtion. °Kfo^"°^D1���6P"'� <br /> Does not appl y to At-Grades ��`rt� Ao.ro.+�oi...a. <br /> ��� ��� r��� ��� <br /> Bed Area = Bed Width(R)X Bed Length(ft) <br /> LO' OJ6 O.N � 0.56 0.7t <br /> 1.S O.I2 O.St O.f9 0.9 <br /> 1� ft X 63 ft = 630 ftZ zo� o.�a oss o.m �_w <br /> zs o.z9 o.as o.n �.n <br /> s.o o.az o.sz o.so �.re <br /> Squore Foot per Perforotion =Bed Area divided by the Tota!Number of Perforations (Line 7). ..o 0.3� o.� ,.,a ,..� <br /> s. o.a� o.n �.:s �.as <br /> 630 ft2 .- 63 perforations = 10.0 ft2/perforations ���� p�,��h 3/16 inc�tv t/4 inch <br /> Dwellf��with t/d inch pMorallo� <br /> 3fee[ OCBeratadk�mentsaMM575wfcA3l�6 <br /> 9. Select Minimum Average Heod: 1.� ft �ncn w va�ncn oertoratb�s <br /> 5 teec aher esublkNnents aiW u5T5 with t/8 incA <br /> pMaatiau <br /> 10. Select Perforotion Disclwrge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11• Determine required Ftow Rcte by muttiplying the Total Number of Perforations (Line 7)by the Perforotion Dixhorge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.