My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01052 - demo
Orono
>
Property Files
>
Street Address
>
P
>
Partenwood Road
>
925 Partenwood Road - 08-117-23-21-0010
>
Permits/Inspections
>
2011-01052 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:42:11 PM
Creation date
6/20/2018 12:13:24 PM
Metadata
Fields
Template:
x Address Old
House Number
925
Street Name
Partenwood
Street Type
Road
Address
925 Partenwood Rd
Document Type
Permits/Inspections
PIN
0811723210010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep-��11 G8:32a Wickenhauser Excavating 9524662827 p.2 <br /> 2. Demolition debris will be kept off adjoining property anct/or the public rights-of way unless <br /> specific prior approval is obtained in writing for temporary use thereof <br /> 3_ Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> S. Water wells must be abandoned in accordance with State Health Deparimeni regulations. <br /> 6. Ins�ection required when all debris has been removed,before backfilling. <br /> 7. Within 5 working days of superstructure remaval, a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris, with any excavation filled with earth leveI with <br /> the adjacent ground elevation (except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. Septic systems m�st be abar�doned per Minnesota Rules Chapter 7080. A11 septic tanks <br /> must be pumped, crushed and filled with native soils. An inspection is requirec�after the <br /> tanks are pumped and before the tanks are crushed and filled. <br /> 9. The �ndersigned owner shalt and hereby does indemnify and hold harmless the City of <br /> Orono,its agents,employees and assigns from and against all claims,damages, losses or <br /> expenses, incluc�ing attorney fees, against the City, its agents, ernp�oyees and assigns azising <br /> aut of or resulting from the demolition described herein as perf'armed by the property owner, <br /> his employees,agents, subconrractors or assigns. <br /> PERNIIT TYPE AND FEE C.ALCULATION <br /> 575.00—Principal Structure , �- <br /> ❑ $50.00—Accessory Structure (how many) � i � (what) <br /> 1. Subtotal of above permit reyuested $ <br /> 2. State Surcharge $ 5.00 <br /> 3. TOTAL PERIVIIT FEE (add lines 1-2 above) $ �� (/ � O�i <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit,agrees <br /> to do all the work in a strict accordance with the ordinances ofthe City and the regulations o�' <br /> tl�e State of Minnesota, and certifies that all statements made on this appJication are complete, <br /> true and correct. <br /> r <br /> Applicant's Signature: _�'L d 2 y�!'�'2��-u�`'`�' Date: �- ����� <br /> Owner's 8igaature: Date: <br /> rJ �Appraved By: y In.r•�� Date: � r Z�j ` l <br /> {Bui�ing Ofricial) <br /> * Zoning Disclosure Reguired? : ES ❑ NO <br /> *This must be filled out by Zoning 1}e�artmen —For either answer,a Zoning Official mus��ign all a�plications. <br /> �' APProved By: ' `�� � Date: � � / C' �A <br /> (Zoning Ofi"icial} <br /> Reset Farm � f�r�y. Q,V� U� ���'��y ��"' "`�� ��� �� <br /> �(�,VY1��`' � <br />
The URL can be used to link to this page
Your browser does not support the video tag.