Laserfiche WebLink
Builder Acknowledgement Form <br /> #2015-01447 <br /> Builder <br /> Permit Conditions Initials <br /> Schedule a minimum of one hour for the framing inspection. <br /> Erosion control mechanisms must be installed and inspected by the City <br /> proper to any land disturbing activities. The contractor must provide a <br /> minimum of a 24 hour notice prior to inspection. <br /> Erosion control shall be installed and maintained throughout the entire �' <br /> project and must remain until vegetation has been established. <br /> No underground sewer within 20 feet of well. <br /> Prior to the finalization of and prior to closing out the permit an as-built <br /> survey and hardcover calculations must be submitted and approved. <br /> In the event of winter or other unfavorable weather conditions (which <br /> prevent the completion of the exterior improvements and/or as-built <br /> survey) a Temporary Certificate of Occupancy (TCO) may be necessary. A <br /> TCO requires a $10,000 escrow. ���Q�P ��,�� X <br /> � �. � b � �S ) <br /> Advisory Comments ��' yr �S <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, <br /> sidewalks, retaining walls, etc. not currently shown on the approved survey <br /> and landscaping plan will require a separate Zoning Permit application to be <br /> submitted and approved prior to the work commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not <br /> separated by twice of the height of the lower wall require engineered plans <br /> and a building permit to be submitted and approved rp ior to construction. <br /> w:\applications,license or permit applications\builder acknowledgement form.docx <br />