My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00070 - demo
Orono
>
Property Files
>
Street Address
>
P
>
Pheasant Road
>
2600 Pheasant Road - 21-117-23-23-0023
>
Permits/Inspections
>
2010-00070 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:03:36 PM
Creation date
6/25/2018 12:05:20 PM
Metadata
Fields
Template:
x Address Old
House Number
2600
Street Name
Pheasant
Street Type
Road
Address
2600 Pheasant Road
Document Type
Permits/Inspections
PIN
2111723230023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Demolition debris will be kept off adjoining property and/or the public rights-of way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfilling. <br /> 7. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and ctear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation (exccpt when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks <br /> must be pumped,crushed and filled with native soils. An inspection is required after the <br /> tanks are pumped and before the tanks are crushed and filled. <br /> 9. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents,employees and assigns from and against all claims, damages, losses or <br /> expenses, including attorney fees,against the City, its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees,agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> ,� $75.00—Principal Structure <br /> � $50.00—Accessory Structure (how many} (what) <br /> 1. Subtotal of ab�ve permit requested $ ��� C�O <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE(add 1 ines 1-2 above) $ �5 '�o <br /> The undersigned herby applies to the City of Orono for issuance of a Demolitivn Permit, agrees <br /> to do all the work in a strict accordance with the ordinances of the City and the regulations of <br /> the State of Minnesota,and certifies that all statements made on this application are complete, <br /> true and correct. <br /> Applieant's Signature: . � � Date: � —9- o2O�� <br /> Owner's Signature: ` - _ Date: v� '9` ���� <br /> Approved By: Date: Z'� �—'�� � <br /> (Building Official) <br /> * Zoning Disclosure Required?� YES ❑ NO <br /> *This must be filled out by Zoning De artment—For either answer,a Zoning O�cial must sign all applications. <br /> * Approved By: Date: Z-/� - /� ��, <br /> 7_oning Ot�icial) <br /> Reset Eorm <br />
The URL can be used to link to this page
Your browser does not support the video tag.