My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00044 - new structure
Orono
>
Property Files
>
Street Address
>
P
>
Partenwood Road
>
915 Partenwood Road - 08-117-23-21-0011
>
Permits/Inspections
>
2010-00044 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:42:12 PM
Creation date
6/20/2018 11:19:16 AM
Metadata
Fields
Template:
x Address Old
House Number
915
Street Name
Partenwood
Street Type
Road
Address
915 Partenwood Rd
Document Type
Permits/Inspections
PIN
0811723210011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PeRnit# <br /> Permit Date <br /> REScheck Software Version 3.7 Release 1 <br /> Compliance Certificate <br /> Project Title: SAFAR RESIDENCE <br /> Report Date:01/19/10 <br /> Energy Code: 2000 Minnesota Energy Code <br /> Location: Hennepin County, Minnesota <br /> Construction Type: Single Family <br /> Glazing Area Percentage: 16% <br /> Construction Site: Owner/Agent: Designer/Contractor: <br /> Lot 2,Block 3 Partenwood Mary Safar David MacPherson <br /> Orono,MN 55356 925 Partenwood Road Steiner&Koppelman,LLC <br /> Orono,MN 55356 18340 Minnetonka Blvd. <br /> 952-471-9248 Wayzata,MN 55391 <br /> mjane612@aol.com 952-473-5435 <br /> davem@steinerkoppel man.com <br /> i • s • • •�' <br /> • . • . • • <br /> � � • � ��• <br /> . • <br /> Ceiling 1:Flat Ceiling or Scissor Truss: 2866 44.0 5.0 69 <br /> Wall 1:Wood Frame, 16"o.c.: 4593 22.0 5.0 174 <br /> Window 1:Above-Grade:Wood Frame:Double Pane with Low-E: 707 0.320 226 <br /> Door 1:Solid: 64 0.240 15 <br /> Door 2:Glass: 43 0.320 14 <br /> Basement Wall 1:Solid Concrete or Masonry: 305 10.0 10.0 11 <br /> Floor 1:Slab-On-Grade:Heated:, Insulation Depth:3.5' 37 10.0 25 <br /> Fumace 1:Forced Hot Air:90 AFUE <br /> Air Conditioner 1:Electric CenVal Air: 13 SEER <br /> Furnace 2:Forced Hot Air:90 AFUE <br /> Air Conditioner 2:Electric Central Air: 13 SEER <br /> Compliance Statement:Statement of Compliance:The proposed building design described here is consistent with the building <br /> plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet <br /> the 2000 Minnesota Energy Code requirements in REScheck Version 3.7 Release 1 and to comply with the mandatory requirements <br /> ' e ' the EScheck Inspection Checklist. <br /> � ��d2� Ire� � T�O�QfZ`Iw1✓�.�l-�i ` • �� , t p <br /> Builder/Designer Company Name Date <br /> SAFAR RESIDENCE Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.