Laserfiche WebLink
G. The Developer shall pay to the city engineer the amounts incurred for the <br /> preparation of record construction drawings and City base map upgrading. <br /> H. The Developer shall submit the final Plat in electronic format. The Plat shall <br /> be created using Hennepin County Coordinates. The electronic format shall be Auto CAD file. The <br /> Developer shall also submit two complete sets of the Plat on Mylar(one copy for the City's records <br /> and one copy for recording with Hennepin County). The Developer shall also provide one copy <br /> reduced to 1"=200'. <br /> 24. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance <br /> with the terms of this Contract, payment of the costs of all Improvements and construction of all <br /> Improvements, the Developer shall furnish the City with a letter of credit, in the form attached <br /> hereto (the "security"), from a bank for 150% of the cost of the Improvements, including any <br /> required landscaping The following is a summary of the security requirements due under this <br /> Contract,which must be in place at the time of final plat approval: <br /> Landscaping $2,700.00 <br /> Erosion Control 2,500.00 <br /> Improvements + 14,700.00 <br /> Total Security($19,900 x 150%) ��� <br /> The bank shall be subject to the approval of the City Administrator. The City may draw <br /> down the security, upon five (5)business days' prior written notice to Developer, for any violation <br /> of the terms of this Contract. Amounts drawn shall not exceed the amounts necessary to cure the <br /> default. If the Improvements are not completed at least thirty(30)days prior to the expiration of the <br /> security,the City may also draw it down. If the security is drawn down,the proceeds shall be used <br /> to cure the default. Upon receipt of proof satisfactory to the City that work has been completed and <br /> financial obligations to the City have been satisfied,with City approval the security may be reduced <br /> from time to time by ninety percent(90%)of the financial obligations that have been satisfied. Ten <br /> percent (10%) of the amounts certified by the Developer's engineer, and approved by City's <br /> Engineer, shall be retained as security until all Improvements have been completed, all financial <br /> obligations to the City satisfied,the required "as constructed"Plans have been received by the City, <br /> a warranty security is provided,and the public Improvements are accepted by the City Council.The <br /> City standard specifications for utilities and street construction outline procedures for security <br /> reductions. <br /> 180976 <br /> 8 <br /> 196841v4 <br />