Laserfiche WebLink
1 1 <br /> Memorandum �Bonestroo <br /> 2335 Highway 36 W <br /> To: Darren Amundsen Project: Safar Residence �ate: 2/12/2010 St.Paul,MN 55113 <br /> Tel 651-63G4600 <br /> From: Gary Morien Client: City of Orono Fax 651-636-1311 <br /> Re: Permit No. 2010-00044-915 Partenwood Boulder File No: 000139-10000-2 "^Nw•b°nestroo.com <br /> Retaining Wall Plan Review <br /> Review Summary: <br /> Calculations for the wall have not been provided. A global/slope stability review has <br /> not been provided. The Engineer of Record shall review actual site conditions and <br /> judge whether or not global stability analysis is required. Owner/Contractor shall be <br /> aware of and follow the suggested quality assurance provisions noted on the <br /> Engineers plan. <br /> Site drawings showing the wall layout relative to bounda r��'f U"/,n � <br /> features were provided. Wall layout, notes and details oi �� l►� I � G���W�- <br /> Letterhead that appears on the plans indicates the desic <br /> professional engineering company and content is judge� ���JJ��'�� �e��� � <br /> for this type of work. Review plans provided were not s <br /> engineer. �//�p,� �e (� P�� <br /> (/V �w�� � <br /> The wall is located adjacent to the driveway. No trafFic I n /� i/ „`r D <br /> location. The requirement for protective barrier should �v� ��� � �� . <br /> incorporated into the design and construction. _ _ <br /> Detailed Review: � � � r° '��" "� (� <br /> At your request, we reviewed of the retaining wall su ��'� � G� � <br /> project for compliance with the code requirements ai �(/��,,;„ ` <br /> submitted information is as follows: ���J <br /> Project Name: Safar Residence <br /> Wall Design Engineer: Civil Solutions Group, LLC <br /> Developer: Unknown <br /> Plans Received: 1)Title sheet 2) Site plan 3)Typical wall section details <br /> Issue No.: lst issue, plan date 2/4/2010 (no revisions) <br /> Retaining Wall Calcs: No Calculations <br /> Date Received: City of Orono - February 8, 2010 <br /> These are privately owned retaining walls that will be installed at the Safar Residence. <br /> Review notes include: <br /> • Plans were prepared by an Engineering Consultant and plan content appears <br /> appropriate to direct retaining wall construction. <br /> F:\Bonestroo Templates\St Paul\Memorandum.dot[CRW 9-2008] <br />