Laserfiche WebLink
J <br /> `� and rear lawn. It is the hope that the MWCD will recognize the <br /> `� homeowner's quest to make environmental improvements. <br /> Buffer averaging will be used to supply appropriate amounts of <br /> �� buffer zone in additional areas of the property. <br /> g. (�-a) Current survey of property and most recent delineation is <br /> � enclosed. Copy of survey with proposed pond is also enclosed <br /> �► with suggested excavation deposit area noted <br /> `r <br /> � h. (5-b) A current Wetland Delineation was previously submitted to <br /> the MCWD for review by Svoboda Ecological for the proposed <br /> �� property. Approval of the delineation is expected as the area was <br /> slightly enlarged by James Whisker of the MCWD from the <br /> �, Ii�� original area set forth by Svoboda Ecological. The new area has <br /> J 1► been surveyed and appropriately recorded. Concerns of that <br /> I report are the timing in which the survey was done immediately <br /> following tremendous amounts of rainfall. While certainly this <br /> `t expertly conducted there is not an exact science to this process <br /> and would request review of the delineated area through out the <br /> growmg season. <br /> �� i. (5-e-1,2, 3) Cross section of ond attached. Pond de th will not <br /> P p <br /> Custom Design exceed 5 feet. Basin sides wi11 have a range of slopes from 3:1 to <br /> & Installation 10:1 <br /> j. (5-e-4,5,6) On site spoil disposal is preferred. See Survey for <br /> suggested locations. <br /> 4. Install water movemendaeration system to alleviate open water <br /> stagnation as needed. <br /> (952)473-6649 Tel, a. Option 1 <br /> (952)473-6661 Fax Install an Aquascape Designs Inc. constructed wetland and snorkel <br /> systems in which pumps are placed to pump water from the <br /> excavated open wate�r wetland to one or possibly two onsite lined <br /> filtration areas and then returned to pond via lined stream bed. This <br /> is to help avert any sedimern loading and water stagnation. Wetlands <br /> are constructed with ADI snorkel systems to allow future sediment <br /> cleanout as needed within the lined filtration areas. Please see <br /> attached information and details in regards to the ADI filtration <br /> system. <br /> b. Option 2 <br /> Install below water aerator or floating aerator. <br /> P.O.Box 508 <br /> Long Lake,MN 55356 <br /> 7 <br />