My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05192 - gas line inspection
Orono
>
Property Files
>
Street Address
>
P
>
Pence Lane
>
2715 Pence Lane - 21-117-23-32-0007
>
Permits/Inspections
>
2002-P05192 - gas line inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:06:10 PM
Creation date
6/21/2018 2:00:32 PM
Metadata
Fields
Template:
x Address Old
House Number
2715
Street Name
Pence
Street Type
Lane
Address
2715 Pence Lane
Document Type
Permits/Inspections
PIN
2111723320007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � �. ' �E����'�D .'JAN 2 2 ZflQ� <br /> � �_.� ,��__ . .___... <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> LJNTIL YOU RECEIVE A PERNIIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Desi�ns- Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat losslheat <br /> gain calculation, desib temperatures, equipment ratings and identification as to type, manufacturer and <br /> model. Data shall be presented on form provided. Identification of and specifications for�vater heating <br /> equipment snali aiso be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected(rough-in and final). Call (952)249�600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions <br /> Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> Ii�ICOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call <br /> (952) 249-4600. <br /> Please check one: ❑ New �ddition ❑ Repair ❑ Repla idential ❑ Commercial <br /> JOB SITE: �� �� p� D y�r���,� Zip: +S � <br /> Owner's Name: `.���,5 �, , Phone Number: � • <br /> 4 71•�1�-5��- <br /> Mailing Ac�drPss: ���„�L ^ity: Zip. <br /> Contractor's Name����,,,p }�f/kL�/J�_. Phone Number: _� — <br /> Mailing Address: ��'�� ;a n`� City: 5- ip: SS� CE 7 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.